| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 CrAdmitted-Finance | -26.00% | ₹4.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.8 CrAdmitted-Finance 560 SADAR BAZAR JHANSI UTTAR PRADESH 284001 UDYAM UP 39 0009380 09AACFT8755H1ZP R M | JHANSI | UTTAR PRADESH | 284001 | -13.10% | ₹5.8 Cr | L2 | Admitted-Finance |
| 3 | L3₹6.0 CrAdmitted-Finance | -10.78% | ₹6.0 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Documents Incomplete as per checklist |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Documents Incomplete as per checklist |
Tender Value
₹6.7 Cr
EMD Value
₹13.3 L
Closing Date
15 Apr 2026, 10:30 amClosed
Superintending Engineer, Electrical Circle, UPAVP,
Office of the Superintending Engineer, Electrical Circle, UPAVP, Vrindavan Yojna, LKO
Construction of 33 KV Line from 132/33 KV Substation to Proposed 33/11 KV Substation at Sector-9 and Interlinked to Sector-5 33/11 KV Substation Avadh Vihar Yojna Lucknow.
2026_UPHDB_1127571_1
204/M-6 ED-I/40 Dated 12.03.2026
Open Tender
Electrical Works
90 days
Avadh Vihar Yojna Lucknow
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,850
Executive Engineer, ED-I, U.P.A.V.P., Lucknow
₹13.3 L
27 Apr 2026
20 Mar 2026
15 Apr 2026
20 Mar 2026
15 Apr 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Supply & Erection of 33 KV section Double Pole Structure (Riser) 11 Mtr. Long SP-55 Type S.T. Pole (Bottom Portion Galvanised) made of following types of supports duly grouted 1:4:8 (1cement,4 coarse sand and 8 brick ballast 40mm size) Plinthed plastered and painted in the same manner as already specified for respective supports with 02 Nos. MS channels of size 125x65mm, 01 No. 100x50m Size and 65x65x6 mm angle iron bracing fixed with MS clamp of size 75 x10 mm & 03 Nos. Pin Insulator etc. complete with all material labour and T&P etc. required for proper completion of work as per direction of E/I. Make:- (Only manufacturers whose GTP will be Approved in MVVNL) | 8 | Nos. | - | - | BI01010001010000000000000515BI0100001113 |
Supply of following size H.T. cable standered compacted circular Al. conductor screen with extruded semi conducting compound, XLPE insulated in copper Tape, cores laid up to innersheath of PVC, Galvanised Steel Strip Armoured & overall sheathed cable confirming to IS 7098 (Part-2) 2011 with upto date Ammendments complete in all respect as per Direction of E/I. Make (Polycab/ Gloster/KEI/ Universal / Finolex/ Havells) | - | - | - | - | BI01010001010000000000000515BI0100001118 | |
| 2.01 | 300 Sqmm 3 core | 8,780 | RM | - | - | BI01010001010000000000000515BI0100001122 |
| 3S/F and jointing of Indoor/outdoor 33 KV jointing kit (Heat Sink) per XLPE cable including cost of all material Labour and T & P as per proper completion of work as per direction of E/I. Make (Raychem/3M) | ||||||
| 3.01 | 240-300 Sqmm 3core Indoor type as per DSR 2022 SI No. 10.7.3 | 6 | Nos. | - | - | BI01010001010000000000000515BI0100001124 |
| 3.02 | 240-300 Sqmm 3core Outdoor type as per DSR 2022 SI No. 10.8.3 | 32 | Nos. | - | - | BI01010001010000000000000515BI0100001125 |
| 4S/F of G.I. Pipe of following sizes for cable duly clamped with supports by 2 No. with clamps of 50 x 6 mm M.S. flats bolts, Nuts and washer required for proper completion of work. Make (TATA/SAIL/JINDAL) | ||||||
| 4.01 | 150 mm dia (18.20 Kg/M) | 96 | RM | - | - | BI01010001010000000000000515BI0100001118 |
| 5 | Supply of HDPE pipe upto PN-6 working pressure Rating material Grade PE-80 Nominal dia (OD) 160 mm 9.50 mm thickness complete in all respect as per relevants I.S. Technicals specification. | 8,000 | RM | - | - | BI01010001010000000000000515BI0100001122 |
| 6 | Drilling of Road Parallely & Road Crossing at a depth of 2 to 3 Mtr. as required & laying charges of cable & 160mm Dia HDPE Pipe complete with all material, labour, Drilling machine & required T&P etc. required for proper completion of work as per Direction of E/I. | 8,000 | RM | - | - | BI01010001010000000000000515BI0100001123 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.68 MB
biddocument33kv.pdf
Tender Documents • 17.74 MB
BOQ_2103104.xls
BOQ • 0.31 MB