Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹88.2 LAccepted-AOC TENTUNBARIA GARIA KOLKATA 700084 | KOLKATA | 24 PARAGANAS SOUTH | WEST BENGAL | 700084 | L1 | Accepted-AOC being lowest bidder | |
| 2 | L2₹1.1 Cr+₹22.1 L (25.1%)Rejected-Finance | L2 | Rejected-Finance Other than Lowest Bidder | |
| 3 | L3₹1.1 Cr+₹26.1 L (29.6%)Rejected-Finance RSD STREET HALL BAZAR AMRITSAR 143001 PUNJAB | AMRITSAR | AMRITSAR | PUNJAB | 143001 | L3 | Rejected-Finance Other than Lowest Bidder | |
| 4 | Rejected-Technical | - | Rejected-Technical Enlisted c i category of your firm is of Maintenance only. However, this tender is not a maintenance work. Hence, your bid is rejected please. | |
| 5 | Rejected-Technical B XXIII 56 A PREM NAGAR SAINGARGH PATHANKOT 145001 PUNJAB | PATHANKOT | PATHANKOT | PUNJAB | 145001 | - | Rejected-Technical Enlisted c i category of your firm is of Maintenance only. However, this tender is not a maintenance work. Hence, your bid is rejected please. |
Tender Value
₹1.3 Cr
EMD Value
₹2.0 L
Closing Date
31 Dec 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer 31 Zone
Headquarter Chief Engineer 31 Zone Sonwar Srinagar
PROVN OF CHS FOR CDU DESIGN AND BUILD AT BB CANTT SRINAGAR
2022_MES_561979_1
PROVN OF CENTRAL HEATING SYSTEM FOR CDU (DESIGN AN
Open Tender
Miscellaneous Works
Item Rate
240 days
Srinagar
As per NIT
11 documents required · 11 mandatory
₹1,000
Yes
GE 864 EWS
₹2.0 L
HQ CE 31 Zone
21 Mar 2023
8 Nov 2022
2 Jan 2023
8 Nov 2022
31 Dec 2022
15 Dec 2022
8 Nov 2022 - 23 Nov 2022
15 Nov 2022
Amount
Note: (i) Please refer Schedule 'A' Notes given in tender documents. (ii) This schedule 'A' Part-I to Part-II is not estimated by MES and the estimated rate indicated as "Rs. 0.00" under Col. 5 signifies this fact only. (iii) The quoted rates shall include the rates of all repair works including all the Material and Labour during execution of work for the existing building as per existing specification of building all as directed by Engineer in charge.
CENTRAL HEATING SYSTEM WORKS (SCHEDULE 'A' PART-I)
Design, Supply, installation, commissioning and testing of Central Heating Plant using oil fired Glycol based Hot water generator (Kerosene/ HSD oil as fuel) suitable for operation at 50Hz, Three phase 4 wire, 433/230 volts, AC Supply, complete for maintaining the temperature inside the building at 22°C± 2°C during winter for the buildings. The temperature should be maintained at BB Cantt, Srinagar as per the data sheet given in Particular Specifications at ( min -10°C and max +35°C) at the height of 1727 mtr above MSL . Tentative Capacity of Plants is as follows : (a) Central Dental Unit (CDU) building (G+2) - 02 nos x 200000 Kcal/Hr (working) alongwith 01no x 200000 KCal/Hr (stand by).
Each CHS Plant should comprise of boilers (2 nos Working + 1 no Stand by), glycol solution make up centrifugal circulation pumps (01 nos Working + 1 no Stand by) for each boiler, flue gas exhaust pipe connected to chimney as per CPCB norms (01 No with Each Boiler) , expansion tank, glycol fluid tank, underground bulk oil storage tank (not less than 10 KL), day oil storage tank (not less than 990 Ltrs), transfer gear oil pump kerosene oil (01 no Working + 1 no Stand by) for each boiler. Kerosene/HSD oil piping of suitable size with necessary accessoires, hot glycol fluid piping of suitable size with suitable insulation and necessary accessoires, suitable valves, Wall mounted FCUs with remote control, Wall mounted Towel Radiators in each toilets, 1st fill of glycol charge (The mixture of water and glycol shall have freezing temperature of -25 deg C), LT Panel with necessary safety control system with all accessoires including all necessory electric connection with the equipment (Cables shall run in Cable tray of suitable size), danger notice plate, “ No Smoking " and “ Flammable” sign board as per requirement of Petroleum Rules and CCOE Nagpur) and all other necessary items. Notes : (a) All the equipment & accessories should be as per appropriate codel provisions. (b) All the equipment & accessories should be as per appropriate codel provisions. The tenderer is required to workout their rates/ price and quote their based on the Design. The rates quoted by the tenderer for the work deemed to include the provision of following.
(i) Necessary PCC/RCC foundation for Chimney, Pumps, Boilers, Tanks and other equipments as specified by the OEM. (ii) Design, supply, install, testing and commissioning of CHS to accomodate existing plant room of size 13.96m x9.00m x 5.15m. (iii) Distance between CHS room and CDU building - 24M (approx) (iv) Submission of whole scheme of CHS including Boiler and pumps capacity design, FCUs capacity design, piping design from plant to the rooms for circulation of Glycol mixture and technical specification duly vetted by IIT (not by professor/designer in his individual capacity) within 90 days form date of commencement of work for approval of Accepting Officer. The invoice of the payment made to institute for vetting the whole scheme to be submitted to the Department. (v) All the Electric Panels should be as per suitable ingress portection Code and CPRI approved. All the equipment & accessories should be as per appropriate codal provisions. (vi) All the miscellenous and other items, if any required, as per OEM's Design. (vii) Piping between CDU building and CHS room to be laid as per best engineering practice. Cost of cutting road/path/culvert or making underground duct for pipes etc including making good to the disturbed surfaces matching with existing are deemed to be included in the quoted rates. (viii) All the makes of the equipments should be as per the approve makes of products as listed in appx of perticular specifications.
Additional Details (a) Size of windows made with Aluminium with 4 mm glass as following:- 6/ TW = 600 mm x 900 mm 5/ W3 = 1500 mm x1600 mm A C 6/ FW 3 = 1800 mm x 1600 mm 4/ FW 2 = 800mm x 1200 mm C B 5 / W3 = 1500 mm x 1200 mm 6/TW = 600 mm x 900 mm B A 6/FW2 = 1200 mm x 1600 mm C
(b) Size of Door made with Aluminium 40 mm with 4 mm glass as following:- D10 = 1000 mm x 2100 mm D12 = 1200mm x 2100 mm FA FA ALD2 = 1000 mm x 2100 mm ALD 1 = 1200 mm x 2100 mm C/ALFGZ = 750 mm x 2500 mm 6 /ALD2 = 1500 mm x 2500 mm L B/ALD2 = 1500 mm x 2500 mm L
(c) External wall - External wall plaster in two layers, First Layer 10 mm thick in cm (1:6) and second layer 5 mm thick in cm (1:4) (d) Internal wall - Internal wall plaster in cement mortar 15 mm thick in cm (1:6) (e) Following Rooms have Wooden wall panelling of thickness 9 mm : (i) Steno waiting Room (ii) OC Room (iii) Dental Officer (iv) Conference room (v) JCO/ OR family waiting room (vi) JCO/ OR Waiting room (vii) Officer Family waiting Room (viii) Dental health room (ix) Oral health demo room (x) Training / Officer Room (f) Floor: Tiles (g) Bldg Elevation : As Showing in Drawing (h) Room Size : As showing in Drawing
(j) Design Parameters (i) Min Outside design condition : (-) 10° C, (ii) Max Outside design condition : + 35° C , (iii) Inside design condition : 22°C± 2°C , (iv) Air Change : 1.5% Naturally (v) Humiditifier should be provided in all rooms to maintain the proper Humidity in Bldg. (k) Suitable Air Curtain shall be provided in existing building door openings - 03 Nos Note: Above mentioned condition should be maintained during the entire winter season. (Mid Oct- Mid Apr) Stand by DG Set : Load already has been catered in Original work. Transformer : Load already has been catered in Original work. Make : Makes approved by E- in -C or CE Northen Command should only be incorporated in the design parameters if not found specified in tender documents.
MANNING AND OPERATION OF CHS PLANT DURING DEFECT LIABILITY PERIOD (SCHEDULE 'A' PART-II)
Outsourcing of services for first winter season after completion of phase-I for manning and operation of CHS Plant of Dental Unit (CDU) at BB Cantt by deploying one operator in each shift (each shift of 08 Hours) in three shift i.e round the clock including Sundays and holidays complete, in reliable, safe & efficient operating conditions through qualified and experienced operators for the CHS after completion of Phase-I work as specified and directed by Engineer-in-charge. Notes : (i) Operator will operate CHS and ensure proper functioning of CHS. (ii) The operator will not leave the duty place without permission. (iii) Any minor repairs required will be done after informing the department. (iv) Outsorcing staff will change after every 11 months. (v) Daily brooming, sweeping and removing cobweb inside the Plant room and surrounding of CHS plant room. (vi) Daily logsheet of installation in Proper format duly filled by the attendent, printed log sheets and other related documents should be provided by contractor. (vii) CHS operator should possess minimum ITI technical qualification. (viii) The duty staff will maintain the premises clean and tidy will report breakdown or any other related doc should be provided by contractor. (ix) Regular cleaning of equiptment / machinery as specified and directed. (x) The required T&P and safety measure shall be provided by the contractor incl cost of the uniform is deemed to be included in the quoted rate. (xi) CHS will run only on winter season as per work order for Phase-II placed by GE
Outsourcing of services for next winter season after completion of phase-I for manning and operation of CHS Plant of Dental Unit (CDU) at BB Cantt by deploying one operator in each shift (each shift of 08 Hours) in three shift i.e round the clock including Sundays and holidays complete, in reliable, safe & efficient operating conditions through qualified and experienced operators for the CHS after completion of Phase-I work as specified and directed by Engineer-in-charge. Notes : (i) Operator will operate CHS and ensure proper functioning of CHS. (ii) The operator will not leave the duty place without permission. (iii) Any minor repairs required will be done after informing the department. (iv) Outsorcing staff will change after every 11 months. (v) Daily brooming, sweeping and removing cobweb inside the Plant room and surrounding of CHS plant room. (vi) Daily logsheet of installation in Proper format duly filled by the attendent, printed log sheets and other related documents should be provided by contractor. (vii) CHS operator should possess minimum ITI technical qualification. (viii) The duty staff will maintain the premises clean and tidy will report breakdown or any other related doc should be provided by contractor. (ix) Regular cleaning of equiptment / machinery as specified and directed. (x) The required T&P and safety measure shall be provided by the contractor incl cost of the uniform is deemed to be included in the quoted rate. (xi) CHS will run only during winter season as per work order for Phase-II placed by GE
M/S Razdan Buildersand suppliers
Intrernational Engineers
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .