Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Rejected-Technical | Rejected-Technical Rejected |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
3 May 2023, 2:00 pmClosed
SE/MEDC/Mettur
Oo SE/MEDC/Mettur
Works Contract for Town Omalur section in Omalur sub division in Omalur division
2023_EB_304356_1
SE/MEDC/AEE//MM/MTR/Spec No.001/23-24
Open Tender
Electrical Works
Works
365 days
SE/MEDC/Mettur dam
EMD and documents as per BQR conditions
2 documents required · 2 mandatory
₹0
₹25,000
15 May 2023
20 Apr 2023
4 May 2023
20 Apr 2023
3 May 2023
20 Apr 2023
20 Apr 2023 - 3 May 2023
Amount
Work contract schedule
Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual
Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by using JCB or manual
Stay pit 4.5' to 5' depth by using JCB or manual
Hard rock without blasting (where houses are located)
PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
PSC/ RCC poles/Metal poles above 8.00m by using JCB ormaual
Erection of stay set complete
HT "V" cross arms (all types) / Channel cross arms/ Guarding Cross arms
Tapping Channel Cross arm
LT 3 phase cross arms
LT Single phase cross arms
HT/LT TI Fittings
Fixing of Aluminium Knob
Fixing of HT pin Insulators 22 KV
Fixing of HT 11 KV strain disc.
Fixing of HT 22 KV strain disc.
Fixing of LT pin Insulator
Fixing of LT shackle
ACSR 7/4.09 mm Raccoon conductor
ACSR 7/3.35mm / AAAC 3.15 mm Rabbit conductor
ACSR 7/2.59 mm / AAAC 2.50 mm Weasel and ACSR 7/2.11 mm conductor
Releasing of ACSR/AAAC conductors from conductor drum and coiling 7/2.59, AAAC 7/2.50, ACSR 7/3.35, 7/3.15 MM
Erection of street light including fixure fitting
Erection of street light service
Releasing of single phase service and re-fixing.
Releasing of 3 phase service and (upto 50 HP) re-fixing.
Mass concreting including materials (Cement + River sand/ Msand and Blue metals and watering)
Sleeve concreting including materials (Cement + River Sand/ Msand and Blue metals and watering)
Stay Concreting including cost of materials and labour 375mmx375mmx50mm
Earthing of pole with coil earthing including burying looping and binding.
Loading of poles upto 8.0 M/ 27'
Loading of poles above 8.0 M
UnLoading of poles upto 8.0 M/ 27'
UnLoading of poles above 8.0 M
UnLoading of metal poles (All sizes)
Loading of materials
Unloading of materials
Loading or unloading of Transformer upto 100 KVA
Erection of New Transformer all capacities (with jumpering)
Dismantling of Transformer all capacities (with jumpering)
Replacement of failed transformer all capacites (with Jumpering)
Flat guarding including fixing of 2 Nos. cross arms.
Below 8 Kms (Plains)
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit
Dismantling of stay set complete
Dismantling of 1ph xarm
Dismantling of 3ph xarm
Dismantling of HT/LT TI fitting
Dismantling of 22kV Pin insulator
Dismantling of 22 kV strain disc
Dismantling of LT Pin insulator
Dismantling of LT shackle
Dismantling of Aluminium knob
Dismantling of conductor of size ACSR 7/2.59 /AAAC 7/2.50
Dismantling of conductor of size ACSR 7/3.35 /AAAC 7/3.15
Dismantling of HT "V" cross arms (all types) / Channel cross arms/ Guarding Cross arms
Dismantling of Tapping Channel Cross arm
Labour charges for alteration of Back Clamps/ Stay Clamps to suit for the works
Drilling of hole in channel only 3/4" & 1"
Cutting of pipe
Erection of Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle including concreting (Except erection of Transformer)
Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
Erection of D.P. structure with AB switch, top channel, cross bracing, earthing, painting, providing stay including concreting
Dismantling of Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle including concreting (Except erection of Transformer)
Dismantling of D.P. structure with AB switch, top channel, cross bracing, earthing, painting, providing stay including concreting
Re-sagging ACSR 7/4.09 mm Raccoon conductor
Re-sagging ACSR 7/3.35mm / AAAC 3.15 mm Rabbit conductor
Re-sagging ACSR 7/2.59 mm / AAAC 2.50 mm Weasel and ACSR 7/2.11 mm conductor
Releasing of Grills from RCC Poles
Cutting of coconut leaves
Clearing of branches of trees
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @ 3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .