Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹28.5 LAccepted-AOC | L-1 | Accepted-AOC ok | |
| 2 | L-2₹29.1 L+₹60,000 (2.10%)Rejected-Finance DHALIWAL | L-2 | Rejected-Finance Not L-1 | |
| 3 | Rejected-Technical N A | NA | NA | 121004 | - | Rejected-Technical As per Evaluation Bids | |
| 4 | Rejected-Technical VILLAGE PO MALAHAT TEHSIL DISTRICT UNA HP | - | Rejected-Technical As per Evaluation Bids | |
| 5 | Rejected-Technical | - | Rejected-Technical As per Evaluation Bids |
Tender Value
₹28.5 L
EMD Value
₹50,300
Closing Date
30 Jun 2022, 9:00 amClosed
Executive Engineer, Una Division, HPPWD, Una
Executive Engineer, Una Division, HPPWD, Una
Job 2 Construction of link road Kuthar Harijan Basti from Una- Jaijon road RD 0-0 to 4-0 Sub Head P.L 80mm thick interlocking paver block at RD 2-0 to 2-500 and Retaining wall 2-300 to 2-315.Under SCCP
2022_PWD_62037_1
Job 2 Construction of link road Kuthar Harijan Bas
Open Tender
Civil Works - Roads
Item Rate
60 days
Una
Please refer to Bidding Documents
14 documents required · 14 mandatory
₹1,500
₹50,300
31 Mar 2023
24 Jun 2022
30 Jun 2022
24 Jun 2022
30 Jun 2022
24 Jun 2022
Amount
Earth work in excavation for all type of road structure and all type of on classification of soil comprising of ordinary soil, ordinary rock, hard rock chiseling /wedging out rocks ( Where blasting is prohibited) such as retaining walls, breast walls, culverts, drains and parapets etcetera as per drawings and technical specification clause 305.1 and as per direction of the Engineer- In – Charge including carriage of materials within all leads and lifts and other incidential . The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying mechanically mixed and vibrated concrete for plain/ reinforced concrete in open foundations upto all heights for all type structure complete of plain with cement concrete standard concrete design mix of grade M-20 (M-twenty) cement contents not less than 330kg.(three hundred thirty kilogram) per cubic metre in or under water and curing complete including pumping or bailing out water,dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per drawings and technical specification Clause 802.803,1202 and 1203 as per the direction of the Engineer-in- charge including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax ,octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Loosening levelling and compacting original ground supporting embankment to facilitate placement of rist layer of embankment, scarified to a depth of 150mm mixed with water at OMC and then compacted by rolling so as to achieve miniumum dry density as given in ntables 3001 and 3002 as per direction of the Engineer- In – Charge including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax ,octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Construction of Granular Sub Base by providing well graded material, spreading in uniform layers with tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC , and compacting with smooth wheel roller to achieve the desired density complete as per technical specification clause for grading I material including carriage of materials within all leads and lifts and other incidentals The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing , laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (pug mill) carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100KN (Eighty to hundred kilo newton) weight to achieve the desired density including lighting barricading and maintenance of diversion etc. as per tables 400.11 & 400.12 and technical specification clause 406.including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax ,octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying of interlocking concrete block pavements having thickness 80mm thick as per drawing and technical specification clause 1504 ,including carriage of material within all leads and lifts and other incidentials. The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing and laying cement concrete 1:5:10(one cement:five sand: ten graded stone aggregate 40mm(forty millimetre) nominal size plain/reinforced concrete in open foundations and curing complete including cost of form work on ground or under water including pumping and bailing out water,dewatering, removal of sluch as required at site which may arrise at the time of laying under water complete in all heights/depths in Retaining wall and parapets etc.complete as per drawing and technical specification clauses 802,803,1202 and 1203 as per drawing and HP.PWD., technical specification including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax ,octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing weepholes in brick masonry/ stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100mm(hundred milimetre)dia PVC pipe extending through the full width of the structures with slope of 1(v):20(H)(one vertical twenty horzontial) towards drawing face complete as per drawings and technical specification clause 614,709,1204.3.7 including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax ,octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Providing Back filling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax, octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government..
Nitin Sharma
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .