| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.6 LAdmitted-Finance | ₹35.6 L | L1 | Admitted-Finance |
| 2 | L2₹37.8 LAdmitted-Finance VILL H NO 100B SATYAM APARTMENT P O P S NOONMATI DIST KAMRUP METRO PIN 781020 | NOONMATI | KAMRUP METRO | ASSAM | 781020 | ₹37.8 L | L2 | Admitted-Finance |
| 3 | L3₹39.0 LAdmitted-Finance | ₹39.0 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Nobab Chand Ahmed L1 | SMTI MALLIKA DAS L2 | PRABIN DAS L3 |
|---|---|---|---|---|---|---|
| 1.00PART-A | ||||||
| 1.01 | Earth work in excavation of foundation for structures as per drawing & technical specification with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 237.3 | Cum | 129.34 ₹30,692.38 | 144.59 ₹34,311.21 | 144.59 ₹34,311.21 |
| 1.02 | Plaincementconcrete1:3:6normalmixinfoundationwithcrushedstoneaggregate40mmnormalsizemechanicallymixed,placedinfoundation and compacted by vibration including curing for 14 days. | 44.1 | Cum | 5,872.6 ₹2.6 L | 6,565.23 ₹2.9 L | 6,565.23 ₹2.9 L |
| 1.03 | Stonemasonryincementmortar1:3forparapetcompleteasperdrawing and technical specifications Clauses 700 and 1208.4 | 360.5 | Cum | 5,416.05 ₹19.5 L | 5,550 ₹20.0 L | 6,054.84 ₹21.8 L |
| 1.04 | EarhWorkinfillingbyheadloaduptoleadof60mwithapprovedqualityallleadsandliftsrammingandcompactingwithrammerweighingnotlessthan10kgandfallingfromheightofnotlessthan90cm and sprinkling with water if necessary. | 2,530.5 | Cum | 243.23 ₹6.2 L | 270 ₹6.8 L | 260 ₹6.6 L |
| 1.05 | Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 60mm as per technical specification clause 1504 complete including carriage. | 357.12 | sqm | 671.67 ₹2.4 L | 790.55 ₹2.8 L | 750.89 ₹2.7 L |
| 1.06 | Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions as per Technical Specification | 44 | cum | 172.44 ₹7,587.36 | 192.78 ₹8,482.32 | 192.78 ₹8,482.32 |
| 1.07 | Stone masonry in cement mortar for drain complete as per drawing & technical specification In 1:4 cement mortar | 43.2 | cum | 5,093.63 ₹2.2 L | 5,694.39 ₹2.5 L | 5,694.39 ₹2.5 L |
| 1.08 | Planting of Trees and their Maintenance for three Year in 0.60 m dia
holes, 1 m deep dug in the ground, mixing the soil with decayed farm
yard/sludge mannure, planting the saplings, backfilling the trenches,
watering , fixing the tree guatrd and maintaining the plants for three
year. | 51 | nos | 716.59 ₹36,546.09 | 801.11 ₹40,856.61 | 801.11 ₹40,856.61 |
| 1.09 | Construction of one No. RCC Signboard including Lettering, colouring | 1 | nos | 10,719.5 ₹10,719.50 | 11,983.42 ₹11,983.42 | 3,177.35 ₹3,177.35 |
Tender Value
₹39.8 L
EMD Value
₹79,620
Closing Date
28 Jan 2026, 2:00 pmClosed
Director of Soil Conservation
O/o The DSC, Bhumi sangrakshan bhanvan, RGB Road, Guwahati -05
Erosion Protection Work (RTP) near Gouri Nath Mandir at Sonaipar River under RIDFXXXI
2026_SCD_49976_7
Tender/NIT/Pt-I/2025-26/5924
Open Tender
Civil Works
120 days
Nagaon Soil Conservation Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹800
₹79,620
Yes
O/o The DSC, Assam
14 May 2026
6 Jan 2026
28 Jan 2026
9 Jan 2026
28 Jan 2026
16 Jan 2026
12 Jan 2026
PART-A
Earth work in excavation of foundation for structures as per drawing & technical specification with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
Plaincementconcrete1:3:6normalmixinfoundationwithcrushedstoneaggregate40mmnormalsizemechanicallymixed,placedinfoundation and compacted by vibration including curing for 14 days.
Stonemasonryincementmortar1:3forparapetcompleteasperdrawing and technical specifications Clauses 700 and 1208.4
EarhWorkinfillingbyheadloaduptoleadof60mwithapprovedqualityallleadsandliftsrammingandcompactingwithrammerweighingnotlessthan10kgandfallingfromheightofnotlessthan90cm and sprinkling with water if necessary.
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 60mm as per technical specification clause 1504 complete including carriage.
Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions as per Technical Specification
Stone masonry in cement mortar for drain complete as per drawing & technical specification In 1:4 cement mortar
Planting of Trees and their Maintenance for three Year in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year.
Construction of one No. RCC Signboard including Lettering, colouring
PART-B.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps, sand other deleterious matter, dressing of sides and bottom, backfilling the excavated earth to the extent required and utilising the remaining earth
Laying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same as directed
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation.
R.C.C. work in proportion 1:2:4: in all walls mixed with crushed stone aggregate 23 mm nominal size mechanically mixed & placed in all R.C.C. walls and completed by vibration including necessary shuttering as per technical specification and drawings
Supplying fitting fixing of TMT reinforcement bar in structure as per drawing and specification including cutting, bending, binding etc. complete as directed. (b) With TATA make
Supply , carriage of G.I. Pipe (50 mm dia ) for Railing including cutting & joining etc. complete
Plastering work with cement mortar in prop. 1:3 on brick work in sub structure as per technical specification complete as directed.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_79482.xls
BOQ • 0.34 MB
NagaonGouriNath.pdf
Tender Documents • 0.96 MB
Download all tender documents and submit your bid