| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.7 LAccepted-AOC | ₹57.7 L | L1 | Accepted-AOC FIRST LOWEST |
| 2 | L2₹64.4 L+₹6.7 L (11.7%)Rejected-Finance | ₹64.4 L+₹6.7 L (11.7%) | L2 | Rejected-Finance SECOND LOWEST |
| 3 | L3₹65.3 L+₹7.6 L (13.2%)Rejected-Finance | ₹65.3 L+₹7.6 L (13.2%) | L3 | Rejected-Finance THIRD LOWEST |
| Sl No | Description | Qty | Unit | PRAGATI ASSOCIATES L2 | KISAAN EICHER TRACTORS L3 | M/S SHAMBHVI MAHAKAL CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in Dowla making and filling in ordinary soil excavation /filling to be in form of standard profile to be in 20 cm layers including ramming dressing the surface to the required levels and slops and also including 1.5 mtr lift and upto 30mtr lead incluiding borrowed earth from private land as directed by Engineer In Chrage. | 1,750 | cum | 80 ₹1,40,000 | 100 ₹1,75,000 | 70 ₹1,22,500 Lowest |
| 2.00 | Earth work in cutting and filling in ordinary soil excavation /filling to be in form of standard profile to be in 20 cm layers including ramming dressing the surface to the required levels and slops and also including 1.5 mtr lift and upto 200mtr lead incluiding borrowed earth from private land as directed by Engineer In Chrage. | 7,565.1 | cum | 156 ₹11,80,155.6 | 96 ₹7,26,249.6 | 70 ₹5,29,557 Lowest |
| 3.00 | Brick soling with straight overburnt bricks on edge including preparation of subgrade to required camberand including supply of bricks, filling joints with local earth spreading a blind coat of 1cm depth of local earthor sand over the entire surface and including labour, T&P etc. required for proper completion of work. | 10,500 | sqm | 458 ₹48,09,000 Lowest | 510 ₹53,55,000 | 480 ₹50,40,000 |
| 4.00 | Bricks edgeing on both side of the road of M150 bricks 8cm wide and 12cm deep laid with mud mortar including all labour and supply of bricks finished to the required templete & ramming the excavated earth as directed by engineer in charge | 2.8 | Km | 80,000 ₹2,24,000 | 72,000 ₹2,01,600 | 480 ₹1,344 Lowest |
| 5.00 | Painting with two coat of acrylic smooth exterior paint (Apex) over priming coat on Parapet Wall i/c all cost of material, labour, t&p etc complete | 112.98 | sqm | 152 ₹17,172.96 | 100 ₹11,298 Lowest | 120 ₹13,557.6 |
| 6.00 | RCC Cement concrete 1:1:2 in cement coarse Sand and Stone grit mixing as per directon of engineer in charge | 8.6 | cum | 8,200 ₹70,520 | 7,200 ₹61,920 | 7,000 ₹60,200 Lowest |
Tender Value
₹71.9 L
EMD Value
₹1.4 L
Closing Date
29 Jun 2026, 3:00 pmClosed
SE IWC MATHURA
SE IWC CIVIL LINE MATHURA
Construction of Kharanja and Pucca works on the left bank of Nagla Bel Minor in District Agra under Irrigation Division, Hathras.
2026_UPIDC_1158523_20
03/SE/2026-27
Open Tender
Civil Works
Item Wise
180 days
HATHRAS
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,663
₹1.4 L
17 Sept 2026
24 Jun 2026
29 Jun 2026
24 Jun 2026
29 Jun 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Dowla making and filling in ordinary soil excavation /filling to be in form of standard profile to be in 20 cm layers including ramming dressing the surface to the required levels and slops and also including 1.5 mtr lift and upto 30mtr lead incluiding borrowed earth from private land as directed by Engineer In Chrage. | 1,750 | cum | - | - |
| 2 | Earth work in cutting and filling in ordinary soil excavation /filling to be in form of standard profile to be in 20 cm layers including ramming dressing the surface to the required levels and slops and also including 1.5 mtr lift and upto 200mtr lead incluiding borrowed earth from private land as directed by Engineer In Chrage. | 7,565.1 | cum | - | - |
| 3 | Brick soling with straight overburnt bricks on edge including preparation of subgrade to required camberand including supply of bricks, filling joints with local earth spreading a blind coat of 1cm depth of local earthor sand over the entire surface and including labour, T&P etc. required for proper completion of work. | 10,500 | sqm | - | - |
| 4 | Bricks edgeing on both side of the road of M150 bricks 8cm wide and 12cm deep laid with mud mortar including all labour and supply of bricks finished to the required templete & ramming the excavated earth as directed by engineer in charge | 2.8 | Km | - | - |
| 5 | Painting with two coat of acrylic smooth exterior paint (Apex) over priming coat on Parapet Wall i/c all cost of material, labour, t&p etc complete | 112.98 | sqm | - | - |
| 6 | RCC Cement concrete 1:1:2 in cement coarse Sand and Stone grit mixing as per directon of engineer in charge | 8.6 | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.48 MB
su.pdf
Additional Documents • 0.02 MB
ALL.pdf
Tender Documents • 7.20 MB
BOQ_2180862.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .