Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 7 JASWANT NIWAS NAGBANI MACHHLIAN NAGBANI NAGABANI JAMMU JAMMU KASHMIR 181206 | JAMMU | JAMMU AND KASHMIR | 181206 | Admitted-Finance |
| 4 | Admitted-Finance CB HEIGHT SARJU BAGH BILASPUR CHHATTISGARH 495001 | BILASPUR | CHHATTISGARH | 495001 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹68,000
Closing Date
25 Jul 2022, 6:00 pmClosed
Executive Engineer Jal Shakti (M) G.W.D. Division
Executive Engineer Jal Shakti (M) G.W.D. Division
Re-development and Stabilization of Tubewells
2022_PHE_175071_1
e-NIT NO. GWD/47 of 2022-23
Open Tender
Repair and Maintenance Works
Item Rate
160 days
08 Nos Locations in District Samba and Kathua
As per SBD
6 documents required · 6 mandatory
₹1,000
Executive Engineer Jal Shakti (M) G.W.D. Division
₹68,000
Office of the Executive Engineer Jal Shakti (M) GW
23 Aug 2022
20 Jun 2022
27 Jul 2022
20 Jun 2022
25 Jul 2022
30 Jun 2022
29 Jun 2022
Amount
Re-development and Stabilization of Tubewell at Kharah in District Samba under UT Capex Budget 2022-23.
Re-development of tubewell. The job includes shifting of air compressor to site of work along with all accessories. Clearance of site in and around the complex, cutting, leveling and dressing of grounds for erection of tents and stacking of material after unloading. Deployment of air compressor & lowering of air line along with column pipes & re-development of tubewell by clearing all the strainers starting from bail plug to top and again from top to bail plug till the availability of sand free water. The job also includes cost of material such as jointing material nuts and bolts, POL etc. Complete job in all respects.
Stabilization and yield testing of tubewell by using V.T. Pump / submersible pump of adequate capacity as per specification till yield of well and draw down of the tubewell is ascertained and till clearance of the sand free water and its discharge at appropriate head. Complete job includes providing of POL, tools and tackles, flange jointing material, loading / unloading of materials, tool and tackles and other allied material with V.T. Pump set /Submersible pump and stacking properly at tubewell site etc. The job includes cost of all types of material and labour charges.
Description of Work / Item(s)
Amount
Re-development and Stabilization of Tubewell at Kharote Dhrallan in District Kathua under UT Capex Budget 2022-23
Re-development of tubewell. The job includes shifting of air compressor to site of work along with all accessories. Clearance of site in and around the complex, cutting, leveling and dressing of grounds for erection of tents and stacking of material after unloading. Deployment of air compressor & lowering of air line along with column pipes & re-development of tubewell by clearing all the strainers starting from bail plug to top and again from top to bail plug till the availability of sand free water. The job also includes cost of material such as jointing material nuts and bolts, POL etc. Complete job in all respects.
Stabilization and yield testing of tubewell by using V.T. Pump / submersible pump of adequate capacity as per specification till yield of well and draw down of the tubewell is ascertained and till clearance of the sand free water and its discharge at appropriate head. Complete job includes providing of POL, tools and tackles, flange jointing material, loading / unloading of materials, tool and tackles and other allied material with V.T. Pump set /Submersible pump and stacking properly at tubewell site etc. The job includes cost of all types of material and labour charges.
Description of Work / Item(s)
Amount
Re-development and Stabilization of Tubewell at Mearth Old in District Kathua under UT Capex Budget 2022-23
Re-development of tubewell. The job includes shifting of air compressor to site of work along with all accessories. Clearance of site in and around the complex, cutting, leveling and dressing of grounds for erection of tents and stacking of material after unloading. Deployment of air compressor & lowering of air line along with column pipes & re-development of tubewell by clearing all the strainers starting from bail plug to top and again from top to bail plug till the availability of sand free water. The job also includes cost of material such as jointing material nuts and bolts, POL etc. Complete job in all respects.
Stabilization and yield testing of tubewell by using V.T. Pump / submersible pump of adequate capacity as per specification till yield of well and draw down of the tubewell is ascertained and till clearance of the sand free water and its discharge at appropriate head. Complete job includes providing of POL, tools and tackles, flange jointing material, loading / unloading of materials, tool and tackles and other allied material with V.T. Pump set /Submersible pump and stacking properly at tubewell site etc. The job includes cost of all types of material and labour charges.
Description of Work / Item(s)
Amount
Re-development and Stabilization of Tubewell at Logate New in District Kathua under UT Capex Budget 2022-23
Re-development of tubewell. The job includes shifting of air compressor to site of work along with all accessories. Clearance of site in and around the complex, cutting, leveling and dressing of grounds for erection of tents and stacking of material after unloading. Deployment of air compressor & lowering of air line along with column pipes & re-development of tubewell by clearing all the strainers starting from bail plug to top and again from top to bail plug till the availability of sand free water. The job also includes cost of material such as jointing material nuts and bolts, POL etc. Complete job in all respects.
Stabilization and yield testing of tubewell by using V.T. Pump / submersible pump of adequate capacity as per specification till yield of well and draw down of the tubewell is ascertained and till clearance of the sand free water and its discharge at appropriate head. Complete job includes providing of POL, tools and tackles, flange jointing material, loading / unloading of materials, tool and tackles and other allied material with V.T. Pump set /Submersible pump and stacking properly at tubewell site etc. The job includes cost of all types of material and labour charges.
Description of Work / Item(s)
Amount
Re-development and Stabilization of Tubewell at Lower Mela in District Kathua under UT Capex Budget 2022-23
Re-development of tubewell. The job includes shifting of air compressor to site of work along with all accessories. Clearance of site in and around the complex, cutting, leveling and dressing of grounds for erection of tents and stacking of material after unloading. Deployment of air compressor & lowering of air line along with column pipes & re-development of tubewell by clearing all the strainers starting from bail plug to top and again from top to bail plug till the availability of sand free water. The job also includes cost of material such as jointing material nuts and bolts, POL etc. Complete job in all respects.
Stabilization and yield testing of tubewell by using V.T. Pump / submersible pump of adequate capacity as per specification till yield of well and draw down of the tubewell is ascertained and till clearance of the sand free water and its discharge at appropriate head. Complete job includes providing of POL, tools and tackles, flange jointing material, loading / unloading of materials, tool and tackles and other allied material with V.T. Pump set /Submersible pump and stacking properly at tubewell site etc. The job includes cost of all types of material and labour charges.
Description of Work / Item(s)
Amount
Re-development and Stabilization of Tubewell at Trindian in District Samba under UT Capex Budget 2022-23
Re-development of tubewell. The job includes shifting of air compressor to site of work along with all accessories. Clearance of site in and around the complex, cutting, leveling and dressing of grounds for erection of tents and stacking of material after unloading. Deployment of air compressor & lowering of air line along with column pipes & re-development of tubewell by clearing all the strainers starting from bail plug to top and again from top to bail plug till the availability of sand free water. The job also includes cost of material such as jointing material nuts and bolts, POL etc. Complete job in all respects.
Stabilization and yield testing of tubewell by using V.T. Pump / submersible pump of adequate capacity as per specification till yield of well and draw down of the tubewell is ascertained and till clearance of the sand free water and its discharge at appropriate head. Complete job includes providing of POL, tools and tackles, flange jointing material, loading / unloading of materials, tool and tackles and other allied material with V.T. Pump set /Submersible pump and stacking properly at tubewell site etc. The job includes cost of all types of material and labour charges.
Description of Work / Item(s)
Amount
Re-development and Stabilization of Tubewell at Gurgi in District Samba under UT Capex Budget 2022-23
Re-development of tubewell. The job includes shifting of air compressor to site of work along with all accessories. Clearance of site in and around the complex, cutting, leveling and dressing of grounds for erection of tents and stacking of material after unloading. Deployment of air compressor & lowering of air line along with column pipes & re-development of tubewell by clearing all the strainers starting from bail plug to top and again from top to bail plug till the availability of sand free water. The job also includes cost of material such as jointing material nuts and bolts, POL etc. Complete job in all respects.
Stabilization and yield testing of tubewell by using V.T. Pump / submersible pump of adequate capacity as per specification till yield of well and draw down of the tubewell is ascertained and till clearance of the sand free water and its discharge at appropriate head. Complete job includes providing of POL, tools and tackles, flange jointing material, loading / unloading of materials, tool and tackles and other allied material with V.T. Pump set /Submersible pump and stacking properly at tubewell site etc. The job includes cost of all types of material and labour charges.
Description of Work / Item(s)
Amount
Re-development and Stabilization of Tubewell at Dolian in District Samba under UT Capex Budget 2022-23
Re-development of tubewell. The job includes shifting of air compressor to site of work along with all accessories. Clearance of site in and around the complex, cutting, leveling and dressing of grounds for erection of tents and stacking of material after unloading. Deployment of air compressor & lowering of air line along with column pipes & re-development of tubewell by clearing all the strainers starting from bail plug to top and again from top to bail plug till the availability of sand free water. The job also includes cost of material such as jointing material nuts and bolts, POL etc. Complete job in all respects.
Stabilization and yield testing of tubewell by using V.T. Pump / submersible pump of adequate capacity as per specification till yield of well and draw down of the tubewell is ascertained and till clearance of the sand free water and its discharge at appropriate head. Complete job includes providing of POL, tools and tackles, flange jointing material, loading / unloading of materials, tool and tackles and other allied material with V.T. Pump set /Submersible pump and stacking properly at tubewell site etc. The job includes cost of all types of material and labour charges.
M/S SAKSHAM ELECTRICAL AND MECHNICAL ENGINEERS
SUNIL STEEL INDUSTRY
PALLAVI ASSOCIATES
M/S SAKSHAM ELECTRICAL AND MECHNICAL ENGINEERS
SUNIL STEEL INDUSTRY
PALLAVI ASSOCIATES
M/S SAKSHAM ELECTRICAL AND MECHNICAL ENGINEERS
SUNIL STEEL INDUSTRY
PALLAVI ASSOCIATES
M/S SAKSHAM ELECTRICAL AND MECHNICAL ENGINEERS
SUNIL STEEL INDUSTRY
PALLAVI ASSOCIATES
M/S SAKSHAM ELECTRICAL AND MECHNICAL ENGINEERS
SUNIL STEEL INDUSTRY
PALLAVI ASSOCIATES
M/S SAKSHAM ELECTRICAL AND MECHNICAL ENGINEERS
SUNIL STEEL INDUSTRY
PALLAVI ASSOCIATES
M/S SAKSHAM ELECTRICAL AND MECHNICAL ENGINEERS
SUNIL STEEL INDUSTRY
PALLAVI ASSOCIATES
M/S SAKSHAM ELECTRICAL AND MECHNICAL ENGINEERS
SUNIL STEEL INDUSTRY
PALLAVI ASSOCIATES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .