Tender Value
₹1.8 L
EMD Value
₹3,600
Closing Date
17 Aug 2026, 6:00 pmClosed
XEN Hyd Gandoh
XEN Hyd Gandoh
Construction of sedimentation tank atK temple source. under District Capex Budge 2026-27 (JKSSR 2022)
2026_PHE_320224_5
e NIT 02 of 2026-27
Open Tender
Civil Works
Percentage
XEN Hyd Gandoh
Construction of sedimentation tank atK temple source. under District Capex Budge 2026-27 (JKSSR 2022)
2 documents required · 2 mandatory
₹500
Yes
Xen Hyd Division Gandoh
₹3,600
Yes
XEN Hyd Gandoh
21 Aug 2026
10 Aug 2026
18 Aug 2026
10 Aug 2026
17 Aug 2026
10 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/work in excavation in 70% all kind of soil and 20% ordinary rock 10% Hard rock | 8.04 | Cum | 824.9 | ₹6,632.2 |
| 2 | Providing and laying in position cement concrete in 1:1.5:3 mix incl Curring but Excl.Cost of Centering & Shuttering | 0.99 | Cum | 7,788.4 | ₹7,710.52 |
| 3 | Providing and laying in position cement concrete in 1:4:8 mix with 40 mm nominal size of aggregate | 0.99 | Cum | 5,202.9 | ₹5,150.87 |
| 4 | Providing and laying in position cement concrete in 1:1.5:3 mix incl Curring but Excl.Cost of Centering & Shuttering | 2.67 | Cum | 9,395.7 | ₹25,086.52 |
| 5 | Providing and laying in position cement concrete in 1:1.5:3 mix in Beams suspended floors having slope upto 15 degree incl.Curring but Excl Cost of Centering and Shuttering | 0.8 | Cum | 9,821.85 | ₹7,857.48 |
| 6 | 50 mm thick cement Contr. Flooring 1:2:4 Mix | 5.25 | sqm | 562.15 | ₹2,951.29 |
| 7 | 12 mm thick cement Plaster 1:4: Mix | 36.08 | Sqm | 353.1 | ₹12,739.85 |
| 8 | Centering & Shuttering Incl.strutting Propping etc and removal of Form work for foundation footimng base for Columns | 3.35 | Sqm | 286.35 | ₹959.27 |
| 9 | Centering & Shuttering Incl.strutting Propping etc and removal of Form work for foundation footimng base for Columns | 36.92 | Nos | 628.95 | ₹23,220.83 |
| 10 | Centering & Shuttering Incl.strutting Propping etc and removal of Form work for foundation footimng base for Columns | 5.11 | sqm | 718.2 | ₹3,670 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQTemple.xls
Tender Documents • 0.33 MB
corringedum.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .