Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAdmitted-Finance | ₹2.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.8 Cr+₹3.4 L (1.22%)Admitted-Finance | ₹2.8 Cr+₹3.4 L (1.22%) | L2 | Admitted-Finance |
| 3 | L3₹2.9 Cr+₹5.4 L (1.94%)Admitted-Finance | ₹2.9 Cr+₹5.4 L (1.94%) | L3 | Admitted-Finance |
| 4 | L4₹2.9 Cr+₹7.8 L (2.81%)Admitted-Finance | ₹2.9 Cr+₹7.8 L (2.81%) | L4 | Admitted-Finance |
| 5 | L5₹3.0 Cr+₹19.7 L (7.04%)Admitted-Finance GROUND FLOOR ABL WORKSPACES CELEBRATION GARDENS NH8 NEXT TO SHIVMURTI MAHIPALPUR SOUTH WEST DELHI DELHI 110037 | NEW DELHI | DELHI | 110037 | ₹3.0 Cr+₹19.7 L (7.04%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Sun Astra Energy Solutions Pvt. Ltd. L3 | Enerture Technologies Pvt Ltd L5 | Mourya Encon Private Limited L1 | sonic engineering and automation L4 | SUNLIVE SOLAR SYSTEM L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00700KWp Grid-Connected Rooftop SPV Power Plants With High Power Evacuation at Gaushala, Raipur Kalan, Chandigarh | ||||||||
| 1.10 | PART-A - Design, Manufacture, Supply, Erection, Testing and Commissioning 700kWpGrid-Connected Rooftop SPV Power Plants With High Power Evacuation Gaushala, Raipur Kalan, Chandigarh | 1 | Nos | 2,20,50,629.1 ₹2,20,50,629.1 Lowest | 2,40,10,000 ₹2,40,10,000 | 2,24,00,000 ₹2,24,00,000 | 2,35,00,000 ₹2,35,00,000 | 2,40,54,545 ₹2,40,54,545 |
| 1.20 | PART-A Design, Supply, Installation, Testing and Commissioning of High Voltage Power evacuation system with Package substation with Dry type of minimum 1000 kVA, 415V/11kV, 50Hz, step up transformer alongwith all protections, switchgears, required vacuum circuit breakers (630 Amps), RMU panel/H-Pole, Metering panel and cables etc. alongwith required civil work as per requirement. | 1 | Nos | 24,50,069.9 ₹24,50,069.9 | 31,50,000 ₹31,50,000 | 28,00,000 ₹28,00,000 | 26,30,000 ₹26,30,000 | 16,72,727 ₹16,72,727 Lowest |
| 2.10 | PART-B Operation & Maintenance for the 700kWp Grid-Connected Rooftop SPV Power Plants With High Power Evacuation on HT Side at Gaushala, Raipur Kalan Chandigarh and the cost of replacement of all the parts covered under Guarantee period of 10 years from the date of commissioning of the Power Plant as per scope mentioned in the DNIT. | 1 | Nos | 36,00,000 ₹36,00,000 | 24,85,000 ₹24,85,000 | 24,50,000 ₹24,50,000 | 23,50,000 ₹23,50,000 Lowest | 24,05,455 ₹24,05,455 |
| 2.20 | PART-B Operation & Maintenance of High Power evacuation System with Package substation of minimum 1000 KVA for10 years from the date of commissioning of the Power Plant | 1 | Nos | 4,00,000 ₹4,00,000 | 2,80,000 ₹2,80,000 | 3,08,000 ₹3,08,000 | 2,63,000 ₹2,63,000 | 1,67,273 ₹1,67,273 Lowest |
Tender Value
₹3.3 Cr
EMD Value
₹6.7 L
Closing Date
16 Dec 2024, 5:00 pmClosed
CEO, CREST
Paryavaran Bhawan 4th Floor Sector 19 B, Madhya Marg Chandigarh
Design Manufacture Supply Erection Testing Commissioning Warranty Operation Maintenance for 10 Years for Total Aggregate Capacity of 700KWp Grid-Connected Rooftop SPV Power Plants High Power Evacuation at Gaushala Raipur Kalan Chandigarh
2024_CHD_83500_1
CREST/SPVPP/2024-25/117
Open Tender
Solar Power Plants
Turn-key
120 days
Chandigarh
Please refer Tender documents.
12 documents required · 12 mandatory
₹1,180
CEO, CREST
₹6.7 L
Office of CEO, CREST
10 Jan 2025
22 Nov 2024
17 Dec 2024
22 Nov 2024
16 Dec 2024
28 Nov 2024
27 Nov 2024
Amount
700KWp Grid-Connected Rooftop SPV Power Plants With High Power Evacuation at Gaushala, Raipur Kalan, Chandigarh
PART-A - Design, Manufacture, Supply, Erection, Testing and Commissioning 700kWpGrid-Connected Rooftop SPV Power Plants With High Power Evacuation Gaushala, Raipur Kalan, Chandigarh
PART-A Design, Supply, Installation, Testing and Commissioning of High Voltage Power evacuation system with Package substation with Dry type of minimum 1000 kVA, 415V/11kV, 50Hz, step up transformer alongwith all protections, switchgears, required vacuum circuit breakers (630 Amps), RMU panel/H-Pole, Metering panel and cables etc. alongwith required civil work as per requirement.
PART-B Operation & Maintenance for the 700kWp Grid-Connected Rooftop SPV Power Plants With High Power Evacuation on HT Side at Gaushala, Raipur Kalan Chandigarh and the cost of replacement of all the parts covered under Guarantee period of 10 years from the date of commissioning of the Power Plant as per scope mentioned in the DNIT.
PART-B Operation & Maintenance of High Power evacuation System with Package substation of minimum 1000 KVA for10 years from the date of commissioning of the Power Plant
SUNLIVE SOLAR SYSTEM (BID ID -285341)
Sun Astra Energy Solutions Pvt. Ltd. (BID ID -285340)
sonic engineering and automation (BID ID -285332)
Enerture Technologies Pvt Ltd (BID ID -285031)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.55 MB
Costbreakup700kWp.pdf
Additional Documents • 0.19 MB
BOQ_102720.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .