Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹39.8 LAccepted-AOC AT CHADANGIPUR PO HADUBHANGI VIA KASHINAGAR GAJAPATI PIN 761208 | GAJAPATI | ODISHA | 761208 | ₹39.8 L | 1 | Accepted-AOC L1 LOTTARY WINER BIDDER WORK AWARDED TO MASABATULA BHARAT |
| 2 | 1₹39.8 LRejected-Finance AT BALIPADA DIST PURI PIN 752105 | BALIPADA | PURI | ODISHA | 752105 | ₹39.8 L | 1 | Rejected-Finance L1 unsuccessful SC bidder |
| 3 | Rejected-Technical WARD NO 29 PO SAHID NAGAR DIST KHURDHA ODISHA PIN 751022 | SAHID NAGAR | KHURDHA | ODISHA | 751022 | - | - | Rejected-Technical L4 bidder unsuccessful bidder |
| 4 | Rejected-Technical AT PO MADHUSUDHANPUR PS GURANDI PIN 761211 | MADHUSUDHANPUR | GAJAPATI | ODISHA | 761211 | - | - | Rejected-Technical L3 bidder unsuccessful bidder |
Tender Value
₹49.1 L
EMD Value
₹49,105
Closing Date
15 Jan 2026, 5:30 pmClosed
Project Administrator, ITDA, Paralakhemundi
Project Administrator, ITDA, Paralakhemundi
Construction of Staff Qtr at Badakalakote High School under Gumma Block
2025_STSCD_123995_13
ITDAPKD/05/2025-26
Open Tender
Civil Works - Buildings
180 days
Badakalakote
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹49,105
Yes
20 Apr 2026
6 Jan 2026
17 Jan 2026
6 Jan 2026
15 Jan 2026
6 Jan 2026
Earth work in all kind of Soil and gravels mixed with stone and boulder not exceeding 0.014 cum. In volume within 50 m. initial lead and1.5 m. initial lift including rough dressing and breaking clods to maximum 5 cm to 7cm and laying in layer not exceeding 0.3 m.in depth and as per specification approved by the department including all costs of labour,sundries, tools & plants required for the work etc. complete as per direction of Engineer-in-Charge.
Filling in foundation and Plinth with sand well watered and rammed & dressed & level to proper gradient including all cost, conveyance, royality taxes of all materials, labour, T & P required for the work etc. complete and as per direction of Engineer in Charge.
Cement concrete (1:3:6) with 4 cm. size crusher broken hard granite metals of approved quality including mixing with concrete mixture, lowering & laying in layers not exceeding 300 mm. in depth, ramming compacting to proper thickness, watering, curing for required period including all cost, conveyance, royality, taxes of all materials etc. complete as per the direction of Engineer-in-Charge.
Fly Ash Brick Masonry in cement mortar of mix (1:6) using Fly Ash bricks of size 23cm x 11 cm x 8 cm in foundation & Plinth having crushing strength not less than 75 kg per square c.m, with cement and screened & washed sharp sand for mortar after immersing the bricks for 6 (Six) hours in water before use in works with all necessary projections, splays cuffing, circular moulding, corbelling, chamfering, watering and curing etc. including cost, coveyance.stacking. loading, uriloading, royalties, all taxes cost of all labour Labour cess scaffolding, sundries and T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. Ground Floor
Fly Ash Brick Masonry in cement mortar of mix (1:6) using Fly Ash bricks of size 23cm x 11 cm x 8 cm in Superstructure having crushing strength not less than 75 kg per square c.m, with cement and screened & washed sharp sand for mortar after immersing the bricks for 6 (Six) hours in water before use in works with all necessary projections, splays cuffing, circular moulding, corbelling, chamfering, watering and curing etc. including cost, coveyance.stacking. loading, uriloading, royalties, all taxes cost of all labour Labour cess scaffolding, sundries and T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. GroundFloor
First Floor
Providing and laying in position ready mixed M20 grade concrete having compressive strength at 28 days test not lessthan 250kg/sq.cm for reinforced cement concrete work using cement content as per approved design mix etc including Rigid & smooth centering and shuttering. Coloumn footing
RCC Plinth /Grade Beam
RCC Coloumn
RCC Roof Beam
RCC Lintel
RCC Chajja
RCC Stair Case
RCC Roof Slab
RCC Coloumn First Floor
RCC Beam First Floor
RCC Lintel First Floor
RCC Chajja First Floor
RCC Roof Slab First Floor
Supplying HYSD/Tor steel reinforcement from SAIL,VIZAG STEEL OR TATA STEEL brand of required diameter of approved quality including Labour charges for cutting, bending, binding and tying the grills and placing in position including cost, conveyance & taxes of reinforcements confirming to ISI standard and binding wire 18 to 20 gauge and as per drawing, design etc. complete as per the direction of Engineer-in-Charge. Ground Floor
First Floor
12 mm thick cement plaster (1:6) over brick work including racking out joints finishing smooth with proper plumb and line watering curing for seven days with cost, conveyance, royality taxes of all materials, labour, T & P required for the work etc. Complete as per the direction of Engineer-in-Charge. Ground Floor
First Floor
16 mm thick cement plaster (1:6) over brick work including racking out joints finishing smooth with proper plumb and line watering curing for seven days with cost, conveyance, royality taxes of all materials, labour, T & P required for the work etc. Complete as per the direction of Engineer-in-Charge. Ground Floor
First Floor
6 mm thick Cement Plaster with cement mortar (1:4) over RCC surface including deep chiping & including all cost, conveyance, taxes, royalities etc. complete as directed by the Engineer-in-charge.
First Floor
2.5cm thick grading concrete (1:2:2) on roof slab with hard black broken granite stone chips of approved size and quality from approved quarry with chicken mass including cost and conveyance taxes and royalties of all material with all labour and T&P etc compt and as per specification and direction of Engineer -in –charge. First Floor
Providing and fixing Ceramic tiles in floors treads or steps and landing on 25 mm thick bed of CM(1:1) [1 cment: 1 sand] jointed with neat cement slurry mixed with pigment to match the shade of tile including rubbing and polishing complete including cost of all and completefinished in all respect. Ground Floor
First Floor
Providing and fixing Ceramic tiles in dado skirting and risers of steps on 12 mm thick C.P (1:3) including cost of all and complete finished.
First Floor
1" thick A.S flooring in Cement Concrete.(1:2:4)using 12mm size hard granite cursher broken chips including punning,curing and cost ,conveyance,royality and other taxes of all materials etc complete as direceted by the Engineer in charge.
First Floor
Finishing wall surface with wall putty (water base) of appvd quality and make and finished smooth even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour with T&P etc complete in all respect.
First Floor
Finishing plastered surfaces of walls with wall primer and making smooth to receive painting including cost of all and complate. Ground Floor
First Floor
Finishing walls with weather coat of approved shade on new work two coats to give an even shade including cost of all and complete. Ground Floor
First Floor
Finishing walls with Plastic Emulsion paint of approved shade on new work two coats over a coat of primer to give an even shade including cost of all and complete. Ground Floor
First Floor
Supplying and fitting fixing of Un-Plasticised Poly Vinyl Chloride (UPVC) Three track Three panel Sliding Window including cost of all and completeas per the directon of the Engineer-in-Charge. Ground Floor
First Floor
Supplying 5mm thick Black glass of approved quality and make to the work site including cost of material with transportation and all taxes Ground Floor
First Floor
Supplying, fitting and fixing M.S. Grill /Doors/Windows out of M.S. flat confirming to IS-1977/1996 as per the design approved. @35kg/sqm etc including cost,conveyance of all materials,priming,and labour for fitting fixing etc.complete as per the instruction of Engineer-in-Charge. Ground Floor
First Floor
Supplying, fitting and fixing M.S. Grill Gate /Doors/Windows out of M.S. flat confirming to IS-1977/1996 as per the design approved. @35kg/sqm etc including cost,conveyance of all materials,priming and labour for fitting fixing etc.complete as per the instruction of Engineer-in-Charge. Ground Floor
First Floor
Painting Two coats with synthetic Enamil paint over a coat of primer to Iron work including cost, conveyance and taxes of all materials and labour with T&P etc.complete as per directions of E.I.C. Ground Floor
First Floor
Providing fixing and fitting of 100mm dia P.V.C. rain water pipe of approved quality and approved make confirming to I S with necessary bends and clamps etc.complete fixed to wall Ground Floor
Supplying, fitting, fixing of stainless steel of 304 grade in hand railing using 50mm dia. Of 2mm thick circular pipe with balustrade of size 32mmx32mmx2mm @ 0.90m c/c and stainless square pipe braceng of size 32mmx32mmx2mm in 3 rows in stair case as per approved design and specification, buffing,polishing etc. with cost conveyance taxes of all materials, labour, T&P required for completion of the work in all reapect as per the direction of the Engineer-in-charge. Ground Floor
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_573880.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_573880.xls
BOQ • 0.33 MB
DTCN5forTender.pdf
Tender Documents • 2.71 MB
Download all tender documents and submit your bid