Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Fee/PreQual/Technical/Finance | -31.00% | ₹1.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.2 L+₹5,555.65 (4.71%)Admitted-Fee/PreQual/Technical/Finance | -27.75% | ₹1.2 L+₹5,555.65 (4.71%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.3 L+₹12,188.25 (10.3%)Admitted-Fee/PreQual/Technical/Finance | -23.87% | ₹1.3 L+₹12,188.25 (10.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.8 L
EMD Value
₹3,540
Closing Date
27 Aug 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISON SMC REGAL LANE LAL CHOWK
Upgradation of lane in Sheeraz colony Abu Bakar Masjid Opposite Auqaf Building Upper Soura
2026_HAUDD_319334_7
NOTICE INVITING ETENDER No. 24 of 2026-2027 Dated 04.08.2026 RRWD SMC
Open Tender
Civil Works
Percentage
30 days
Sheeraz colony Abu Bakar Masjid Opposite Auqaf Bui
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹209
FA/CAO AC NO 0216010200000007
₹3,540
29 Aug 2026
4 Aug 2026
28 Aug 2026
5 Aug 2026
27 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Engagement of labourers for site clearance | 5 | No. | 553 | ₹2,765 |
| - | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil | 136.59 | Sqm | 24.12 | ₹3,294.55 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 Cement: 4 fine sand: 8 grade stone aggregate 40mm nominal size). | 8.53 | Cum | 5,202.9 | ₹44,380.74 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 13.73 | Cum | 6,591.25 | ₹90,497.86 |
| - | Raising of Manholes in Concrete Cement work including fixing of new Manhole covers Iron Trash Type with a coat of red oxide complete job | 3 | No. | 1,500 | ₹4,500 |
| - | Raising of Manholes in Concrete Cement work including fixing of new Manhole covers with a coat of red oxide complete job Polycrate Type | 5 | No. | 3,500 | ₹17,500 |
| - | Removal of Mulba/Unhygienic Material/Mud/unserviceable material from the site including its disposal beyond Municipal Limits by Mechanical Transport including all carriages, leads and Lifts complete job as directed at site. | 5 | Cum | 350 | ₹1,750 |
| - | Carriage of material by mechanical Transport.
Sand/Aggregates | 30.04 | Cum | 409.94 | ₹12,314.6 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_1057825.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .