Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.1 LAccepted-AOC | ₹4.1 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹4.3 L+₹23,462.50 (5.75%)Rejected-AOC | ₹4.3 L+₹23,462.50 (5.75%) | 2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M Appusamy L2 | S BALASUBRAMANIAN L1 |
|---|---|---|---|---|---|
| 1.00 | Cutting open roads Black topped surface for laying pipe line including cost, conveyance of all to site, and all labour charges etc., complete as per standard specification. | 67.5 | 1m3 | 1,100 ₹74,250 | 995 ₹67,162.5 Lowest |
| 2.00 | Earth work excavation for foundation in all kinds of soils and subsoils with intial lead of 10 metres and initial lift of 2 metres to full depth as may be directed except hard rock requiring blasting inclusive of shoring strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layer of 15cm thick well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers etc., complete complying with standard specification. | 135 | 1m3 | 225 ₹30,375 | 219 ₹29,565 Lowest |
| 3.00 | Supply and delivery of following materials UPVC Pipe specifications including cost of materials, loading,unloading and transportation charges etc., complete.32mm dia UPVC pipe | 600 | 1Rm | 135 ₹81,000 | 120 ₹72,000 Lowest |
| 4.00 | 20mm dia UPVC pipe | 125 | 1Rm | 62 ₹7,750 | 61 ₹7,625 Lowest |
| 5.00 | 90mm dia PVC pipe | 125 | 1Rm | 232 ₹29,000 Lowest | 232 ₹29,000 Lowest |
| 6.00 | 32mm dia GI pipe | 135 | 1Rm | 300 ₹40,500 | 298 ₹40,230 Lowest |
| 7.00 | 32mm dia UPVC Elbow | 45 | 1No. | 45 ₹2,025 | 43 ₹1,935 Lowest |
| 8.00 | 32mm dia UPVC Tee | 20 | 1No. | 57 ₹1,140 Lowest | 57 ₹1,140 Lowest |
| 9.00 | 32mm x 25mm dia UPVC Reducer | 100 | 1No. | 28 ₹2,800 | 27 ₹2,700 Lowest |
| 10.00 | 20mm dia UPVC Elbow | 35 | 1No. | 18 ₹630 | 17 ₹595 Lowest |
Tender Value
₹4.9 L
EMD Value
₹4,900
Closing Date
6 Mar 2026, 3:00 pmClosed
Municipal Commissioner
Bhavani Municipal Office
Repair and Maintenance of pipeline work for water supply arrangements at ward no.1 to 27 in Bhavani Municipality.
2026_MAWS_671075_1
163/2026/E1
Open Tender
Civil Works
Works
Bhavani Municipal Office
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,900
27 Jun 2026
5 Mar 2026
6 Mar 2026
5 Mar 2026
6 Mar 2026
5 Mar 2026
Cutting open roads Black topped surface for laying pipe line including cost, conveyance of all to site, and all labour charges etc., complete as per standard specification.
Earth work excavation for foundation in all kinds of soils and subsoils with intial lead of 10 metres and initial lift of 2 metres to full depth as may be directed except hard rock requiring blasting inclusive of shoring strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layer of 15cm thick well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers etc., complete complying with standard specification.
Supply and delivery of following materials UPVC Pipe specifications including cost of materials, loading,unloading and transportation charges etc., complete.32mm dia UPVC pipe
20mm dia UPVC pipe
90mm dia PVC pipe
32mm dia GI pipe
32mm dia UPVC Elbow
32mm dia UPVC Tee
32mm x 25mm dia UPVC Reducer
20mm dia UPVC Elbow
20mm dia UPVC FTA
20mm dia PVC Tap
32mm UPVC Ball Valve
Laying and jointing the following PVC pipes and GI Pipes with specials to proper line and level including jointing but excluding cost of pipes and jointing materials including all labour charges etc., Completed. 32mm dia UPVC pipe
20mm dia UPVC pipe
90mm dia PVC pipe
32mm dia GI pipe
Supply and delivery and fixing of 2000 litres HDPE tank as per IS 12701/1996 including loading, unloading, transportation and labour charges for fixing of the GI pipes and specials for pipe connection works including, cutting, threading and fixing charges tec., as Specification.
Refilling with excavated earth other than Sand inculding Section and Levelling and all labour charges for filling etc., complete as per standard specification.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_806473.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .