| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹32.5 LAccepted-AOC EAST KAJORA COLLIERY PO DAKSHIN KHANDA BARDHAMAN 713338 WEST BENGAL INDIA | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713338 | ₹32.5 L Quoted ₹27.6 L | 1 | Accepted-AOC Accepted as L1 bidder and quoted amount is including GST. |
| 2 | 2₹27.8 L+₹21,352.03 (0.77%)Rejected-Finance | ₹27.8 L+₹21,352.03 (0.77%) | 2 | Rejected-Finance Rejected as L2 bidder. |
| 3 | 3₹29.0 L+₹1.4 L (5.14%)Rejected-Finance MAIN ROAD JARHI POST BHATGAON DISTT SURAJPUR C G PIN 497235 | SURAJPUR | CHHATTISGARH | 497235 | ₹29.0 L+₹1.4 L (5.14%) | 3 | Rejected-Finance Rejected as L3 bidder. |
| Sl No | Description | Qty | Unit | JEEWAN SINGH RAUTELA L3 | ANKUR KUMAR L2 | RAJESH SINGH L1 |
|---|---|---|---|---|---|---|
| 1.00Excavation/cutting in floor/side/roof and dressing using pick axes by manual labour. | ||||||
| 1.10 | Hard Stome | 37.44 | CuM | 4,237 ₹1,58,633.28 | 4,049 ₹1,51,594.56 | 3,919.02 ₹1,46,728.11 Lowest |
| 1.20 | Mixed coal & Shale. | 56.32 | CuM | 1,300 ₹73,216 | 1,242 ₹69,949.44 | 1,201.83 ₹67,687.07 Lowest |
| 2.00 | Cleaning of malma, muck slurry in gallery. | 201.12 | CuM | 344 ₹69,185.28 | 329 ₹66,168.48 | 318.5 ₹64,056.72 Lowest |
| 3.00 | RCC work in UG including centering & shuttering etc rainforce cement for RCC work including cutting, bending placing in position and binding ect, all complete. (1:2:4). | 220.48 | CuM | 6,090 ₹13,42,723.2 | 5,820 ₹12,83,193.6 | 5,633.59 ₹12,42,093.92 Lowest |
| 4.00 | 12 MM thick cement plaster (Both Side) | 591.36 | SqM | 270 ₹1,59,667.2 | 259 ₹1,53,162.24 | 250.38 ₹1,48,064.72 Lowest |
| 5.00 | Loading, transportation and unloading of track line from surface/old working to site of working. | 220 | Mtr | 7.8 ₹1,716 | 7 ₹1,540 Lowest | 7.2 ₹1,584 |
| 6.00 | Laying of haulage trackline in UG. | 220 | Mtr | 137 ₹30,140 | 131 ₹28,820 Lowest | 140 ₹30,800 |
| 7.00Transportation of Material. | ||||||
| 7.10 | Loading of all kinds building material into tub at Incline mouth. | 355.2 | CuM | 200 ₹71,040 | 192 ₹68,198.4 | 187.17 ₹66,482.78 Lowest |
Tender Value
₹55.6 L
EMD Value
₹69,500
Closing Date
10 Aug 2026, 5:00 pmClosed
General Manager(Oprn.), JK Area
Office of The General Manager(Oprn.), JK Area, P.O-Jamuna Colliery, Dist. Anuppur (MP), Pin-484444, SECL, Bilaspur BILASPUR
Construction of 32 nos RCC Isolation stopping for sealing C-1 and C-2 depillaring panel in M.K.Top seam of Bartarai UG Mine, Amadand UG Sub Area, Jamuna kotma Area.
2026_SECL_362464_1
SECL/JK/GM(O)/26-27/eT/05 Dated 23.07.2026
Open Tender
Civil Works - Others
Item Rate
240 days
Bartarai Colliery, Amadand UG Sub Area, JK Area
AS PER NIT
5 documents required · 5 mandatory
₹69,500
27 Aug 2026
23 Jul 2026
11 Aug 2026
23 Jul 2026
10 Aug 2026
24 Jul 2026
24 Jul 2026 - 2 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 0.0 | Excavation/cutting in floor/side/roof and dressing using pick axes by manual labour. | - | - | - | - | - |
| 0.0 | Hard Stome | 37.44 | CuM | 6,875.48 | ₹2,57,417.97 | 4171.25% |
| 0.9 | Mixed coal & Shale. | 56.32 | CuM | 2,108.48 | ₹1,18,749.59 | 4171.25% |
| 0.0 | Cleaning of malma, muck slurry in gallery. | 201.12 | CuM | 558.78 | ₹1,12,381.83 | 4171.25% |
| 0.0 | RCC work in UG including centering & shuttering etc rainforce cement for RCC work including cutting, bending placing in position and binding ect, all complete. (1:2:4). | 220.48 | CuM | 9,883.5 | ₹21,79,114.08 | 4171.25% |
| 0.0 | 12 MM thick cement plaster (Both Side) | 591.36 | SqM | 439.27 | ₹2,59,766.71 | 4171.25% |
| 0.0 | Loading, transportation and unloading of track line from surface/old working to site of working. | 220 | Mtr | 12.65 | ₹2,783 | 4171.25% |
| 0.0 | Laying of haulage trackline in UG. | 220 | Mtr | 223 | ₹49,060 | 4171.25% |
| 0.0 | Transportation of Material. | - | - | - | - | - |
| 0.9 | Loading of all kinds building material into tub at Incline mouth. | 355.2 | CuM | 325.38 | ₹1,15,574.98 | 4171.25% |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.16 MB
Tendernotice_3.pdf
PDF • 2.10 MB
Tendernotice_4.pdf
PDF • 0.66 MB
BOQ_375372.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .