Tender Value
₹70.3 L
EMD Value
₹70,400
Closing Date
6 May 2026, 4:30 pmClosed
Chief Engineer (R&B), State roads
DRDA office, 1st floor, Khammam
FDR to Mangalagudem to Gundalathanda road including 1V of 6M Slab culvert from 0/4-1/0 including in Khammam District
697255
Engineer-In-Chief (R&B), SR& MD-TGRDC, Hyderabad e-NIT NO.2/KMM- 2/E-in-C (SR)/ SE(D&P)/EE-SR/ DEE-III/AEE/2026, Dt.21.04.2026
OPEN
Civil Works
KHAMMAM
11 documents required · 10 mandatory · 1 optional
₹2,490
₹70,400
30 Apr 2026
30 Apr 2026
30 Apr 2026
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete including _ charges for finished item of work as per MoRT&H specification 304 (5th Revision) and as directed by the Engineer-in-Charge. (Bridge )
PCC (1:3:6) nominal mix in foundation with crushed stoneaggregate 40mm nominal size mechanically mixed, Placed in foundation and compacted by vibration including curing complete as per MORT&H spn.no.2100 Under Abutments, Piers & wing walls.
Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,and conveyance of all materials to site and all labour charges, centering, machine mixing, laying in position, Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for footings of Abutments & wing walls.
Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, and conveyance of all materials to site and all labour charges, centering, machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for Sub structure for Abutments and wing walls (Up to 5Mts Height)
Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, seignorage conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th Revision ) and as directed by the Engineer-in-Charge for RAFT foundation
Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, seignorage conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th Revision ) and as directed by the Engineer-in-Charge for Abutment Bed blocks & Backing walls, (Sub Structure) (5m to 10 Mtrs Height)
Providing and placing reinforced cement concrete in Super Structure of VRCC M30 grade as per drawing and Technical Specification and MoRT&H Specification No.1500, 1600, 1700, 1900 & 2300 excluding cost of steel & its fabrication charges including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed by the Engineer-in-Charge . As per MOST Drg.No:SD/114
Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, _ and conveyance of all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for Levelling course below approach slab.
Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, _ conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing, excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2704 (5th Revision) and as directed by the Engineer-in-Charge for Approach slab.
Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, _ conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per M.O.T.drawing SD/205 but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2702 (5th Revision) and as directed by the Engineer-in-Charge for wearing coat over Deck slab.
Vibrated reinforced cement concrete M 40 grade using 20mm & 10mm hard broken graded granite crushed metal (SS-5) including cost, _ conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P and all water leads etc., complete as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 809,1500,1600,1700 & 2200 (5th revision) and as directed by the Engineer-in-Charge for Crash barrier, excluding Reinforcement.
Providing HYSD bars Fe-500 from primary producers like TATA,SAIL,VSP,J.S.W of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items. (Bridge )
Providing HYSD bars Fe-500 from primary producers like TATA,SAIL,VSP,J.S.W of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items. (Bridge )
Providing HYSD bars Fe-500 from primary producers like TATA,SAIL,VSP,J.S.W of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for foundations of R.C.C items. (Bridge )
Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC (1:4:8) including cost and conveyance of materials to site and including labour charges for packing the stones for revetment etc., but excluding labour charges complete for finished item of work as per MoRT&H specification 2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for quadrential revetment. (Bridge )
Pitching with 300 mm size rough stone including cost, _ charges and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 (5th revision) and as directed by the Engineer-in-Charge for toe walls.
Providing and laying filter material with Gravel underneath pitching in slopes including cost, _ charges and conveyance of materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment.
Back filling behind Abutments with gravel including cost ,conveyance and _ of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for finished item of work.
Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBT metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal ,and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.
Providing weep holes in VCC Abutments, Return walls and wing walls with 100mm Diameter AC pipe extending through the full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., complete for finished item of work for weep holes as per MoRT&H specification 2706 & 2200 (5th Revision)
Supplying and fixing of GI drainage spouts complete as per MoRT&H Specification No.2705
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Boulders laid dry without wire crates.
Forming embankment with borrowed useful earth from outside road boundary by mechanical means upto SDR with extra lead of 5 Km including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H and CBR not less than 10%, including all hire and operational charges of T&P , complete for finished item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on level for finished item of work) (Bridge approaches)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BID MG (1).doc
TENDER_DOCUMENT • 0.91 MB
M-G BOQ (1).xlsx
TENDER_DOCUMENT • 0.01 MB
Download all tender documents and submit your bid