| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC | ₹1.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.0 Cr+₹15.4 L (8.29%)Rejected-AOC | ₹2.0 Cr+₹15.4 L (8.29%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MARUTHU CONSTRUCTIONS L1 | PMA CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.01 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications MDU Road Data-2020-21-Pg - 21 | 17,119 | M2 | 80 ₹13,69,520 Lowest | 83 ₹14,20,877 |
| 2.01 | Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications MDU Road Data-2020-21-Pg - 21 | 17,119 | M2 | 18 ₹3,08,142 Lowest | 18 ₹3,08,142 Lowest |
| 3.01 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 856 | M3 | 10,200 ₹87,31,200 Lowest | 10,500 ₹89,88,000 |
| 4.01 | Providing and laying Bituminous Concrete to 30mm/40mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 / VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 514 | M3 | 10,450 ₹53,71,300 Lowest | 10,800 ₹55,51,200 |
| 5.01 | Providing and laying of hot applied thermoplastic compound 205mm thick including reflect rising glass beads @ 250gms.per sqm.area.thickness of 2.5mm is exclusive of surface applied glass beads as per IRC :35. The finished surface to be level uniform and free from streadks sdand holes etc complete.(as per MORT & H Specification no803) MDU-CORP DATA-P-21 -SL No:5 | 761 | M2 | 935 ₹7,11,535 Lowest | 960 ₹7,30,560 |
| 6.01 | GST 18% | 1 | GST | 29,68,505 ₹29,68,505 Lowest | 30,59,780 ₹30,59,780 |
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
29 Mar 2023, 3:00 pmClosed
commissioner madurai corporation
commissioner madurai corporation
Providing of BT Surface SANJEEVI NAGAR 4TH Road 1ST CROSS Road 115003R00351,SANJEEVI NAGAR 4TH Road 1ST WEST CROSS Road 115003R00352,Officers Town Vinayagar Kovil Road
2023_MAWS_296779_1
E7/Package 2 Turip Phase-III/22-23
Open Tender
Civil Works
Lump-sum
60 days
Aringar Anna Maligai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.9 L
Aringar Anna Maligai
29 Jun 2026
22 Mar 2023
30 Mar 2023
22 Mar 2023
29 Mar 2023
22 Mar 2023
23 Mar 2023
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .