Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | -0.03% | ₹2.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.0 L+₹59.28 (0.03%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹2.0 L+₹59.28 (0.03%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 L
EMD Value
₹3,952
Closing Date
8 Sept 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW BANDIPORA
EXECUTIVE ENGINEER REW BANDIPORA
C/O BRICK WALLING NEAR AYUSHMAN HOSPITAL AT GANASTAN
2026_RDPR_323340_11
NIT82
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW BANDIPORA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹3,952
19 Sept 2026
3 Sept 2026
9 Sept 2026
3 Sept 2026
8 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width)… All kinds of soil | 7.01 | cum | 561.85 | ₹3,938.57 |
| - | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. | 7.01 | cum | 218.4 | ₹1,530.98 |
| - | Supply / Spreading of Stone Solling with hand packed complete with 10 kms leads | - | cum | 1,200 | - |
| - | Providing and laying in position cement concrete of specified grade 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) — Raft | 1.05 | cum | 5,202.9 | ₹5,463.05 |
| - | Providing and laying in position specified grade of reinforced cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) — Raft | 3.15 | cum | 7,104.35 | ₹22,378.7 |
| - | Providing and laying in position cement concrete of specified grade 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) — Cement Concrete 80% | 5.89 | cum | 5,733.6 | ₹33,770.9 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level (Fe-500D or more) | 220.8 | kg | 123.2 | ₹27,202.56 |
| - | Brick work with common burnt clay Modular bricks of class designation 7.5 superstructure above plinth level upto floor five level Cement mortar 1:6 | 5.26 | cum | 9,027.2 | ₹47,483.07 |
| - | Centering and shuttering including strutting, propping etc. and removal of form work for:
4.6.1 Foundations, footings, bases for columns | 6.9 | sqm | 286.35 | ₹1,975.82 |
| - | Centering and shuttering including strutting, propping etc. and removal of form work for retaining walls, return walls, walls (any thickness)… | 32.2 | sqm | 628.95 | ₹20,252.19 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_1087971.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .