| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance NO 15A NETHAJI NAGAR 8TH STREET ENNORE HIGH ROAD CHENNAI 600057 | CHENNAI | CHENNAI | TAMIL NADU | 600057 | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 CrAdmitted-Finance | ₹1.8 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.5 CrAdmitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹2.5 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K DHINAKARAN L3 | JD ENTERPRISES L1 | Dillibabu L2 |
|---|---|---|---|---|---|---|
| 1.00 | Fabrication, galvanisation and supply of standard HTS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost). | 7.75 | MT | 1,30,000 ₹10.1 L | 1,00,000 ₹7.8 L | 1,15,000 ₹8.9 L |
| 2.00 | Fabrication, galvanisation and supply of standard MS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost). | 73.7 | MT | 1,40,000 ₹1.0 Cr | 1,00,000 ₹73.7 L | 1,10,000 ₹81.1 L |
| 3.00 | Supplying, Transportation from source to site , fabrication, galvanising of standard Bolts and nuts of various sizes and various lengths as per department approved drawing including all taxes and duties, lead, lift and head load, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer at site. | 5.3 | MT | 1,50,000 ₹8.0 L | 1,10,000 ₹5.8 L | 1,00,000 ₹5.3 L |
| 4.00 | Supplying and fixing of Single Suspension Fittings for ACSR Pantheras per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site. | 30 | Set | 2,000 ₹60,000 | 1,500 ₹45,000 | 2,000 ₹60,000 |
| 5.00 | Supplying and fixing of Single Tension Fittings for ACSR Panther as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site. | 102 | Set | 3,000 ₹3.1 L | 1,500 ₹1.5 L | 2,500 ₹2.5 L |
| 6.00 | Supplying and fixing of Vibration Damaper for Panther as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site. | 102 | set | 1,500 ₹1.5 L | 800 ₹81,600 | 1,000 ₹1.0 L |
| 7.00 | Supplying and fixing of Mid span compression Joint for Panther as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site. | 6 | set | 1,000 ₹6,000 | 600 ₹3,600 | 50 ₹300 |
| 8.00 | Supplying and fixing of Repair sleeve for Panther as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site. | 6 | set | 1,000 ₹6,000 | 600 ₹3,600 | 50 ₹300 |
| 9.00 | Supply of Earth wire accessories as per relevant IS of latest issue of 7/3.55mm HTGS Earth wire tension fittings, including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site. | 18 | Set | 1,000 ₹18,000 | 500 ₹9,000 | 700 ₹12,600 |
| 10.00 | Supply of Earth wire accessories as per relevant IS of latest issue of Mid span comp .joint for G.I Earth wire 7/3.55mm including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site. | 5 | set | 1,000 ₹5,000 | 500 ₹2,500 | 10 ₹50 |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
23 Feb 2026, 2:30 pmClosed
CE/TP-I/CNI
230 KV GIS SS Industrial Estate Guindy Chennai
Erection of 110 kv DC line on DC tower Loc 1 to7 LILO 110 KV Veerapuram- Thiruporur proposed 110 KV Sembakkam
2026_EB_659765_1
TP1-164/2025-26 OF CE/TP-I/CNI
Open Tender
Civil Works
120 days
Sembakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.6 L
6 Mar 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
Fabrication, galvanisation and supply of standard HTS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost).
Fabrication, galvanisation and supply of standard MS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost).
Supplying, Transportation from source to site , fabrication, galvanising of standard Bolts and nuts of various sizes and various lengths as per department approved drawing including all taxes and duties, lead, lift and head load, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer at site.
Supplying and fixing of Single Suspension Fittings for ACSR Pantheras per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site.
Supplying and fixing of Single Tension Fittings for ACSR Panther as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site.
Supplying and fixing of Vibration Damaper for Panther as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site.
Supplying and fixing of Mid span compression Joint for Panther as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site.
Supplying and fixing of Repair sleeve for Panther as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site.
Supply of Earth wire accessories as per relevant IS of latest issue of 7/3.55mm HTGS Earth wire tension fittings, including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site.
Supply of Earth wire accessories as per relevant IS of latest issue of Mid span comp .joint for G.I Earth wire 7/3.55mm including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site.
Supply of Earth wire accessories as per relevant IS of latest issue of Aluminium Earth bond, including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site.
Supply of Earth wire accessories as per relevant IS of latest issue of Pipe Type Earthing, including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site.
Clearing juliflora jungle with uprooting including cost of all labour, lead, lift, etc., complete and as directed by the Dept. Engineer at site.
Labour Charges for check survey, clearing jungles, carrying theodolite instrument, measuring span length and pit marking including cost of all men and materials as directed by Department Engineer at site.
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. Soft disintergrated rock not requiring blasting
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B
Sinking well rings in loose soils, black cotton soil, sandy loam and ordinary soil under water including pumping if necessary etc., complete. for stub setting - (0-2 m First depth)
Sinking well rings in loose soils, black cotton soil, sandy loam and ordinary soil under water including pumping if necessary etc., complete. for stub setting - (2-4 m second depth)
Supplying and laying of Pre-cast RCC well rings having inner dia 2.40M, thickness 75mm and 0.30m depth including cost of all materials, curing, placing in correct position, lead, lift, etc., complete.
PCC 1 : 2 :4 Grade using 20 mm HBG metal for padding and footing concrete without form work including cost of all materials curing, labour lead and lift. etc., complete.
PCC 1 : 2 : 4 Grade using 20 mm HBG metal for padding and footing concrete concrete with form work for frustum & Chimney including cost of all materials curing, labour lead and lift. etc., complete.
Providing Shoring and Strutting using necessary Country Wooden Planks 40mm thick and 8cm to 10cm dia. Casurina,vertical posts at every 300mm C/C of 1.80m height duly anchored 300mm into the ground for firm support including placing and making the two rows of planks of top and bottom and one middle row of casurina with strutt arrangements at top so as to afford easy laying as cables. The rate shall also include necessary storage charges for the caasurina and Country Wooden Planks at suitable place so as not to affect the traffic and movement of public transporting them to work spot lead lift besides the cost of materials etc., complete. (Any other improved method of shoring and strutting is also accelptable to TANTRANSCO. But at no extra cost to TANTRANSCO).
Transport, installation of stub & cleats in position & alignment including cost of template assembly, prop setting arrangements transportation charges etc, complete.
RCC 1 : 1.5 : 3 Grade using 20 mm HBG metal for foundation and Chiminey concrete with form work including cost of all materials curing, labour lead and lift. etc., complete.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.
Back filling of pits by the excavated earth including cost of all materials, labour charge, lead, lift, etc., complete.
Removal of excavated earth 2KM away from the tower location including cost of all materials, lead, lift, labour and Transporting charges etc., complete.As directed by the Engineer at site.
Providing temporary approach / stacking platform around tower location by supply and filling up the empty polythene bags with sand stitchig them conveying the same to site and stacking, laying in position around tower location and disposing off from site after successfull completion of work including polythene bags, jute, thread, and all materials and labour charges for filling sand, alying and filling and bailing out of water etc., complete and as directed by the Engineer at site
Labour charges for transporting and erection of towers with bolt nut including sorting out of tower parts tightening, punching of bolts and nuts and rectification of defects if any during erection. (Under Normal condition)
Welding of exposed faces of bolts and nuts 1cm each at two places opposite to each other after tightening, punching to avoid theft of tower parts including cost of welding rods, hire charges for generator including welding rods and painting, with good quality of zinc paint on the welded portion etc., complete.
Labour charges for Transporting through head load and hoisting of 7 units 90 KN Antifog suspension insulators with suspension fittings including all materials, labours, lead, and lift, etc., complete. Under normal condition
Labour charges for Transporting through head load and hoisting of 7 units 90 KN Antifog suspension insulators with suspension fittings including all materials, labours, lead, and lift, etc., complete.Under LC condition
Labour charges for Transporting through head load and hoisting of 8 units 120 KN Antifog Tension insulators with tension fittings including all materials, labours, lead, and lift, etc., complete. Under normal condition
Labour charges for Transporting through head load and hoisting of 8 units 120 KN Antifog Tension insulators with tension fittings including all materials, labours, lead, and lift, etc., complete. Under LC condition
Transporting and paying out of 6 nos Panther conductor with fittings, Stringing conductor, rough sagging, tensioning to correct sag and fixing to towers as per specification and as directed by the Board Engineer at site clipping, jumpering, labour charges for fixing midspan compression joints repair sleeves wherever required and vibration dampers as directed by the Engineer including cost of loading and unloading, transporting, sorting out of drums at store and at site according to drum schedule, providing trestles etc complete. (single span cut point) per KM Under Normal condition
Transporting and paying out of 6 nos Panther conductor with fittings, rough sagging, tensioning to correct sag and fixing to towers as per specification and as directed by the Board Engineer at site clipping, jumpering, labour charges for fixing midspan compression joints repair sleeves wherever required and vibration dampers as directed by the Engineer including cost of loading and unloading, transporting, sorting out of drums at store and at site according to drum schedule, providing trestles etc complete. For Single span (Under Normal condition)
Transporting and paying out of 6 nos Panther conductor with fittings, rough sagging, tensioning to correct sag and fixing to towers as per specification and as directed by the Board Engineer at site clipping, jumpering, labour charges for fixing midspan compression joints repair sleeves wherever required and vibration dampers as directed by the Engineer including cost of loading and unloading, transporting, sorting out of drums at store and at site according to drum schedule, providing trestles etc complete. For Jumper span (Under Normal condition)
Transporting and paying out of 6 nos Panther conductor with fittings, rough sagging, tensioning to correct sag and fixing to towers as per specification and as directed by the Board Engineer at site clipping, jumpering, labour charges for fixing midspan compression joints repair sleeves wherever required and vibration dampers as directed by the Engineer including cost of loading and unloading, transporting, sorting out of drums at store and at site according to drum schedule, providing trestles etc complete. For Single span (Under Normal condition)
Stringing of one No 7/3.55 mm HTGS earth wire paying out rough sagging tensioning to correct sag and fixing to towers as per specification and as directed by the board Engineer at site clipping, jumpering, labour charges for fixing midspan compression joints, repair sleeves, wherever required and vibration dampers in all tension location as directed by the board, and other charges, all T&Ps required for the entire safe operation for stringing work labour lead, lifts, etc., complete.But excluding cost of line materials any defects noticed during final checking handing over to the board and commissioning of the line muust be attended by the contractor without any extra cost of the Board. (Under Normal Condition). For single span
Stringing of one No 7/3.55 mm HTGS earth wire paying out rough sagging tensioning to correct sag and fixing to towers as per specification and as directed by the board Engineer at site clipping, jumpering, labour charges for fixing midspan compression joints, repair sleeves, wherever required and vibration dampers in all tension location as directed by the board, and other charges, all T&Ps required for the entire safe operation for stringing work labour lead, lifts, etc., complete.But excluding cost of line materials any defects noticed during final checking handing over to the board and commissioning of the line muust be attended by the contractor without any extra cost of the Board. (Under Normal Condition). Jumper span
Stringing of one No 7/3.55 mm HTGS earth wire paying out rough sagging tensioning to correct sag and fixing to towers as per specification and as directed by the board Engineer at site clipping, jumpering, labour charges for fixing midspan compression joints, repair sleeves, wherever required and vibration dampers in all tension location as directed by the board, and other charges, all T&Ps required for the entire safe operation for stringing work labour lead, lifts, etc., complete.But excluding cost of line materials any defects noticed during final checking handing over to the board and commissioning of the line muust be attended by the contractor without any extra cost of the Board. (Under LC Condition). Single span
Providing Temporary stay during rough sagging and tensioning including necessary excavation burying anchor strucutures fixing stay wire refillings and removal of stays after tensioning with cost of all materials, all labour leads, lifts, etc., complete.
Lowering of LT/HT Line during stringing of power conductor and restringing to the orginal position after completion of stringing work including cost of all labour,lead, lift, etc., complete.
Painting with two coats of anti corrosive black paint over stub and leg of tower for depth of 0.45 m including cost of all materials, labours, lead and lift, etc., complete.
Supply of Number plate as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site.
Supply of Danger Board as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site.
Supply of Phase plate (Set of three) as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site.
Supply of Circuit plate as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, as directed by the engineer incharge at site.
Providing pipe type earthing including cost of 25 mm GI earth pipe B class of length 3 m,earth strip, cutting of earth work to the required length and connecting to the earth pipe and stub including cost of all materials ,lead,lift etc., complete.
Dewatering charges during excavation and concreting wherever required with 3/5 HP Diesel motor with Pump including hire charges, labour, fuel, oil, transport and operator charges etc., complete.
Providing muffing and coping in P.C.C 1:2:4 using broken stone 12 to 20mm size metal including cost of all materials, formwork, labour, curing, transporting, lead and lift etc., complete
Providing plastering C:M 1 : 5, 12 mm thick including cost of all materials labour lead, lift, etc., complete in all respect
Colour washing two coats using Cement paint over one coat of white washing including cost of all materials, colur pigments labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site
CGST in % (For Bidders inside TamilNadu)
SGST in % (For Bidders inside TamilNadu)
IGST in % (For Bidders outside TamilNadu)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_791616.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid