| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.3 LAdmitted-Finance | -49.86% | ₹10.3 L | L1 | Admitted-Finance |
| 2 | L2₹11.2 L+₹89,525.06 (8.70%)Admitted-Finance | -45.50% | ₹11.2 L+₹89,525.06 (8.70%) | L2 | Admitted-Finance |
| 3 | L3₹13.9 L+₹3.6 L (34.8%)Admitted-Finance | -32.42% | ₹13.9 L+₹3.6 L (34.8%) | L3 | Admitted-Finance |
| 4 | L4₹16.0 L+₹5.7 L (55.6%)Admitted-Finance | -22.00% | ₹16.0 L+₹5.7 L (55.6%) | L4 | Admitted-Finance |
| 5 | L5₹16.7 L+₹6.4 L (61.8%)Admitted-Finance | -18.88% | ₹16.7 L+₹6.4 L (61.8%) | L5 | Admitted-Finance |
Tender Value
₹20.5 L
EMD Value
₹41,067
Closing Date
27 Aug 2026, 3:00 pmClosed
Executive Engineer
EE / HCD-2/DDA
Repairing of existing water pipeline wherever and whenever required in various DDA parks in Sarita vihar and Jasola
2026_DDA_922942_1
18/EE / HCD-2/DDA/2026-27
Open Tender
Civil Works
Percentage
365 days
As Per NIT
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹41,067
2 Sept 2026
20 Aug 2026
28 Aug 2026
20 Aug 2026
27 Aug 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. a) All kinds of soil. | 190 | cum | 260.3 | ₹49,457 |
| 2 | Repairing of leakage in existing uPVC water pipeline 50mm dia, including all fittings and extra pipe as required at site. (The cost of excavation and filling shall be paid separately.) | 45 | each | 1,312.95 | ₹59,082.75 |
| 3 | Repairing of leakage in existing uPVC water pipeline 80mm dia, including all fittings and extra pipe as required at site. (The cost of excavation and filling shall be paid separately.) | 65 | each | 2,112.45 | ₹1,37,309.25 |
| 4 | Repairing of leakage in existing CPVC water pipeline 80mm dia, including all fittings and extra pipe as required at site. (The cost of excavation and filling shall be paid separately.) | 28 | each | 3,934.85 | ₹1,10,175.8 |
| 5 | Repairing of leakage in existing CPVC water pipeline 50mm dia, including all fittings and extra pipe as required at site. (The cost of excavation and filling shall be paid separately.) | 20 | each | 2,037.75 | ₹40,755 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 190 | cum | 196 | ₹37,240 |
| 7 | Providing and fixing Un-plasticised Polyvinyl Chloride (uPVC) pipes Schedule-40 including all uPVC plain & brass threaded fittings and valves This includes jointing of pipes & fittings with one step uPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. a) 50 mm dia Pipes | 150 | metre | 573.25 | ₹85,987.5 |
| 8 | Providing and fixing Un-plasticised Polyvinyl Chloride (uPVC) pipes Schedule-40 including all uPVC plain & brass threaded fittings and valves This includes jointing of pipes & fittings with one step uPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. a) 80 mm dia Pipes | 450 | metre | 1,040 | ₹4,68,000 |
| 9 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work a) 50 mm nominal dia Pipes | 36 | metre | 794.25 | ₹28,593 |
| 10 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work a) 80 mm nominal dia Pipes | 84 | metre | 2,166.35 | ₹1,81,973.4 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
NIT18.pdf
Tender Documents • 2.59 MB
BOQ_969875.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .