Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAccepted-AOC CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹12.0 L+₹1.8 L (18.2%)Rejected-Finance | L2 | Rejected-Finance Rejected by Tender Committee due to L2 Bidder | |
| 3 | L3₹16.5 L+₹6.3 L (62.3%)Rejected-Finance BIRSINGHPUR PALI WARD NO 13 DISTRICT UMARIA MADHYA PRADESH 484551 | UMARIA | MADHYA PRADESH | 484551 | L3 | Rejected-Finance Rejected by Tender Committee due to L3 Bidder |
Tender Value
₹20.9 L
EMD Value
₹26,200
Closing Date
27 Oct 2022, 5:00 pmClosed
Area Survey Officer Johilla Area SECL Nowrozabad
Area Survey Dept GM Office Johilla Area Nowrozabad Dist Umaria MP Pin 484555
Roof bolting in UG by hiring of DGMS approved portable hydraulic roof bolting machine with wet drilling arrangement to drill 1.50 mtr/ 1.80 mtr. long hole in roof with 27mm dia drill bit for anchoring 20/22mm dia roof bolts with resin capsules and f
2022_SECL_259139_1
SECL/GM/JOH/Survey/ eTender/22-23/16 dt-13/10/2022
Open Tender
Civil Works - Others
Item Rate
270 days
Pali Colliery
3 documents required · 3 mandatory
₹26,200
26 Nov 2022
14 Oct 2022
29 Oct 2022
14 Oct 2022
27 Oct 2022
14 Oct 2022
14 Oct 2022 - 21 Oct 2022
Amount
Item Description/ Heading
Roof bolting in UG by hiring of DGMS approved portable hydraulic roof bolting machine with wet drilling arrangement to drill 1.50 mtr/ 1.80 mtr. long hole in roof with 27mm dia drill bit for anchoring 20/22mm dia roof bolts with resin capsules and fitting of bearing plates and w-strap (as and when required) and tightening of nuts in development panel at Pali Colliery (Note- Hydraulic roof bolting machine with hydraulic oil & wet drilling arrangement, drill rod, drill bit and spray pump to be provided by contractor) Note- (1) The Transportation of material (i.e Roof Bolt Rod, Bearing Plate, Nuts & Resin Capsules) from surface to work place shall be done by contractor. (2) Electrical power and water at one convenient point for drilling machine will be arranged by Management. (3) Cable/ Water hoses from power pack to drill machine and starter shall be supplied by contractor (4) Shifting of Power pack & drill machine shall be done by the Contractor. (5) All maintenance and related shifting will be done by contractor. (6) Such arrangement shall be made that the roof bolt grouted/ Jammed by the contractor and the Company (SECL) are distinguishable.
Total impact of GST for the purpose of CTC
S.V. KURUP
Shri Bhupendra Singh
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_267975.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .