Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.0 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹91.1 L+₹1.1 L (1.26%)Rejected-Finance | L2 | Rejected-Finance Highest rate |
Tender Value
₹90.1 L
EMD Value
₹93,000
Closing Date
15 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director, DRDA, Virudhunagar
DRDA, Collectorate Complex, Virudhunagar
Rejuvenation and improvements to Tanks and Deepening and Improvements to the Ooranies - 9 nos. in AGAMT-II-2021-22 Village panchayats of Kariapatti Block in Virudhunagar District in Package no.KPT-1.
2022_RDTN_237316_17
C9/5832/2021 dated 18.06.2022
Open Tender
Civil Works
Works
180 days
Kariapatti Block
Two Cover System. Refer tender document.
5 documents required · 5 mandatory
₹0
₹93,000
DRDA, Collectorate Complex, Virudhunagar
16 Sept 2022
25 Jun 2022
15 Jul 2022
25 Jun 2022
15 Jul 2022
6 Jul 2022
6 Jul 2022
90 days
Amount
Part-1:- Rejuvenation of Pullur Kanmai desilting, reconstruction of sluice and revertment ( 57 m ) in Pullur village and D.Kadamankulam Panchayat
Clearing the juliflora jungle without uprooting
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete. (including Watering & Consolidation)
Construction Of Sluice
Dismantling the existing Brick/Stone masonry walls in cement mortar under 3m height and cleaned away from the site including cost of all labour charges etc., complete.(Ref.:- PWD Schedule of Rates 2019-20, Annex III- Rates of works -Sl no 15 and Schedule Item no 14 (Page-22))
Dismantling the existing PCC and cleaned away from the site including cost of all labour charges etc., complete.(Ref.:- PWD Schedule of Rates 2018-19, Annex III- Rates of works -Sl no 34 and Schedule Item no 37 (Page-24))
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for Cut Open the Bund etc., complete.
Earth work Upto 0.30m depth
Earth work from 0.30m to 0.60m depth
Earth work above 0.60m depth
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for Foundation etc., complete.
Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications etc., complete.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete.
Centering (Below Sill Level)
Deck Slab Centering
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc., complete
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges etc., complete.
Filling with Excavated earth including cost and conveyance and all labour charges such as watering and ramming etc., complete as per standard specification.
Construction Of Revetment
Earth work excavation and depositing on bank with on intial lead of 10m and on initial lift of 2m in hard stiff clay, stiff black cotton soil and Hard gravelly soil as per Rural schedule of Rates for Ordinary soil II SS 20 A
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and including cost and conveyance pf all materials to site and all labour charges etc complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and including cost and conveyance pf all materials to site and all labour charges etc complete.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Name Board
Part-2:- Deepening of Ayyanar Kovil Oorani with bathing ghat,Retaining Wall (117m) and revertment (86 m) @ Manthirioodai Village and Kambikudi Panchayat
Clearing the juliflora jungle without uprooting
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete. (including Watering & Consolidation)
Construction Of Revetment
Earth work excavation and depositing on bank with on intial lead of 10m and on initial lift of 2m in hard stiff clay, stiff black cotton soil and Hard gravelly soil as per Rural schedule of Rates for Ordinary soil II SS 20 A
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and including cost and conveyance pf all materials to site and all labour charges etc complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and including cost and conveyance pf all materials to site and all labour charges etc complete.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc complete
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete.
Provision for Name Board
Part-3:- Deepening of Chithan oorani with Bathing ghat,Retaining Wall (96m) and Revement ( 87 m) @ Kilavaneri Panchayat
Clearing the juliflora jungle without uprooting
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete. (including Watering & Consolidation)
Construction Of Bathing Ghat & Revetment
Earth work excavation and depositing on bank with on intial lead of 10m and on initial lift of 2m in hard stiff clay, stiff black cotton soil and Hard gravelly soil as per Rural schedule of Rates for Ordinary soil II SS 20 A
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and including cost and conveyance pf all materials to site and all labour charges etc complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and including cost and conveyance pf all materials to site and all labour charges etc complete.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc complete
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete.
Provision for Name Board
Part-4:- Deepening of Shamba oorani with Bathing ghat and Revetment ( 60 m) @ Kilavaneri Panchayat
Clearing the juliflora jungle without uprooting
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete. (including Watering & Consolidation)
Construction Of Bathing Ghat & Revetment
Earth work excavation and depositing on bank with on intial lead of 10m and on initial lift of 2m in hard stiff clay, stiff black cotton soil and Hard gravelly soil as per Rural schedule of Rates for Ordinary soil II SS 20 A
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and including cost and conveyance pf all materials to site and all labour charges etc complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and including cost and conveyance pf all materials to site and all labour charges etc complete.
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc complete
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete.
Provision for Name Board
Part-5:- Rejuvenation of thulukkankulam kanmoi with reconstruction of sluice and revetment ( 30 m) at Mangulam Village & panchayat
Clearing the juliflora jungle without uprooting
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete. (including Watering & Consolidation)
Construction Of Sluice
Dismantling the existing Brick/Stone masonry walls in cement mortar under 3m height and cleaned away from the site including cost of all labour charges etc., complete.(Ref.:- PWD Schedule of Rates 2019-20, Annex III- Rates of works -Sl no 15 and Schedule Item no 14 (Page-22))
Dismantling the existing PCC and cleaned away from the site including cost of all labour charges etc., complete.(Ref.:- PWD Schedule of Rates 2018-19, Annex III- Rates of works -Sl no 34 and Schedule Item no 37 (Page-24))
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for Cut Open the Bund etc., complete.
Earth work Upto 0.30m depth
Earth work from 0.30m to 0.60m depth
Earth work above 0.60m depth
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for Foundation etc., complete.
Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications etc., complete.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete.
Centering (Below Sill Level)
Deck Slab Centering
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc., complete
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges etc., complete.
Filling with Excavated earth including cost and conveyance and all labour charges such as watering and ramming etc., complete as per standard specification.
Construction Of Revetment
Earth work excavation and depositing on bank with on intial lead of 10m and on initial lift of 2m in hard stiff clay, stiff black cotton soil and Hard gravelly soil as per Rural schedule of Rates for Ordinary soil II SS 20 A
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and including cost and conveyance pf all materials to site and all labour charges etc complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and including cost and conveyance pf all materials to site and all labour charges etc complete.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Name Board
Part-6:- Deepening of Amman Kovil Oorani with Bathing ghat,Strain Wall (112) and revertment (136 m) @ Mudukkankulam Village and Panchayat
Clearing the juliflora jungle without uprooting
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete. (including Watering & Consolidation)
Construction Of Bathing Ghat & Revetment
Earth work excavation and depositing on bank with on intial lead of 10m and on initial lift of 2m in hard stiff clay, stiff black cotton soil and Hard gravelly soil as per Rural schedule of Rates for Ordinary soil II SS 20 A
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and including cost and conveyance pf all materials to site and all labour charges etc complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and including cost and conveyance pf all materials to site and all labour charges etc complete.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc complete
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete.
Provision for Name Board
Part-7:- Rejuvenation of Thenoor Periya Kanmai with sluice repair and revertment (107m )@ Thenoor Village and Sooranur Panchayat
Clearing the juliflora jungle without uprooting
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete. (including Watering & Consolidation)
Construction Of Revetment
Earth work excavation and depositing on bank with on intial lead of 10m and on initial lift of 2m in hard stiff clay, stiff black cotton soil and Hard gravelly soil as per Rural schedule of Rates for Ordinary soil II SS 20 A
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and including cost and conveyance pf all materials to site and all labour charges etc complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and including cost and conveyance pf all materials to site and all labour charges etc complete.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Name Board
Part-8:- Deepening of oorani Near Panchayat Office with bathing ghat,Straining Wall (69m) and revertment ( 15 m) @ Valukkalotti Village and Panchayat
Clearing the juliflora jungle without uprooting
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete. (including Watering & Consolidation)
Construction Of Bathing Ghat & Revetment
Earth work excavation and depositing on bank with on intial lead of 10m and on initial lift of 2m in hard stiff clay, stiff black cotton soil and Hard gravelly soil as per Rural schedule of Rates for Ordinary soil II SS 20 A
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and including cost and conveyance pf all materials to site and all labour charges etc complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and including cost and conveyance pf all materials to site and all labour charges etc complete.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc complete
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete.
Provision for Name Board
Part-9:- Deepening of Devasthanam oorani with revertment ( 98 m ) @ Valukkalotti Village and Panchayat
Clearing the juliflora jungle without uprooting
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete. (including Watering & Consolidation)
Construction Of Revetment
Earth work excavation and depositing on bank with on intial lead of 10m and on initial lift of 2m in hard stiff clay, stiff black cotton soil and Hard gravelly soil as per Rural schedule of Rates for Ordinary soil II SS 20 A
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and including cost and conveyance pf all materials to site and all labour charges etc complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and including cost and conveyance pf all materials to site and all labour charges etc complete.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Name Board
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
MANO CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .