Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.6 L+₹32,137.90 (3.12%)Rejected-AOC NA | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
7 Nov 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E.E. DEOKALI PUMP CANAL DIVISION-iI, GZP
OFFICE E.E. DEOKALI PUMP CANAL DIVISION-iI, GZP
GHAZIPUR RAJWAHA KE KM 3.150 PAR STHIT V.R.B. KE SLAB AND PARAPET KE PURNSTHAPNA FOUNDATION PROTECTION KA KARY
2022_UPIDC_743214_2
1022 dt. 20.10.2022
Open Tender
Civil Works
Item Rate
30 days
GHAZIPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹266
₹20,000
20 Dec 2022
2 Nov 2022
8 Nov 2022
2 Nov 2022
7 Nov 2022
2 Nov 2022
Amount
Earth work for making diversion in all types of soil including all lead-lift labourers and T&P etc required for proper completion of work.
Dismantling brick work with cement mortar including stacking of dismantled materials in the downstream of bridge or proper disposal as per site incharge direction
Dismantling reinforced cement concrete including stacking of dismantled materials in the downstream of bridge or proper disposal as per site incharge direction
E/W in excavation in foundation with all lead lift and all types of soil for wet earth including all cost of labour and T&P etc.
Providing & laying C.C. 1:3:6 in foundation with cement stone ballast size 20 to 40mm and coarse sand F.M. not less than 2 with all lead-lift including cost of all materials labourers T&P etc required for proper completion of work.
Centering and shuttering for R.C.C. work for span upto 3.0m to 5.0m span with all lead-lift including, cost of all material labourers T&P etc. required for proper completion of work.
Supplying cutting bending binding and placing in position mild steel reinforcement as per drawing provided with all lead lift including cost of all materials labourers T&P etc required for proper completion of work.
R.C.C. in 1:1.5:3 with cement dalla grit size 10 to 20 mm and coarse sand F.M. not less than 2 with all lead-lft including cost of all materials labourers T&P etc required for proper completion of work.
First class brick work in cement mortar 1:4 with coarse sand F.M. not less than 2 with all lead lift including cost of all materials labourers T&P etc required for proper completion of work.
wearing coat in 1:2:4 with cement dalla grit 4.75 to 10mm & coarse sand F.M. not less than 2 with all lead- lift including cost of all materials labourers T&P etc required for proper completion of work.
Cement pointing in cement mortar 1:2 with cement coarse sand F.M. not less than 2 with all lead-lift including cost of all materials labourers T&P etc required for proper completion of work.
First class brick on edge soling work in cement mortar 1:4 with coarse sand FM not less than 2 with all lead-lift including cost of all materials labourers T&P etc. required for proper completion of work.
Supplying and fixing of wheelguard in right position as per direction of site incharge.
M/S SAGUN ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .