Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L1 | Accepted-AOC The Lowest Rate Quoted |
| 2 | L2₹1.1 Cr+₹5.0 L (4.97%)Rejected-Finance | ₹1.1 Cr+₹5.0 L (4.97%) | L2 | Rejected-Finance The Highest Rate Quoted |
| 3 | Rejected-Technical COIMBATORE CORPORATION | COIMBATORE | COIMBATORE | TAMIL NADU | - | - | Rejected-Technical Adequate and Relevant particulars not submitted by this bidder |
| 4 | Rejected-Technical DOOR NO 5A SOUTH STREET THENNIMALAI NANGUNERI TIRUNELVELI | - | - | Rejected-Technical Adequate and Relevant particulars not submitted by this bidder |
| 5 | Rejected-Technical | - | - | Rejected-Technical Adequate and Relevant particulars not submitted by this bidder |
Tender Value
₹1.0 Cr
EMD Value
₹1.0 L
Closing Date
30 Sept 2020, 3:00 pmClosed
Project Director
DRDA Tirunelveli
Tirunelveli District TNRRIS 2020 21 Strengthening of 3 roads in Manur Panchayat union in package no.13
2020_RDTN_180059_16
A2/4520/2020 TNRRIS 20-21
Open Tender
Civil Works
Item Wise
180 days
Tirunelveli District
Scanned copy of pre qualification details
3 documents required · 3 mandatory
₹0
₹1.0 L
DRDA ,Tirunelveli
16 Nov 2020
19 Sept 2020
30 Sept 2020
19 Sept 2020
30 Sept 2020
25 Sept 2020
24 Sept 2020
Amount
1) Strengthening of Narasinganallur Theen Nagar Road km (0/0 - 1/200) in Manur Panchayat (R96)
Picking the existing surface to 50mm to 100mm thick including labour and hire charges for picking tools and plants and all other incidental charges etc complete. Km 0/0 -1/200
Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete. Km 0/0 -1/200
Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for solling including hire charges for consolidation etc. complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0 -1/200
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. Km 0/0 -1/200
Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. Km 0/0 -1/200
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18 cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.6 kg of bitumen for 10 sqm of premix carpet including laying of seal coat type A over the premix carpet using 0.09 cum of 6.7 mm IRC size HBG machine crushed chips with 9.8 kg of 60/70 grade bitumen per 10 sqm including cost and conveyance of chips and stacking them to departmental gauge for premeasurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including spreading the same and finishing and compacting the same by vibrator rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and vibrator rolling seperately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for CMP vibrator roller 80-100 KN capacity and all incidental charges etc., complete. (Using Paver Finisher & Vibrator Roller) Km 0/0 -1/200
Provision for Hectametre stone of size 0.75mx0.23mx0.10m
Provision for Kilometre Stone
2) Strengthening and Black Topping to the road from Suthamalli - Kondanagaram Road km (0/0 - 1/800) in Manur Panchayat (R25)
Picking the existing surface to 50mm to 100mm thick including labour and hire charges for picking tools and plants and all other incidental charges etc complete. Km 0/0 -1/800
Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete. Km 0/0 -1/800
Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for solling including hire charges for consolidation etc. complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0 -1/800
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. Km 0/0 -1/800
Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. Km 0/0 -1/800
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18 cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.6 kg of bitumen for 10 sqm of premix carpet including laying of seal coat type A over the premix carpet using 0.09 cum of 6.7 mm IRC size HBG machine crushed chips with 9.8 kg of 60/70 grade bitumen per 10 sqm including cost and conveyance of chips and stacking them to departmental gauge for premeasurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including spreading the same and finishing and compacting the same by vibrator rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and vibrator rolling seperately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for CMP vibrator roller 80-100 KN capacity and all incidental charges etc., complete. (Using Paver Finisher & Vibrator Roller) Km 0/0 -1/800
Provision for Hectametre stone of size 0.75mx0.23mx0.10m
Provision for Kilometre Stone
Sub Estimate:- Construction of CC Road
Supplying and erection Steel Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete.,
Below & Above Sill Level
Cement concrete 1:2:4 mix using 20mm ISS HBGS metal laid in layers not more than 15cm thick inculding cost and coveyance of all materials to site, labour charges for mixing ,laying,compacting and curing etc complete.,
Supply and Fixing of Bitumen Pad including cost and conveyance of all materials to site and other charges etc complete.
3)Strengthening and Black Topping to the road from Karambai to Mathavakurichy Road in Manur Panchayat union Km 0/0 - 2/1 (VPR130)
Picking the existing surface to 50mm to 100mm thick including labour and hire charges for picking tools and plants and all other incidental charges etc complete. Km 0/0 - 2/100
Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete. Km 0/0 - 2/100
Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for solling including hire charges for consolidation etc. complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0 - 2/100
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. Km 0/0 - 2/100
Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. Km 0/0 - 2/100
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18 cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.6 kg of bitumen for 10 sqm of premix carpet including laying of seal coat type A over the premix carpet using 0.09 cum of 6.7 mm IRC size HBG machine crushed chips with 9.8 kg of 60/70 grade bitumen per 10 sqm including cost and conveyance of chips and stacking them to departmental gauge for premeasurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including spreading the same and finishing and compacting the same by vibrator rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and vibrator rolling seperately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for CMP vibrator roller 80-100 KN capacity and all incidental charges etc., complete. (Using Paver Finisher & Vibrator Roller) Km 0/0 - 2/100
Provision for Hectametre stone of size 0.75mx0.23mx0.10m
Provision for Kilometre stone
Sub Estimate: Construction of Pipe Culvert at km 0/200
Earthwork excavation in all clauses of Soils and Subsoils except hard rock requiring blasting including Shoring, Strutting and dressing the excavation upto sill level to maintain the foundation width as per the specifications SS 20B etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBGS metal laid in layers not more than 15cm thick inculding cost and coveyance of all materials to site, labour charges for mixing ,laying,compacting and curing etc complete., For Foundation - Base Concrete
Supplying and erection Steel Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete.,
Cement concrete 1:3:6 mix using 40mm ISS HBGS metal laid in layers not more than 15cm thick inculding cost and coveyance of all materials to site, labour charges for mixing ,laying,compacting and curing etc complete.,
Supply and fixing of 900mm dia RCC Humes Pipe NP3
Sub Estimate: Construction of Retaining Wall at km 0/0 - 2/100
Earthwork excavation in all clauses of Soils and Subsoils except hard rock requiring blasting including Shoring, Strutting and dressing the excavation upto sill level to maintain the foundation width as per the specifications SS 20B etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBGS metal laid in layers not more than 15cm thick inculding cost and coveyance of all materials to site, labour charges for mixing ,laying,compacting and curing etc complete., For Foundation - Base Concrete
Supplying and erection Steel Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete.,
Cement concrete 1:3:6 mix using 40mm ISS HBGS metal laid in layers not more than 15cm thick inculding cost and coveyance of all materials to site, labour charges for mixing ,laying,compacting and curing etc complete.,
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
MATHAN KUMAR V
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .