Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAccepted-AOC DEVKHATIYA GHAZIPUR | GHAZIPUR | UTTAR PRADESH | 232325 | ₹5.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.2 Cr+₹11.5 L (2.26%)Rejected-Finance | ₹5.2 Cr+₹11.5 L (2.26%) | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹10.2 L
Closing Date
8 Jan 2021, 12:00 pmClosed
Superitending Engineer
Jnp-Gzp Circle Jaunpur
Widening and Strengtheing of Zamania Dewaitha Karmahari Road (ODR) Km 1,2,3,4,5,6(900)
2020_CEUVZ_540338_1
3524/SETENDER/JAU-GA CRICLE/2020
Open Tender
Civil Works - Roads
Item Rate
270 days
JAUNPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,590
₹10.2 L
Yes
JAUNPUR
13 Mar 2021
24 Dec 2020
8 Jan 2021
24 Dec 2020
8 Jan 2021
24 Dec 2020
24 Dec 2020
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (inclduing all T&P Labour Cess but excluding cost of GST )
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (inclduing all T&P Labour Cess but excluding cost of GST )
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 including cost of material T&P labour cess, etc. but Excluding cost of GST )
Providing, laying, spreading and compacting graded stone aggregate to Stabilised wet mix macadam (WMM) (s) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. including 1% cement and 3.50% bitumen emulsion. For Strengtheing including cost of material T&P labour cess, etc. but Excluding cost of GST )
Providing and applying tack coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.30 kg. Per sqm on the prepared the bituminious / granular surface cleaned with mechanical broom. including cost of material T&P labour cess, etc. but Excluding cost of GST )
Providing and laying bituminous concrete with 80-100 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects including cost of material T&P labour cess, etc. but Excluding cost of GST )
Earth work in partri in ordiny soil excavation to be in the from of regular pits not exceeding 1/2 meter (20") in depth and earth work in embankment to be in 20 cm (8") layers, including ramming and dressing the surface the required levels and slopes and also including 1.5m. (5ft.) lift and 30m(100") lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks withing 30m. (100') distance as directed by the E/I as per S.I.No-253 (inclduing all T&P Labour Cess but excluding cost of GST )
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation (inclduing all T&P Labour Cess but excluding cost of GST ) Construction of U Drain & Hume Pipe Culvert.
Plain cement concrete 1:3:6 (M-10) nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. including cost of material T&P labour cess, etc. but Excluding cost of GST ) ( Construction of U Drain & HP Culvert))
Plain/Reinforced Cement Concrete (M-20) in Open Foundation complete as per Drawing and Technical Specifications. including cost of material T&P labour cess, etc. but Excluding cost of GST ) Construction of U Drain)
Mild steel or iron in plain work such as in reinforced concreted or reinforced brick work (when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage. Bend hooks and authorized overlapping shall be measured as per S.I.No.504 including cost of material T&P labour cess, etc. but Excluding cost of GST ) ( Construction of U Drain)
M-150 brick in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and tools & plants, etc required for proper completion of the work. as per MORTH Specification. including cost of material T&P labour cess, etc. but Excluding cost of GST ) Construction of HP Culverts
Providing and laying 600 mm dia NP-3 H.P. jointing with coller in proper position including cost of cemment, jute etc required for proper completion of work. But excluding cost of coller. including cost of material T&P labour cess, etc. but Excluding cost of GST ) Construction of 600 mm HP Culverts
Providing and laying 350 mm dia NP-3 H.P. jointing with coller in proper position including cost of cemment, jute etc required for proper completion of work. But excluding cost of coller. including cost of material T&P labour cess, etc. but Excluding cost of GST ) Construction of HP Culverts
Struck pointing with cement mortar consisting of 1 part cement and 2 parts of fine sand of 1.25 fineness modulous including supply of all materials, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. including cost of material T&P labour cess, etc. but Excluding cost of GST ) Construction of HP Culverts
The routine maintenance of road Zamania Devetha Karmahari Km 1,2,3,4,5,6(900) including pavement, road sides and cross drains to the required standards and in the manner as defined in CV Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after four years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 1st Year maintenance Charge
For 2nd Year maintenance Charge
For 3rd Year maintenance Charge
For 4th Year maintenance Charge
For 5th Year maintenance Charge
M/s PAWANSUT CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .