| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.9 LAccepted-AOC | ₹78.9 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹79.5 LRejected-Finance 13B ELLORA ENCLAVE DAYAL BAGH AGRA U P | AGRA | AGRA | UTTAR PRADESH | ₹79.5 L | L2 | Rejected-Finance Not Being L1 |
| 3 | L3₹90.3 LRejected-Finance GSTIN: 09BKPPS0546B1Z1M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹90.3 L | L3 | Rejected-Finance Not Being L1 |
| 4 | L4₹1.2 CrRejected-Finance | ₹1.2 Cr | L4 | Rejected-Finance Not Being L1 |
| 5 | L5₹1.2 CrRejected-Finance | ₹1.2 Cr | L5 | Rejected-Finance Not Being L1 |
| Sl No | Description | Qty | Unit | M/S BADRI SINGH L3 | NIKHIL CONSTRUCTION L2 | M/S SANJEEV SRIVASTAVA L5 | S.B. ENTERPRISES L1 | M/S SANTOSH KUMAR SRIVASTAVA CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Jungle Clearance | ||||||||
| 1.10 | Ordinary Jungle clearance from drain section and its proper disposal 30 m away from including cost of all types of labour ,T&P etc. as per directed by Engineer- incharge. | 2,14,427 | Sqm | 2 ₹4.3 L | 2.3 ₹4.9 L | 3.3 ₹7.1 L | 2.5 ₹5.4 L | 3 ₹6.4 L |
| 2.00Earth work | ||||||||
| 2.10 | Earth work in drain including all types of soil lead lift with its proper levelilng and dressing including cost of all types of labour,T&P etc. as per directed by Engineer- incharge. | 1,28,095 | Cum | 50 ₹64.0 L | 42 ₹53.8 L | 68 ₹87.1 L | 46 ₹58.9 L | 67 ₹85.8 L |
| 3.00Pitching work of floor, U/S and D/S Slope both side | ||||||||
| 3.10 | Dismantling old and damaged brick/boulder/ stone pitching including stacking of materials. | 99 | Cum | 60 ₹5,940 | 300 ₹29,700 | 88 ₹8,712 | 56 ₹5,544 | 80 ₹7,920 |
| 3.20 | Earthwork in excavation for foundation including lift upto 1.5 meter and lead upto 30 meter, levelling, dressing and its proper disposal as directed by Engineer-in-charge. | 648 | Cum | 75 ₹48,600 | 60 ₹38,880 | 95 ₹61,560 | 86 ₹55,728 | 90 ₹58,320 |
| 3.30 | Supplying & Laying Geotextile sheet made of 240 G.S.M. woven multifilament polypropylene yarn below crated stone boulder pitching including cost of all material, T&P as directed by site incharge. | 1,782 | Sqm | 99 ₹1.8 L | 95 ₹1.7 L | 110 ₹2.0 L | 86 ₹1.5 L | 100 ₹1.8 L |
| 3.40 | Supplying and Laying of stone boulder 25 to 60 Kg in GI wire crate of size 2.0x1.5x0.30 m on slope including cost of all material, labour, cartage, T&P etc. | 628 | Cum | 1,300 ₹8.2 L | 1,900 ₹11.9 L | 1,500 ₹9.4 L | 886 ₹5.6 L | 1,450 ₹9.1 L |
| 3.50 | Supplying and laying machine made Hexagonal shape 10 SWG A class 250 SM Zinc coated G.I. Wire crate of size 2.00x1.50x0.30 m made for crated boulder on slope including all cost of material, labour and T.&P. etc. for proper completion of work | 630 | Nos | 1,700 ₹10.7 L | 950 ₹6.0 L | 1,970 ₹12.4 L | 1,086 ₹6.8 L | 1,950 ₹12.3 L |
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
25 Feb 2026, 2:30 pmClosed
SE IWC MIRZAPUR
SE IWC MIRZAPUR IRRIGATION COLONY FATHA MIRZAPUR 231001
Increasing Capacity of Bhoka Nala From Ch.km. 0.000 to km. 23.000
2026_UPIDC_1111524_1
07/SE/2025-26
Open Tender
Civil Works
90 days
JAMALPUR CHUNAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹2.5 L
3 Jun 2026
20 Feb 2026
25 Feb 2026
20 Feb 2026
25 Feb 2026
20 Feb 2026
Jungle Clearance
Ordinary Jungle clearance from drain section and its proper disposal 30 m away from including cost of all types of labour ,T&P etc. as per directed by Engineer- incharge.
Earth work
Earth work in drain including all types of soil lead lift with its proper levelilng and dressing including cost of all types of labour,T&P etc. as per directed by Engineer- incharge.
Pitching work of floor, U/S and D/S Slope both side
Dismantling old and damaged brick/boulder/ stone pitching including stacking of materials.
Earthwork in excavation for foundation including lift upto 1.5 meter and lead upto 30 meter, levelling, dressing and its proper disposal as directed by Engineer-in-charge.
Supplying & Laying Geotextile sheet made of 240 G.S.M. woven multifilament polypropylene yarn below crated stone boulder pitching including cost of all material, T&P as directed by site incharge.
Supplying and Laying of stone boulder 25 to 60 Kg in GI wire crate of size 2.0x1.5x0.30 m on slope including cost of all material, labour, cartage, T&P etc.
Supplying and laying machine made Hexagonal shape 10 SWG A class 250 SM Zinc coated G.I. Wire crate of size 2.00x1.50x0.30 m made for crated boulder on slope including all cost of material, labour and T.&P. etc. for proper completion of work
Supplying and laying machine made Hexagonal shape 10 SWG A class 250 SM Zinc coated G.I. Wire crate of size 2.00x1.50x0.45 m made for crated boulder on slope including all cost of material, labour and T.&P. etc. for proper completion of work
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.23 MB
TDLNIT07LOt01.pdf
Tender Documents • 2.06 MB
BOQ_2073857.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid