Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹17.3 LAccepted-AOC NEAR MIDDLE SCHOOL MD SIYAKAT KHADARAMAL MOHANPUR MAHAGAMA GODDA 814154 JHARKHAND INDIA | MAHAGAMA | GODDA | JHARKHAND | 814154 | ₹17.3 L Quoted ₹14.7 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹16.7 LRejected-Finance GF BABA BHORAI LONDHAIYA BAZAR GODDA 814165 JHARKHAND INDIA | GODDA | GODDA | JHARKHAND | 814165 | ₹16.7 L | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹17.7 LRejected-Finance | ₹17.7 L | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹18.2 LRejected-Finance AT HIJUKITA PO LALMATIA DIST GODDA JHARKHAND 814165 | LALMATIA | GODDA | JHARKHAND | 814165 | ₹18.2 L | L-4 | Rejected-Finance L-4 |
Tender Value
₹19.7 L
EMD Value
₹24,700
Closing Date
5 Mar 2026, 6:55 pmClosed
AE(C), RJML AREA
AREA OFFICE RAJMAHAL AREA, DHANKUNDA
Making cover slab, repairing and cleaning of drain at OB dump and Haita rehab site under Rajmahal Area.
2026_ECL_354257_1
ECL/RJML/AGM/AE(C)/ e-Ten/25-26/555 Dt-23.02.2026
Open Tender
Civil Works - Others
30 days
OB dump and Haita rehab site
Please refer Tender documents.
3 documents required · 3 mandatory
₹24,700
8 May 2026
23 Feb 2026
6 Mar 2026
23 Feb 2026
5 Mar 2026
23 Feb 2026
23 Feb 2026 - 26 Feb 2026
Item Description/ Heading
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars .
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Carriage of materials by mechanical transport including loading, unloading and stacking: Earth lead-1km
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_367077.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.09 MB
Tendernotice_2.pdf
PDF • 1.37 MB
BOQ_367077.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid