Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr Quoted ₹1.8 Cr | L1 | Accepted-AOC TEC unanimously recommended to award tender to L1 bidder m/s Cee kay EPC Project pvt ltd. |
| 2 | L2₹1.9 Cr+₹9.9 L (5.52%)Rejected-Finance | ₹1.9 Cr+₹9.9 L (5.52%) | L2 | Rejected-Finance Details mentioned in TEC report attached along |
| 3 | L3₹2.0 Cr+₹15.6 L (8.68%)Rejected-Finance | ₹2.0 Cr+₹15.6 L (8.68%) | L3 | Rejected-Finance Details mentioned in TEC report attached along |
| 4 | L4₹2.2 Cr+₹44.0 L (24.5%)Rejected-Finance | ₹2.2 Cr+₹44.0 L (24.5%) | L4 | Rejected-Finance Details mentioned in TEC report attached along |
| 5 | L5₹2.7 Cr+₹94.1 L (52.3%)Rejected-Finance 2ND FLOOR 45 A MAA SHARDA NAGAR KABIT KHEDI INDORE NEAR BHRAT PUBLIC SCHOOL MR 10 SQUARE INDORE MADHYA PRADESH 452010 | INDORE | MADHYA PRADESH | 452010 | ₹2.7 Cr+₹94.1 L (52.3%) | L5 | Rejected-Finance Details mentioned in TEC report attached along |
Tender Value
₹2.3 Cr
EMD Value
₹4.5 L
Closing Date
1 Jan 2025, 4:00 pmClosed
AGM (MM)
O/o CGMT BSNL HP, Kasumpti, Shimla
Comprehensive construction of 47.6Km ADSS OFC, including Supply installation of related ADSS OF Cable accessories, supply and erection of tubular poles along with associated accessories, slinging of ADSS Cable, testing and commissioning.
2024_BSNL_218944_1
HPCO-23/11/15/2024-CFA-HPCO
Open Tender
OFC Laying Works
Works
1095 days
Dharamshala and Mandi areas
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
Yes
AO(Claim), O/o CGMT, BSNL HP,
₹4.5 L
Yes
29 Jul 2025
12 Dec 2024
3 Jan 2025
12 Dec 2024
1 Jan 2025
12 Dec 2024
12 Dec 2024 - 21 Dec 2024
Amount
Material Required
Galvanized steel poles of tubular in design and swaged of the length 7 meters, with top cap welded and lightning spike and including MUFF @ 20 per Kms.
Galvanized steel poles of tubular in design and swaged of the length 8 meters, with top cap welded and lightning spike and including MUFF @ 5 per Kms.
Stay arrangement for 7M/8M steel poles of Galvanised Steel
Formed OFC Dead End and Termination Fittings including all supporting items.(@ 7/Km)
OFC suspension fittings including all supporting items.(@ 18/Km)
Adjustable Cable Storage Bracket.(@ 5/Km)
SERVICES REQUIRED
Erection of 7 m / 8m poles including excavation, fixing of MUFF, concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. and sign writing on poles with paint
Slinging / Laying of ADSS / AOF including fixing of installation accessories and fixtures etc. splicing & jointing of OF cable, Link Testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed cost towards collection of ADSS Cable / AOF Cable from BSNL’s Store Depot.
Construction of Joint Chamber as per EI supply & fixing of G.I. Pipe & PLB pipe for bringing down the of cable, supply of stone slab for covering the chamber and sand for filling the chamber
Installation of FDF and WSC/FTB, leading-in arrangement, jointing of pigtails and other related activity for construction of ADSS/Aerial OFC routes
R.K GUPTA AND CO. (BID ID -800183)
ALHADIN CONSTRUCTION (BID ID -798308)
ASHOK KUMAR GARG CONTRACTOR (BID ID -798231)
S KUMAR CREATION PRIVATE LIMITED (BID ID -797621)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .