| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 CrAccepted-AOC | ₹9.4 Cr Quoted ₹9.6 Cr | L1 | Accepted-AOC accept |
| 2 | L2₹9.6 Cr+₹2.6 L (0.28%)Rejected-Finance | ₹9.6 Cr+₹2.6 L (0.28%) | L2 | Rejected-Finance above |
| 3 | L3₹9.8 Cr+₹13.8 L (1.43%)Rejected-Finance 56 LAKSHMANPUR COLONY ALLAHABAD ROAD SULTANPUR | SULTANPUR | SULTANPUR | UTTAR PRADESH | ₹9.8 Cr+₹13.8 L (1.43%) | L3 | Rejected-Finance above |
Tender Value
Refer Docs
EMD Value
₹22 L
Closing Date
4 Feb 2021, 12:00 pmClosed
SE, Ayo/Ambd Circle, PWD, Ayodhya
SE, Ayo/Ambd Circle, PWD, Ayodhya
Widening and Strenthening Jasarpur Bhaupur Gangaraman Sureshnagar Road (New Converted ODR)
2021_CEUFZ_547168_1
6523/1Bhawan-Ayo/Ambd Circle/20 Date 29.12.2020
Open Tender
Civil Works
Item Rate
365 days
SE, Ayo/Ambd Circle, PWD
Widening and Strenthening Jasarpur Bhaupur Gangaraman Sureshnagar Road (New Converted ODR)
2 documents required · 2 mandatory
₹2,354
₹22 L
Yes
SE, Ayo/Ambd Circle, PWD, Ayodhya
26 Jun 2021
20 Jan 2021
5 Feb 2021
20 Jan 2021
4 Feb 2021
20 Jan 2021
20 Jan 2021
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, within all lifts and lead up to 30m. as per MORT & H specification no 301
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site DBD95%, spreading, grading to required slope and compacting to meet requirement of table 300-2. For widening of existing embankmentaSPER Calculation Sheet
Construction of Granular Sub-Base by providing Close graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller to achieve the desired density, complete as per technical clause 401
Providing,laying,spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.75 kg/sqm using mechanical means.
Providing and laying Dense graded Bituminous Macadam with hot mix plant producing an average output of 75 ton per hour using crused aggregates of specified grading -II premixed with bituminous binder VG-30 @ 4.5% of mix, transported to site , laid over previously prepared surface with paver finisher to the required grade , lavel and alignment and rolled to achieve the desired compaction. as per MORT&H Specification. No 507
Providing and applying tack coat with bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Below BC
Providing and laying bituminous concrete with hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Earth work in excavation in trenches for foundations pipes cable etc in ordinary soil (Loan clay or sand) including lift up to 1.5 m. lead up to 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer i/c within a lead of 50m. (S.I. No.251 )
Providing and laying in cement concrete 4:2:1 of not less than strength of M 150 [stone ballast 4 (40 mm. normal size) : 2 approved coarse sand : 1 cement] and curing complete, including cost of formwork in foundation and floors. (S.I. No.279a )
Class-150 brick work in 1:3 cement and coarse sand of 2.8 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc, required for proper completion of the work (S.I. No.307 ) in foundation
R.C.C works with cement approved coarse sand and 2 cm (3/4”) gauge approved stone ballast in the proportion 1:11/2:3 (1 cement : 4.5 aggregate) in lintels of doors and windows excluding supply of reinforcement and its bending the same with 24 B WG binding wire and necessary centring and shuttering etc, and also including supply of all materials labours and tools and plants etc required for proper completion of works. (S.I. No.284b )
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work(when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorized overlapping shall be measured up to floor two level. (Over all Rate) (S.I. No.504 )
M/s PSP Construction
KUMAR TRADERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .