Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹92.4 LAccepted-AOC | ₹92.4 L | L1 | Accepted-AOC Accepted as Techno Commercially evaluated L1 Bidder |
| 2 | L2₹92.5 L+₹5,380.51 (0.06%)Rejected-Finance | ₹92.5 L+₹5,380.51 (0.06%) | L2 | Rejected-Finance Rejected as not L1 bidder |
| 3 | L3₹92.8 L+₹35,486.66 (0.38%)Rejected-Finance 496665 | RAIGARH | CHHATTISGARH | 496665 | ₹92.8 L+₹35,486.66 (0.38%) | L3 | Rejected-Finance Rejected as not L1 bidder |
| Sl No | Description | Qty | Unit | SANTOSH KUMAR SINGH L3 | BINOD KUMAR SAHU L1 | M/s Anjali Construction L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation of coal/shale in UG mine by chiseling in trenches and drains for making notches in gallery including stacking of serviceable material and unserviceable material with a lead up to 30mt.and lift up to 1.5mt. Including neat dressing of the roof floor and sides as per the instruction of the E.I.C. | 161.4 | m3 | 8,985 ₹14,50,179 Lowest | 9,600 ₹15,49,440 | 9,599.86 ₹15,49,417.85 |
| 2.00 | Brick work 1:6 in foundation and plinth in class designation 50 bricks excluding carriage of material from incline mouth to the U/G mine site.Foundation | 56.3 | m3 | 8,860 ₹4,98,818 Lowest | 9,330 ₹5,25,279 | 9,313.11 ₹5,24,328.14 |
| 3.00 | Brick work in super structure, above plinth level up to floor-2 level | 228.03 | m3 | 9,950 ₹22,68,898.5 Lowest | 10,600 ₹24,17,118 | 10,627.39 ₹24,23,363.09 |
| 4.00 | Transporation(Track line lead =1-2 km, Manual lead = 0-50 mt.) | 284.33 | m3 | 11,925 ₹33,90,635.25 | 10,896 ₹30,98,059.68 Lowest | 10,896.67 ₹30,98,251.28 |
| 5.00 | 12mm thick cement plaster 1:6 (1cement : 6 coarse sand) excluding carriage of materials from Incline mouth to the U/G mine site. | 252.33 | m2 | 552 ₹1,39,286.16 | 530 ₹1,33,734.9 Lowest | 530.38 ₹1,33,831.95 |
| 6.00 | Transporation(Track line lead =1-2 km, Manual lead = 0-50 mt.) | 252.33 | m2 | 196 ₹49,456.68 | 187 ₹47,185.71 | 184.17 ₹46,471.14 Lowest |
| 7.00 | Applying white wash, one coat to give an even shade in U/G mine excluding carriage from incline mouth to U/G site. | 1,006.18 | m2 | 26 ₹26,160.68 | 20 ₹20,123.6 | 19.71 ₹19,827.28 Lowest |
| 8.00 | Transporation(Track line lead =1-2 km, Manual lead = 0-50 mt.) | 0.14 | MT | 9,550 ₹1,337 Lowest | 10,321 ₹1,444.94 | 10,321.38 ₹1,444.99 |
| 9.00 | Carting of coal/shale/shaly coal in U/G mine by manual loading, unloading and stacking for lead up to 50 M | 40.8 | m3 | 890 ₹36,312 Lowest | 960 ₹39,168 | 960 ₹39,168.06 |
| 10.00 | Neat cement punning work on Isolation stoppings for smooth finishing and stopping leakages. | 8 | m2 | 132 ₹1,056 | 124 ₹992 Lowest | 124.08 ₹992.67 |
Tender Value
₹85.1 L
EMD Value
₹1.1 L
Closing Date
3 Nov 2025, 5:00 pmClosed
Staff Officer (Mining), Orient Area, MCL
Office of the General Manager, Orient Area, MCL, BrajrajnagarJharsuguda, Odisha
Underground construction of 08 nos of Sectionalisation Stoppings (Bricks) in 43LN Panel (Sec-C) at HBM of RSA, OA, MCL
2025_MCL_346283_1
MCL/GM/OA/SOM/25/NIT276/1907
Open Tender
Civil Works - Others
Item Rate
240 days
Hirakhand Bundia Mine, Orient Area
Please refer Tender Documents
5 documents required · 5 mandatory
₹1.1 L
22 Nov 2025
27 Oct 2025
4 Nov 2025
28 Oct 2025
3 Nov 2025
28 Oct 2025
28 Oct 2025 - 31 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Document
1.46 MB
Document
2.26 MB
BOQ
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .