| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAccepted-AOC 82 1 BECHU CHATTERJEE STREET KOLKATA 700009 | KOLKATA | KOLKATA | WEST BENGAL | 700009 | ₹13.4 L Quoted ₹14.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹15.2 LRejected-Finance GARUI PASCHIM PARA KOLKATA 700065 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700065 | ₹15.2 L | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹15.4 LRejected-Finance ALAMPUR NODAKHALI | ₹15.4 L | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | S. P. CONSTRUCTION H1 | SARKAR ELECTRICAL H2 | H. DEY ELECTRIC STORES H3 |
|---|---|---|---|---|---|---|
| 1.00N.B:-All Quoted Rates are inclusive of GST @ 18% + CESS @ 1% | ||||||
| 2.00 | Erection of steel tubular pole inside ground (overall length 11 meter) on hire basis by excavation of earth of any kind of soil 2.5 mtr. Depth below ground level with proper piling at different places at sea beach with all protection to avoid accidents as per IE rules & as per direction of EIC complete (each pole should be properly earthed) on or before 05.01.2026 | 130 | Each | 1,355 ₹1.8 L | 1,340 ₹1.7 L | 1,334 ₹1.7 L |
| 3.00 | Providing on hire basis including supplying, laying of 4 sq.mm 1.1 kv single core PVC instated and sheathed stranded aluminium cable. and transportation charges for the following cables including dismantling the same after completion of the mela | 8,250 | Mtr | 8 ₹66,000 | 7.5 ₹61,875 | 7 ₹57,750 |
| 4.00 | Supply on hire basis 4.88 mtr long 100 mm dia(avg.) bamboo post and erecting the same at different places of pilgrim sheds as per IE rule and direction of EIC [Avg. distance from post to post is 20 mtr] | 400 | Each | 31.5 ₹12,600 | 31 ₹12,400 | 30 ₹12,000 |
| 5.00 | Drawing of 150 watt LED street light fixture in different place of road,on hire basis from 05-01-2026 to 16-01-2026 (12 days x 105 fittings per day) | 1,260 | Pt | 219 ₹2.8 L | 217 ₹2.7 L | 215 ₹2.7 L |
| 6.00 | Providing on hire basis and laying of 1100 V grade 3 ½ core 25 sq. mm. PVC Al. Ar. Cable and dismantling the same after mela. | 175 | Mtr | 83 ₹14,525 | 82 ₹14,350 | 81 ₹14,175 |
| 7.00 | Drawing tube light points from different feeder line to different places on salbollah/Bamboo post inside and outside Mela ground and link road of pilgrim shed as per direction of EIC with supply on hire basis 40 watt. Tube light complete set etc. with inter connection and controlling switch complete (Damaged materials will have to be replaced by the agency at their own cost) from 07.01.2026 to 16.01.2026 = 10 days x 500 pts. | 5,000 | /pt | 9 ₹45,000 | 8.5 ₹42,500 | 8.3 ₹41,500 |
| 8.00 | Supply & fitting fixing of 2 PIN 5 amps on hire basis from 07-01-2026 to 16-01-2026 = 10 days | 325 | /pt | 10 ₹3,250 | 9.5 ₹3,087.50 | 9 ₹2,925 |
| 9.00 | Drawing ceiling light points from different feeder line to different shed at latrine area as directed by EIC with supply on hire basis 60/100 watt bulb, holder and controlling switch etc. on bamboo post where necessary (Damaged materials will have to be replaces by the agency at their own cost) from 07.01.2026 to 16.01.2026 = 10 days x 750 pts. | 7,500 | /pt | 4 ₹30,000 | 3.7 ₹27,750 | 3.3 ₹24,750 |
| 10.00Fitting fixing the street light fixture on existing PCC pole/tower from different feeder line to different pole inside and outside Mela ground as per direction of EIC with supplying on hire basis 400 watt/250 watt/150 watt/70 watt./400 watt Sodium [Twin] vapour lamp with all accessories complete with 7/20 PVC wire for looping arrangement including all other materials from 03.01.2026 to 17.01.2026 = 15 days (Damaged materials will have to be replaced by the agency at their own cost, and all the fixture should be of Philips make). | ||||||
Tender Value
Refer Docs
EMD Value
₹32,500
Closing Date
19 Nov 2025, 10:00 amClosed
Executive Engineer SMD PHE Dte
Chetla
As per NIeT documents in connection with Ganga Sagar Mela 2026
2025_PHED_926249_16
WBPHE/EE/SMD/NIeT-39 of 2025-26
Open Tender
Electrical Work/ Equipment
60 days
Ganga Sagar
Please refer Tender documents.
6 documents required · 6 mandatory
₹32,500
7 Apr 2026
1 Nov 2025
21 Nov 2025
1 Nov 2025
19 Nov 2025
1 Nov 2025
Amount
Erection of steel tubular pole inside ground (overall length 11 meter) on hire basis by excavation of earth of any kind of soil 2.5 mtr. Depth below ground level with proper piling at different places at sea beach with all protection to avoid accidents as per IE rules & as per direction of EIC complete (each pole should be properly earthed) on or before 05.01.2026
Providing on hire basis including supplying, laying of 4 sq.mm 1.1 kv single core PVC instated and sheathed stranded aluminium cable. and transportation charges for the following cables including dismantling the same after completion of the mela
Supply on hire basis 4.88 mtr long 100 mm dia(avg.) bamboo post and erecting the same at different places of pilgrim sheds as per IE rule and direction of EIC [Avg. distance from post to post is 20 mtr]
Drawing of 150 watt LED street light fixture in different place of road,on hire basis from 05-01-2026 to 16-01-2026 (12 days x 105 fittings per day)
Providing on hire basis and laying of 1100 V grade 3 ½ core 25 sq. mm. PVC Al. Ar. Cable and dismantling the same after mela.
Drawing tube light points from different feeder line to different places on salbollah/Bamboo post inside and outside Mela ground and link road of pilgrim shed as per direction of EIC with supply on hire basis 40 watt. Tube light complete set etc. with inter connection and controlling switch complete (Damaged materials will have to be replaced by the agency at their own cost) from 07.01.2026 to 16.01.2026 = 10 days x 500 pts.
Supply & fitting fixing of 2 PIN 5 amps on hire basis from 07-01-2026 to 16-01-2026 = 10 days
Drawing ceiling light points from different feeder line to different shed at latrine area as directed by EIC with supply on hire basis 60/100 watt bulb, holder and controlling switch etc. on bamboo post where necessary (Damaged materials will have to be replaces by the agency at their own cost) from 07.01.2026 to 16.01.2026 = 10 days x 750 pts.
Fitting fixing the street light fixture on existing PCC pole/tower from different feeder line to different pole inside and outside Mela ground as per direction of EIC with supplying on hire basis 400 watt/250 watt/150 watt/70 watt./400 watt Sodium [Twin] vapour lamp with all accessories complete with 7/20 PVC wire for looping arrangement including all other materials from 03.01.2026 to 17.01.2026 = 15 days (Damaged materials will have to be replaced by the agency at their own cost, and all the fixture should be of Philips make).
400 watt S.V. lamp =35 pts. X 15 days
400watt(twin) for tower =35 pts x15 days
400watt(single) SON for tower =120 pts x 15 days
Making Earthing arrangement on hire basis supply 5/8'' dia earth spike of 2 mtr. Long with galvanized bolts nuts sand washer etc. including supply and fixing 8 SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of PCC pole.
Guarding arrangement of the whole installation for the entire period.[ 15 days x 1 personnel/shift x 3 shift x 4 sites]
SARKAR ELECTRICAL (BID ID -7277652)
H. DEY ELECTRIC STORES (BID ID -7277723)
stage.html
html • 0.05 MB
technical_2197141.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tendernotice_2.pdf
PDF • 0.45 MB
Tendernotice_3.pdf
PDF • 1.00 MB
BOQ_2197141.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid