| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 CrAccepted-AOC E 13 NIRBHAY NAGAR GALLANA ROAD AGRA | AGRA | ₹13.7 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹13.7 CrRejected-AOC G 17 RAMGHAT ROAD GYAN SAROVAR COLONY ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹13.7 Cr | L2 | Rejected-AOC Rejected |
| 3 | l3₹14.1 CrRejected-AOC 7 C GOVIND NAGAR MATHURA | MATHURA | MATHURA | UTTAR PRADESH | ₹14.1 Cr | l3 | Rejected-AOC Rejected |
| 4 | l4₹15.5 CrRejected-AOC SURYA FACTORY SORAN ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹15.5 Cr | l4 | Rejected-AOC Rejected |
Tender Value
₹22.6 Cr
EMD Value
₹33.8 L
Closing Date
10 Mar 2025, 12:00 pmClosed
Superintending Engineer Aligarh Circle PWD Aligarh
Office of The SE, Aligarh Circle, P.W.D., Aligarh
Widening and Strengthening of Gopi-Bhilawali Road (O.D.R.)
2025_CEALG_1013103_1
289/Cashier(C.D.-1 A.)-A.C./24-25 Date 13-01-2025
Open Tender
Civil Works - Roads
455 days
Aligarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹33.8 L
Office of The SE, Aligarh Circle, P.W.D., Aligarh
9 Apr 2025
3 Mar 2025
10 Mar 2025
3 Mar 2025
10 Mar 2025
3 Mar 2025
7 Mar 2025
Amount
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. As per Morth Specification No.305 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead.. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.(Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MORTH Specification clause-406 (B) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. (G-3) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing , laying, spreading and compacting graded stone aggregate to wet mix macadam(Stablised with 1% Cement & 3.5% Bitumen Emulsion ) specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MORTH Specification clause-406 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) , As per Direction by E/I.
Providing and applying tack coat with bitumen VG 10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with Air Compressor. as morth specification no 503. (Including Cost of Bitumen VG-10) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In charge upto a distance of 30m from the foundation trenches by Hydraulic excavator/manual means. Ch-4, S.I. 251 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Coarse sand : 8 graded stone aggregate 40 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work. Ch-5, S.I. 275(a) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level : a) 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Ch-5, S.I. 6 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Supplying, fitting, and placing HYSD bar reinforcement in Foundation complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 (For Drain) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Providing and laying of 40 mm gauge B/B under Hume pipe culvert foundation in road work including all materials, labours, T&P etc. required for completion of the work. Ch-20 S.I. 18 (For H.P. Culvert) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation-100 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) as per SOR CH 6, SI 6.1.1 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Ruled Pointing on brick work with cement mortar 1:3 (1Cement : 3 Coarse Sand) as per SOR CH 13, SI 574(a) (For H.P. Culvert) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
12 mm cement plaster (1 cement : 4 Coarse sand) on brick work with cement mortar of mix (upto 10 mtr height from Ground level).as per SOR CH 13, SI 584(ii). (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Colour washing with lime on undecorated wall surfaces (Two coats) over & including a primary coat of white washing to give an even shade after thoroughly brooming the surface to remove all dirt, dust mortar drop and other foreign matters. as per SOR CH 16, SI 675. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Supply, laying & fixing of N.P.-3 Hume Pipe 350mm Dia. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Supply, laying & fixing of N.P.-3 Hume Pipe 600mm Dia. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface. Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35-2015 The finished surface to be level, uniform and free from streaks and holes. Ch-27, S.I. 2 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface. (Repeated/ Transverse bar) Providing and laying of hot applied thermoplastic compound 5 mm thickincluding reflectorising glass beads @ 500 gms per sqm area, thickness of 5 mm is exclusive of surface applied glass beads as per IRC:35-2015 The finishedsurface to be level, uniform and free from streaks and holes. Ch-27, S.I. 3 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I.
05 Year Maintenance Charge @ 2.50% Routine Maitenance of road for 05 Years after the competion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.) 1-1st Year @ Nill
2nd Year @ 0.25%
3rd Year @ 0.50%
4th Year @ 0.75%
5th Year @ 1.00%
M/S SHIVA ASSOCIATES (BID ID -5033598)
M/s R L A Constructions (BID ID -5022996)
M/s Hanu Infrastructure Pvt Ltd (BID ID -5024382)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid