Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accept |
| 2 | Accepted-Technical 143 SHASTRI NAGAR LAKHIMPUR KHERI | Accepted-Technical Accept |
| 3 | Not Admitted-Fee/PreQual/Technical UTTAR PRADESH | Not Admitted-Fee/PreQual/Technical Others-Fees and Secourity Amount Not Paid |
Tender Value
₹1.6 Cr
EMD Value
₹10 L
Closing Date
12 Mar 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy. Director Construction
Rajya Krishi Utpadan Mandi Parishad Gonda
Construction of Link Road Gram Panchayat Bhopatpur Ghinahu Purwa P.W.D. Road To Samay Mata Mandir Via Bhadai Purwa To Baba Manohar Das Purwa P.W.D. Road.
2026_RKUMP_1115225_1
C.E.(Grade-02)/(NLR)/2350-01
Open Tender
Civil Works
Percentage
240 days
Rajya Krishi Utpadan Mandi Parishad Gonda
Please refer Tender documents.
2 documents required · 2 mandatory
₹29,500
Dy. Director Construction
₹10 L
Yes
19 Mar 2026
14 Feb 2026
13 Mar 2026
14 Feb 2026
12 Mar 2026
14 Feb 2026
Earthwork in cutting or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding I/2 metre (20'g in deptk and earthwork in embankment to be in 20 cm (8") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5ffs) liíts and 30m. (100") lead. The earth from cutting to be used in making embankment or to be deposited as directed by Engineer-in-charee.
(GSB) Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification clause 401.
WBM Grading - II Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100 Kn in stages to proper grade and camber, applying and brooming Crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading II as per Technical Specification Clause 405 (Sr. 4.8)
WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming Crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 (Sr. 4.8)
Providing and applying primer coat with emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.
Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.30 kg to 0.40 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a Hotmix plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat By Hotmix Plant.
Brick edging on both sides of roads of 1st class brick 8cm(3")wide & 12 cm (4.50")deep laid with mud mortor including labour & suplly of brick finished to required templete and in proper alignment and also includingdressing & ramming the excavated earth including all labour T&P sudries required for comption of work with material
S/F of signboard as per direction of engineer in charge
S/L of NP3 Hume pipe including fixing of collar with 1:2 ccement motar as per MORD/MORTH specification.Dia 350mm Dia Pipe
Brick soling with Straigh Over Burnt bricks laid on edge (S.O.B.) & dry including preperation of subgrade to prescribed camber filling ,joints with local earth spreading blinding coat 1 cm depth of local earth over entire surface &including labour and T&P etc required for proper completion of work 100 sft. preperation of subgrade
Excavation in foundation in ordenary soile excaveted earth to be in the form of regular pits not exceeding 11/2m,in depth and earth work in embankment to be 20cm. Layer including dresing,ramming and watering the surface of the required lavel and stopes and also including 1.5cm lift and 30m lead the earth from cutting to be used in making embankment or to be deposited as spoilbank with 30m distance and also i/c 8.00 km catage . Including royalty &9.00/cum
Providing and laying cement concrete 1:4:8 (1 cement :4 Course sand :8 graded stone ballast 40 mm nominal size) including supply of all materials . Labour and T@P etc. Required for proper completion of the work and complete , also including coat of formwork in foundation.(SCH 281)
M150 brick work in 1:4(1 cement and 4 coars sand) mortar in foundation including suplly of all materials . Labour and T&P etc. Required for proper completion of the work and complete.(305b)
12 mm thick plaster 1:4 cement and coarse sand including supply of all material,labourT&P … etc. required for paper wall, outer wall, and parapet completion of work . (S.I. No. 583+Diff)
Providing ald laying cement concrete 1:2:4 (1 cement: 2 course sand :4 stone grit 20mm) including of supply of all materials labour and T&P etc. require for proper completion of work and curring complete also including cost from work in foundation and floor. (S.I. 279B)
S/L of NP3 Hume pipe including fixing of collar with 1:2 ccement motar as per MORD/MORTH specification.Dia 600mm Dia Pipe
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0%
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.75%
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 1.50%
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 2.25%
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 3.00%
Earth work in Excavation in foundation in ordenary soil (Lome clay or sand )including lift upto 1.5m and lead upto 30M and its filling,watering And ramming of excavated earth into the trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-incharge.
Providing and laying Cement concrete 1:4:8 ( 1 cement : 4coarse sand : 8 graded stone ballast 40 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors (S.I. No. 281)
M-150 class brickwork in 1:4 (1 Cement: 4 coare sand) mortar in foundation and plinth i/c supply of all materials, labour and T& etc required for proper completion of the work (SI 305b)
WBM Grading - II Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100 Kn in stages to proper grade and camber, applying and brooming Crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading II as per Technical Specification Clause 405 (Sr. 4.8)
WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming Crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 (Sr. 4.8)
Providing and laying Cement concrete 1:1.5:3 (1 cement: 1.5 corse sand: 3 graded stone ballast 20mm) including supply of all materials, labour and T&P etc required for proper completion of the work and curring complete also including cost of form work in foundation and floors. (SI 279).
Providing and laying 125 micron thick polythene sheets including supply of all materials labour and T&P.
Providing and laying 6mm thick and 9 cm deep A.C. Sheets including supply of all materials labour and T&P.
(C.C. Work Item No. 24 To 31) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0%
(C.C. Item No. 24 To 31) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25%
(C.C. Work Item No. 24 To 31) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50%
(C.C. Work Item No. 24 To 31)The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75%
(C.C. Work Item No. 24 To 31) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00%
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.89 MB
T2_06.pdf
Tender Documents • 29.74 MB
BOQ_2071220.xls
BOQ • 0.32 MB
Corriuandum.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .