Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.8 LAccepted-AOC A 29 SAMRAT PALACE GARH ROAD MEERUT UP 250001 | MEERUT | UTTAR PRADESH | 250001 | L1 | Accepted-AOC Being L1 accepted | |
| 2 | L2₹32.1 L+₹2.5 L (8.61%)Rejected-Finance | L2 | Rejected-Finance Rejected due to not being L1 | |
| 3 | L3₹32.2 L+₹2.6 L (8.91%)Rejected-Finance 474 27 NORTH CIVIL LINE 5 SAKET COLONY MUZAFFARNAGAR UP 251 001 | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | L3 | Rejected-Finance Rejected due to not being L1 | |
| 4 | L4₹32.2 L+₹2.7 L (9.22%)Rejected-Finance NOT SPECIFIED | L4 | Rejected-Finance Rejected due to not being L1 | |
| 5 | L5₹32.6 L+₹3.1 L (10.5%)Rejected-Finance | L5 | Rejected-Finance Rejected due to not being L1 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
22 Jun 2024, 6:00 pmClosed
Garrison Engineer (South) Meerut Cantt
Garrison Engineer (South) Meerut Cantt The Mall Road Meerut Cantt Distt Meerut-250001(UP)
REPAIR AND PAINTING TO VARIOUS STEEL FURNITURE/ ARTICLES UNDER BSO OF GE (SOUTH) MEERUT CANTT
2024_MES_655747_1
GE/MRT/S/8143/2024-2025
Open Tender
Civil Works
Item Rate
270 days
Meerut Cantt
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
GE (South) Meerut
₹90,000
Yes
9 Oct 2024
24 May 2024
29 Jun 2024
24 May 2024
22 Jun 2024
8 Jun 2024
25 May 2024 - 31 May 2024
Amount
(ALMIRAH STEEL MEDIUM & LARGE WITH SHELVES, 1/2 H 1/2 S, LOCKER STEEL) Material & Labour for cleaning of complete surfaces of Almirah Large Steel 1/2 H 1/2 S (inner & outer side) complete by any means including removing of dirt, broken parts / Dents/ joints welded with gas welding and spraying one coat of synthetic enamel paint olive green or one coat of hammer toned paint synthetic enamel sliver grey after a coat of primer complete all as specified and directed.
All as per item No 1.00 here-in-before but almirah large steel with shelves inner & Outer side complete .
All as per item No 1.00 here-in-before but almirah medium steel with shelves inner & outer side complete.
All as per item No 1.00 here-in-before but almirah medium steel 1/2 H 1/2 S inner & outer side complete.
All as per item No 1.00 here-in-before but locker steel inner & outer side complete.
Taking down existing unserviceable MS clips with screw/nuts and bolts of almirah steel with shelves / Half H & Half S large (Drg No FD-1031) refixing/reweldling with new items, MS clips with screws/nuts & bolts complete all as specified and directed.
All as per item No 6.00 here-in-before but locks (6 levers ) of Make link / Godrej / Harrison or standard aproved by GE. complete all as specified and directed.
All as per item No 6.00 here-in-before but CP handle with bolt complete all as specified and directed.
All as per item No 6.00 here-in-before but mild steel locking rod with plate complete all as specified and directed.
All as per item No 6.00 here-in-before but locking box / device complete all as specified and directed.
Taking down existing unserviceable MS clips with screw/nuts and bolts of almirah steel with shelves/Half S & Half H medium (Drg No FD-1032) refixing/reweldling with new items, MS clips with screws/nuts & bolts complete all as specified and directed.
All as per item No 11.00 here-in-before but locks (6 levers) of Make Link / Godrej / Harrison or standard approved by GE. complete all as specified and directed.
All as per item No 11.00 here-in-before but CP handle with bolt complete all as specified and directed.
All as per item No 11.00 here-in-before but mild steel locking rod with plate complete all as specified and directed.
All as per item No 11.00 here-in-before but locking box / device complete all as specified and directed.
Removing of unserviceable and worn out legs and providing new legs made out of 20 gauge MS sheet fabricated to shape as per existing almirah steel with shelves/Half S & Half H Large complete all as specified and directed.
All as per item No 16.00 here-in-before but almirah steel with shelves/Half H & Half S medium complete all as specified and directed.
Removing of unserviceable shelves and providing new shelves made out of MS sheet 1.00mm thick with fixing brackets of existing type almirah large steel complete all as specified and directed.
All as per item No 18.00 here-in-before but almirah medium steel complete all as specified and directed.
Material and labour for removing unserviceable shutter and providing new shutter using MS sheet 1.00mm thick as per existing shape Almirah large steel. (Drg No FD-1031) complete all as specified and directed.
All as per item No 20.00 here-in-before but almirah medium steel. (Drg No FD-1032). complete all as specified and directed.
LOCKER STEEL (FD-1029) : Taking down existing unserviceable hasp and staple from locker steel. Supply and fix in replacement hasp and staple Aluminium of best quality size 75x40x3mm to shutter as shown on drg complete all as specified and directed.
All as per item No 22.00 here-in-before but supply and fix in replacement MS butt hinges as per existing size complete all as specified and directed.
Supply and fixing CP socket in replacement suitable bracket and stappled socket open at one end as approved complete all as specified and directed.
All as per item No 24.00 here-in-before but Steel handle 100 mm long of best quality complete all as specified and directed.
All as per item No 24.00 here-in-before but hanging rod conduit pipe stainless steel 20mm bore 1.6 mm thick complete all as specified and directed. Length of conduit shall be as per drg.
Material and labour for removing unserviceable shutter and providing new shutter using MS sheet 1.00mm thick as per existing shape of locker steel complete all as specified and directed.
Removing of unserviceable and worn out legs and providing new legs made out of 1.00mm thick MS sheet fabricated to shape as per existing locker steel complete all as specified and directed.
Removing of unserviceable shelves and providing new shelves made out of MS sheet 1.00mm thick with fixing brackets of existing type locker steel complete all as specified and directed.
CHAIR STEEL TABULAR WITH/WITHOUT ARMS AND CHAIR CB CUSHIONED (Drg No FD-75 (M)/TP ) Painting to chair steel tabular with arms with one coat of olive green synthetic enamel paint and all as specified after repair with required welding in succeeding items.
All as per item No 30.00 here-in-before but Chair CB Steel without arms .
Repair to chair steel tabular with or without arms with gas welding at worn out places & making good duly painting complete.
Removing the unserviceable handle and providing new handle with fixing nut and bolts of existing type as required duly black painting complete.
Supply and fix of seat & back of IInd class H/W frame duly black painting, canning with 2 mm plastic make as approved by GE with half round and 4 mm plastic cane for border all as per drg and as required sizes complete all as specified and directed.( with arms)
All as per item No. 34.00 here-in-before but Chair CB Steel without arms complete all as specified and directed.
Supply and fix of seat & back of IInd class H/W frame duly cushioned with 50 mm thick foam 40 density and covered with rexine all as per drg and as required sizes complete all as specified and directed.
Material and labour for flat iron cleat 25 x 5 mm, 50 mm long fixed to bottom of steel with welding (with or without arms). complete all as specified and directed.
Supply and fix hard rubber shoe for legs and back tube. complete all as specified and directed.
TABLE DINING ORs STEEL (Drg No FD-165(M). Material & Labour for replacing top of Table dining OR and providing new with 17-18 mm plywood covered with aluminum sheet (22 gauge) to top and edge of table top as directed and shown in drg.
Painting of MS members of table dining OR with one coat of black synthetic enamel paint after required broken / joints welding, cleaning & removing of old surfaces complete all as specified and directed.
Table office officers steel (1370x760 x 750mm) (Drg No FD-1003). Material and labour for removing of unserviceable table top and providing 17-18 mm thick BWR plywood duly post formed, colour/shade as approved by GE , including providing of 1 mm thick PVC edging binding of Make-Rehau/ Kinex shall be provided with mechanical fixing at two open end side of top complete all as specified and directed.
Supply and fixing new drawer made out of 1mm thick MS Sheet alongwith PVC recessed handle as approved including taking down old drawer.
Supply and fix in replacement shutter made out of 1.00mm thick MS sheet made to shape as per drg.
Material and labour for removing of unserviceable lock and supplying and fixing new lock 32 to 55mm size with duplicate keys and necessary screws etc (Make - Link / Godrej / Harrison).
Material and labour for carrying out minor repairs like denting & gas welding of broken drawers etc and spray painting with one coats of the green colour synthetic enamel paint to complete (External & enternal ) table etc all complete all as specified and directed.
TABLE OFFICE CLERK STEEL (1320 X 720 X 750 MM) (Drg No FD-1004) All as per item no. 41.00 above but Top of Table Office Clerk Steel.
Supply and fixing new drawer made out of 1mm thick MS Sheet alongwith PVC recessed handle complete all as specified and directed.
Removing of unserviceable lock and supplying and fixing new lock 32 to 55 mm size with duplicate keys and necessary screws etc (Make - Link/Godrej/Harrison)
Carrying out minor repairs like denting & gas welding of broken drawers etc and spray painting with one coats of the green colour synthetic enamel paint to complete (External & enternal ) table etc complete all as specified and directed.
TABLE 3' X 3' STEEL (Drg No FD-1009), All as per item no. 41.00 here-in-before but Top of Table 3 x 3 Steel. complete all as specified and directed.
Carrying out minor repairs like denting & gas welding of broken drawers etc and spray painting with one coats of the green colour synthetic enamel paint to complete (External & internal ) table etc complete all as specified and directed.
(TABLE 3' X 2' WITH/WITHOUT DRAWER STEEL (Drg No FD-1007 & 1008) All as per item no. 41.00 here-in-before but Top of Table 3 x 2 Steel. complete all as specified and directed.
Supply and fixing new drawer made out of 1 mm thick MS Sheet alongwith PVC recessed handlecomplete all as specified and directed.
Carrying out minor repairs like denting & gas welding of broken drawers etc and spray painting with one coats of the green colour synthetic enamel paint to complete (External & enternal ) table etc complete all as specified and directed.
TEAPOY VERANDAH (Drg No-255, 35 (M). All as per item No. 41.00 here-in-before but top of Teapoy Verandah complete all as specified and directed.
All as per item No. 55.00 here-in-before but top of Teapoy Verandah (FD-E6/MAP/17) complete all as specified and directed.
Material and labour for replacement of worn out 10mm dia MS bar wherever required including welding as directed and fixing as shown on Drg complete all as specified and directed.
MIG welding of broken joints MS members For Teapoy Verandah complete all as specified and directed.
Material and labour for carrying out minor repairs like denting & gas welding of broken Frame etc and painting with one coats of the White colour synthetic enamel paint to complete table etc complete all as specified and directed.
Replacement of worn out MS 25 sqmm Pipe 16 Gauge wherever required & Joint through mig welding as directed and fixing as shown on drg complete all as specified and directed.
M&L for Scrapping of existing paint from exposed surfaces or burning out, removing of dents and apply one coat of synthetic enamel paint by spraying of olive-green shade on all (Inner/Outer) steel surfaces complete all as specified and directed for following items:- Table 3'x2' steel without drawer (Drg No FD-1007)
All as per item No 61.00 here-in-before but Table 3' x2' with drawer steel (Drg No FD-1008) complete all as specified and directed.
All as per item No 61.00 here-in-before but stool steel 305x305x510mm(Drg No FD-81M) complete all as specified and directed.
All as per item No. 61.00 here-in-before but teapoy verandah .(FD/E6/MAP/17) complete all as specified and directed.
All as per item No.61.00 here-in-before but rack side steel complete all as specified and directed.
All as per item No 61.00 here-in-before but table bed side steel. complete all as specified and directed.
All as per item No. 61.00 here-in-before but table 900x900x760 Steel .(Drg No FD-1009). complete all as specified and directed.
Charpoy IP Hard Top (FD/E6/MAP-II/01) Supply and fixing of plywood : Top of the Charpoy IP Hard top to be made of plywood commercial 12mm thick 7 ply BWR grade conforming to IS 303-1989 in one piece after taking out the old one and to be fixed with 3 inch long screw nut & bolt in complete all as specified and directed.
Supply and fixing of unserviceable stiffeners 25 x25mm x 16 Gauge MS Tube 900 mm long complete all as specified and directed.
Supply and fixing of 25 x 60 x 6 MS Cleat welded with frame to support Plywood complete all as specified and directed.
Supply and fixing of MS Plate 32 x 32 x5 mm welded at bottom of legs & under which 3 mm th rubber sheet fixed with adhesive complete all as specified and directed.
Material & Labour for cleaning of complete surfaces of Charpoy IP MAP complete by any means including removing of dirt, broken parts / Dents/ joints welded with gas welding and spraying one coat of synthetic enamel paint black colour complete all as specified and directed.
Bed Hard (FD/E6/MAP/08 (R) Supply and fixing of 12 mm BWR Phenol Bonded commercial plywood with Edgeing (unpolished) placed on top of 25 x 25 mm supports complete all as specified and directed.
Supply and fix Head board made of 17-18 mm thick pre laminated MDF Board covered wih PVC edging screwed to MS Strip (Both side decorative finish shade as approved by GE )..
All as per item No 74.00 here-in-before but Foot Board. complete all as specified and directed.
Supply and fixing of unserviceable stiffeners 25 x25mm x 16 Gauge MS Tube 900 mm long complete all as specified and directed.
Supply & fixing of new shoes after removing of unsv shoes for Bed Hard (MAP). complete all as specified and directed.
All as per item No 72.00 here-in-before but Bed Hard MAP. complete all as specified and directed.
Chair Verandah Steel Taking out existing unserviceable PVC from chair verandah PVC and canning with first quality white plastic cane 4mm wide half round for seat and back after carrying out repairs such as denting, gas welding and painting with one coat of synthetic enamel white paint all over the chair complete all as specified and directed. Make: As approved by GE.
Chair Verandah PVC (FD/MAP-II/15) Taking out existing unserviceable PVC seat & back from chair verandah PVC and supply and fix PVC seat and back after carrying out repairs such as denting, gas welding, and painting with one coat of synthetic enamel white paint all over the chair varandah complete all as specified and directed.
Supply & fixing of new shoes after taking out unserviceable shoes retrieved from item ser no. 79.00 & 80.00 here-in-before .
Chair School with Hand Board (FD/E6/MAP/02R) Material and labour for removing of unserviceable Hand Board and supply and fixing new hand board of 17-18 mm pre laminated MDF board making to size, fixing etc. complete all as specified and directed. (Make Centuryply / Greenply / Archidply).
Material and labour for carrying out minor repairs like denting & welding of broken Frame / Bottoms etc and painting with one coats of the black colour synthetic enamel paint complete all as specified and directed.
Supply & Fixing of new PVC Seat of chair school with hand board after removing unsv seat complete all as specified and directed.
Charpoy folding IP with Hard Top (FD-388 All as per item No. 68.00 here-in-before but for ply of charpoy Folding Steel. complete all as specified and directed.
All as per item No. 83.00 here-in-before but for charpoy folding with Hard Top IP. complete all as specified and directed.
Chair Executive revolving (High Back)/ Chair computer Steel adjustable (TP) Material and labour for removing of existing upholstry and proviiding new upholstry complete all as specified and directed.
Supply and fix hydraulic lift as per existing including removing old unserviceable hydraulic lift complete all as specified and directed.
Supply and fix hand rest as per existing including removing old unsv hand rest complete all as specified and directed.
Supply and fix padestal assembly as per existing including removing old padestal assembly complete all as specified and directed.
Supply and fix casters as per existing including removing of old unsv caster complete all as specified and directed.
Shoe Rack Steel (FD/E6/MAP/02(R) Material & Labour for repairing / Joint welding of CR Rod of 3 mm / 6mm / 25. mm pipe points complete all as specified and directed in Shoes Rack Steel MAP.
Supply & Fixing of Rubber Shoes of Shoe Rack Steel all as specified and directed.
Painting : All as per item No. 72.00 here-in-before but for Shoe Rack Steel (MAP)
Sunny Furniture Centre
VARAROHA BUILDERS
M/S AMAR ELEKTRO CENTRE
CHAUDHARY FURNITURE HOUSE
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .