Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical NO 1 4 56 Y SRI BHARATHI NAGAR OPP PARVATHI THEATER CUMBUM ROAD THENKARAI PERIYAKULAM THENI DT 625 601 | PERIYAKULAM | THENI | TAMIL NADU | 625601 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical NO 15B 17C PANAGAL 2ND ST MATHICHIYAM MADURAI 20 | MADURAI | MADURAI | TAMIL NADU | 20 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
20 Nov 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE TP SO Madurai
Office of the Chief Engineer TP SO K.pudur Madurai
Labour charges for erection of equipments supply of MS materials for Establishment of 110/11 KV SS with 1X10MVA Power Transformer at Kulesekaram in Kanyakumari EDC
2026_EB_722344_1
CE/TP SO/MDU Specn.No.021/2026-27
Open Tender
Electrical Works
Works
180 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.3 L
Yes
21 Nov 2026
5 Nov 2026
21 Nov 2026
5 Nov 2026
20 Nov 2026
5 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavating, depositing on bank with an initial lead of 10m and lift of 2m in Hard stiff clay, Stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed small size boulders SS.20B. | 130 | m3 | - | - |
| - | Earthwork excavating, depositing on bank with an initial lead of 10m and lift of 2m in Softy disintegrated rock,laterite soft rock or kankar not requiring blasting. | 56 | m3 | - | - |
| 3 | PCC 1:3:6 using 40mm size machine crushed HBG metal without form work including cost materials,labours, lead,lift ,curing,etc., complete (As per Data A&B- To be done by contractor) | 186.3 | m3 | - | - |
| 4 | PCC 1:2:4 using 12 to 20 mm size machine HBG metal with form work including cost materials,labours, lead,lift ,curing,etc., complete | 80.2 | m3 | - | - |
| - | Brick Work with CM 1:5 using second class brick 9"*43/8"*23/4" including cost of all materials labour lead lift etccuring etc., complete | 3.4 | m3 | - | - |
| 6 | Plastering with CM 1:5, 12mm thick including cost of all materials, lead, lift, curing etc., complete | 390 | m2 | - | - |
| 7 | Colour washing with two coats of approved cement paint over one coat of white cement including cost of materials labour lead lift etc complete | 390 | m2 | - | - |
| - | Labour, machinery, Consumables for the Fabrication for steel structuresHeavy section (14 kg/m and above) | 21.68 | MT | - | - |
| 9 | Labour, machinery, Consumables for the Fabrication for steel structuresLight section (below 14 kg/m) | 17.6 | MT | - | - |
| 10 | Labour for the Erection of the Fabricated Steel StructuresHeavy section (14 kg/m and above) | 21.68 | MT | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_867370.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .