Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28 LAccepted-AOC | ₹28 L | L1 | Accepted-AOC Being lowest. |
| 2 | L2₹34.8 L+₹6.8 L (24.2%)Rejected-Finance OODLABARI P O MANABARI DIST JALPAIGURI WB PIN 735222 STATE WEST BENGAL | JALPAIGURI | WEST BENGAL | 735222 | ₹34.8 L+₹6.8 L (24.2%) | L2 | Rejected-Finance Not lowest |
| 3 | L3₹36.5 L+₹8.5 L (30.3%)Rejected-Finance | ₹36.5 L+₹8.5 L (30.3%) | L3 | Rejected-Finance Not lowest |
| Sl No | Description | Qty | Unit | M/S JANARDAN SHARMA AND SONS L3 | PUSHPA CONSTRUCTION L1 | AJOY DEY L2 |
|---|---|---|---|---|---|---|
| 1.00BUILDINGS & STRUCTURE (Sch 'A' PART-I) | ||||||
| 1.01 | Lump sum price worked out by the Contractor for “BUILDINGS & STRUCTURE” as listed in Schedule ‘A’ Part-I.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 30,75,000.00 inserted by the MES in Schedule ‘A’ Part-I. | 1 | LUMP SUM | 27,50,000 ₹27,50,000 | 20,63,575 ₹20,63,575 Lowest | 25,21,500 ₹25,21,500 |
| 2.00EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT (Sch 'A' PART-II) | ||||||
| 2.01 | Lump sum price worked out by the Contractor for “EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT” as listed in Schedule ‘A’ Part-II.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 1,12,724.43 inserted by the MES in Schedule ‘A’ Part-II. | 1 | LUMP SUM | 90,179 ₹90,179 | 55,750 ₹55,750 Lowest | 1,05,500 ₹1,05,500 |
| 3.00INTERNAL WATER SUPPLY (Sch 'A' PART-III) | ||||||
| 3.01 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part-III.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 21,082.23 inserted by the MES in Schedule ‘A’ Part-III. | 1 | LUMP SUM | 20,000 ₹20,000 | 14,250 ₹14,250 Lowest | 18,500 ₹18,500 |
| 4.00INTERNAL ELECTRIFICATION (Sch 'A' PART-IV) | ||||||
| 4.01 | Lump sum price worked out by the Contractor for “(INTERNAL ELECTRIFICATION)” as listed in Schedule ‘A’ Part-IV.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 1,96,531.39 inserted by the MES in Schedule ‘A’ Part-IV. | 1 | LUMP SUM | 1,50,000 ₹1,50,000 | 1,11,500 ₹1,11,500 Lowest | 1,71,300 ₹1,71,300 |
| 5.00ROAD, PATH & HARDSTANDING (Sch 'A' PART-V) | ||||||
| 5.01 | Lump sum price worked out by the Contractor for “(ROAD, PATH & HARDSTANDING)” as listed in Schedule ‘A’ Part-V.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 2,87,526.63 inserted by the MES in Schedule ‘A’ Part-V. | 1 | LUMP SUM | 2,10,000 ₹2,10,000 | 1,90,000 ₹1,90,000 Lowest | 2,51,000 ₹2,51,000 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
7 Aug 2026, 6:00 pmClosed
GE SEVOKE ROAD
GE Sevoke Road Post Salugara Dist Jalpaiguri PIN 734008
PROVN OF GUARD REST ROOM AT BAGRAKOTE MIL STATION
2026_MES_777879_1
8646/SEV OF 2026-27
Open Tender
Civil Works
Lump-sum
270 days
GE SEVOKE ROAD
As per Tender Documents
9 documents required · 9 mandatory
₹500
GE SEVOKE ROAD
₹80,000
18 Sept 2026
11 Jul 2026
10 Aug 2026
11 Jul 2026
7 Aug 2026
25 Jul 2026
12 Jul 2026 - 21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BUILDINGS & STRUCTURE (Sch 'A' PART-I) | |||||
| 1.01 | Lump sum price worked out by the Contractor for “BUILDINGS & STRUCTURE” as listed in Schedule ‘A’ Part-I.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 30,75,000.00 inserted by the MES in Schedule ‘A’ Part-I. | 1 | LUMP SUM | 30,75,000 | ₹30,75,000 |
| 2EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT (Sch 'A' PART-II) | |||||
| 2.01 | Lump sum price worked out by the Contractor for “EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT” as listed in Schedule ‘A’ Part-II.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 1,12,724.43 inserted by the MES in Schedule ‘A’ Part-II. | 1 | LUMP SUM | 1,12,724.43 | ₹1,12,724.43 |
| 3INTERNAL WATER SUPPLY (Sch 'A' PART-III) | |||||
| 3.01 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part-III.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 21,082.23 inserted by the MES in Schedule ‘A’ Part-III. | 1 | LUMP SUM | 21,082.23 | ₹21,082.23 |
| 4INTERNAL ELECTRIFICATION (Sch 'A' PART-IV) | |||||
| 4.01 | Lump sum price worked out by the Contractor for “(INTERNAL ELECTRIFICATION)” as listed in Schedule ‘A’ Part-IV.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 1,96,531.39 inserted by the MES in Schedule ‘A’ Part-IV. | 1 | LUMP SUM | 1,96,531.39 | ₹1,96,531.39 |
| 5ROAD, PATH & HARDSTANDING (Sch 'A' PART-V) | |||||
| 5.01 | Lump sum price worked out by the Contractor for “(ROAD, PATH & HARDSTANDING)” as listed in Schedule ‘A’ Part-V.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 2,87,526.63 inserted by the MES in Schedule ‘A’ Part-V. | 1 | LUMP SUM | 2,87,526.63 | ₹2,87,526.63 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_871198.xls
BOQ • 0.29 MB
Tender_Documents_Pdf_8646_10_PS.pdf
Tender Documents • 1.06 MB
Tender_Documents_Pdf_8646_11.1_Appx_A_of_PS.pdf
Tender Documents • 0.06 MB
Tender_Documents_Pdf_8646_11.2_Appx_B_Mk_Jul26_Pg167_to_176.pdf
Tender Documents • 0.09 MB
Tender_Documents_Pdf_8646_11.4_Appx_D_and_E_PS_Cement_and_Steel_Register.pdf
Tender Documents • 0.33 MB
Tender_Documents_Pdf_8646_12_Yard_Stick.pdf
Tender Documents • 0.24 MB
Tender_Documents_Pdf_8646_13_List of drawings_8646.pdf
Tender Documents • 0.07 MB
Tender_Documents_Pdf_8646_1_Index.pdf
Tender Documents • 0.05 MB
Tender_Documents_Pdf_8646_2_Tender_Fwd_and_instructions.pdf
Tender Documents • 0.23 MB
Tender_Documents_Pdf_8646_3.1_Notice_of_Tender.pdf
Tender Documents • 0.34 MB
Tender_Documents_Pdf_8646_4.1_Authorization_and_Sch_A_Note.pdf
Tender Documents • 0.27 MB
Tender_Documents_Pdf_8646_4.2_Sch_A_Parts1to10.pdf
Tender Documents • 0.37 MB
Tender_Documents_Pdf_8646_4.5_Sch_B_and_C_and_D.pdf
Tender Documents • 0.03 MB
Tender_Documents_Pdf_8646_5_Tender_page_and_Acceptance.pdf
Tender Documents • 0.24 MB
Tender_Documents_Pdf_8646_6_GENERAL_CONDITIONS_OF_CONTRACTS_PAGE_NO.pdf
Tender Documents • 0.09 MB
Tender_Documents_Pdf_8646_7_Errata_Amendment_(2249).pdf
Tender Documents • 0.53 MB
Tender_Documents_Pdf_8646_8_SCHEDULE_OF_MINIMUM_FAIR_WAGES_PAGE.pdf
Tender Documents • 0.17 MB
Tender_Documents_Pdf_8646_9_Spl_condition.pdf
Tender Documents • 0.55 MB
Drawings_Att Toilet.pdf
Additional Documents • 0.13 MB
Drawings_GUARD ROOM.pdf
Additional Documents • 0.25 MB
Drawings_Toilet Block.pdf
Additional Documents • 0.22 MB
Drawing8646Merged.pdf
PDF • 3.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .