Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 LAccepted-AOC | ₹29.8 L | L1 | Accepted-AOC Low level quoted rate |
| 2 | Rejected-Technical | - | - | Rejected-Technical High Level Quoted |
| Sl No | Description | Qty | Unit | PVMG TRADERS L1 | V.YOGANATHAN L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers.First depth of 2m From 0 to 2 m below GL | 121.91 | Cum | 246 ₹29,989.86 | 253 ₹30,843.23 |
| 2.00 | Second depth of 2m From 2m to 4 m below GL | 33.46 | Cum | 258 ₹8,632.68 | 265 ₹8,866.90 |
| 3.00 | Sand filling for foundation with clear river sand including cost of sand, watering ,ramming and consolidation etc complete as directed by TWAD Bord officers | 18.25 | Cum | 1,512 ₹27,594 | 1,552 ₹28,324 |
| 4.00 | Plain Cement Concrete 1:4:8 (one cement, four sand and eight hard granite broken stone of 40mm size ISS gauge) for foundation and footing including mixing, placing, ramming ,finishing curing etc. complete in accordance with standard specification and as directed by the TWAD Board Officers. | 9.13 | Cum | 5,099 ₹46,553.87 | 5,231 ₹47,759.03 |
| 5.00Reinforced Cement Concrete Mix M30 grade using 10mm & 20mm Hard blue granite Broken stone (machine crushed) excluding the cost of RTS rods for reinforcement and centering, strutting, shuttering but including cost of all materials mixing, laying, Vibrating the concrete with mechanical vibrators, ramming, consolidating, finishing and curing etc., Complete and as directed by the TWAD Board Officers. | |||||
| 6.00 | Below 1.5m from GL | 34.66 | Cum | 9,032 ₹3.1 L | 9,265 ₹3.2 L |
| 7.00 | 0m to 1.50m below GL | 2.58 | Cum | 9,032 ₹23,302.56 | 9,265 ₹23,903.70 |
| 8.00 | 0m to 4.50m above GL | 4.05 | Cum | 9,164 ₹37,114.20 | 9,400 ₹38,070 |
| 9.00 | 4.50 m to 7.32 m above GL | 3.23 | Cum | 9,423 ₹30,436.29 | 9,666 ₹31,221.18 |
| 10.00 | 7.32 m to 10.98 m above GL | 3.64 | Cum | 9,683 ₹35,246.12 | 9,933 ₹36,156.12 |
Tender Value
Refer Docs
EMD Value
₹29,970
Closing Date
31 Jul 2024, 4:00 pmClosed
Block Development Officer,Uthiramerur
Block Development Office,Uthiramerur
Construction of 60000ltr Capacity of OHT with distribution line and Main line at Kaliyapettai Village in Kaliyapettai Panchayat in Uthiramerur Panchayat Union under NABARD 2024-25
2024_RDTN_466707_1
R.C.No.6361/2022A11 Dt 15.07.2024
Open Tender
Civil Works
Uthiramerur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹29,970
30 Apr 2026
26 Jul 2024
31 Jul 2024
26 Jul 2024
31 Jul 2024
26 Jul 2024
Amount
Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers.First depth of 2m From 0 to 2 m below GL
Second depth of 2m From 2m to 4 m below GL
Sand filling for foundation with clear river sand including cost of sand, watering ,ramming and consolidation etc complete as directed by TWAD Bord officers
Plain Cement Concrete 1:4:8 (one cement, four sand and eight hard granite broken stone of 40mm size ISS gauge) for foundation and footing including mixing, placing, ramming ,finishing curing etc. complete in accordance with standard specification and as directed by the TWAD Board Officers.
Reinforced Cement Concrete Mix M30 grade using 10mm & 20mm Hard blue granite Broken stone (machine crushed) excluding the cost of RTS rods for reinforcement and centering, strutting, shuttering but including cost of all materials mixing, laying, Vibrating the concrete with mechanical vibrators, ramming, consolidating, finishing and curing etc., Complete and as directed by the TWAD Board Officers.
Below 1.5m from GL
0m to 1.50m below GL
0m to 4.50m above GL
4.50 m to 7.32 m above GL
7.32 m to 10.98 m above GL
10.98 m to 14.64 m above GL
14.64 m to 18.30 m above GL
Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG10 stiffened with MS angle of size 25 X 25 X 3 mm for boarding laid over I type MS Truss of size 25 X 25 X 3mm about 90cm c/c and supported by 40mm GI pipes (Medium) spaced at 75cm c/c etc complete and as directed by the TWAD Board Officers.
Below 1.5m from GL
From GL to 3.30m
From 5.30m to 6.30m above GL
From 8.30m to 9.30m above GL
From 11.30m to 12.30m
Curved Surface Upto 3.30m from floor slab as datum
Square Column Below GL and upto 3.30m above GL
3.31m to 4.30m ht
7.31m to 8.30m ht
8.31m to 9.30m ht
9.31m to 10.30m ht
10.31m to 11.30m ht
11.31m to 12.30m ht
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete
Supplying, cutting, bending, tying, fabricating and placing in position of steel rods for all RCC works including cost of steel and binding wire etc.( The steel should conform to the relevant ISspecification and supplied with test certificate Fe. 415 grade as per IS specification No.1786/1985 and as amended from time to time) delivery at site of work including loading, freight, unloading, stacking, transit insurance charges, taxes etc. complete.
Fabrication, supply, delivery and fixing of outside MS Ladder of 45cm clear wide made out of 50 mm x 50mm x 6mm MS angle for both sides
Providing 110mm PVC vent cowl arrangements mosquito proof nylon net and as directed by TWAD Board officers
Supply and fixing of cut stone of size 0.30m x 0.30m x 0.15m in CM 1;3(one cement and three sand) below inlet pipe for Service Reservoir as directed
Providing manhole cover of size 0.60 x 0.60M in RCC 1:1.5:3 with suitable reinforcement and 50x50x6mm MS angle fixed along edges .
Providing manhole cover of size 0.60 x 0.60M in RCC 1:1.5:3 with suitable reinforcement and 50x50x6mm MS angle fixed along edges .
Pipe connection arrangements for inlet,outlet,scour and overflow etc. including cost of pipes,specials,valve,labour charges for lifting, aligning, cutting, threading ,fixing and painting of GI pipes with two coats of approved quality enamal paint etc. complete as detailed below.
65mm GI pipes for inlet connection
65mm GI pipes for over flow & rain water harvesting pipe
50mm GI pipes for scour pipe
65mm GI pipe for delivery pipe
90mm PVC Threaded coupler
63mm PVC Threaded coupler
65mm dia GI Tee
65mm GI coupler
65mm GI union
65mm GI Elbow
50mm GI union
50mm GI Elbow
65x50mm GI reducer
65mm GM gate valve
50mm GM gate valve
65mm GI Flange Set
50mm GI Flange Set
63mm PVC bend
63 mm PVC 4Ksc Pipe
Refilling the foundation with excavated earth including consolidation
Labour charges for GI pipe connection to the OHT, for inlet, outlet, overflow and scour arrangements including cutting and threading, earth work excavation & refilling.
Providing Hand rails over the Roof slab by using 32 mm GI Pipe with 40mm x 6mm MS Flat and fixied with 12mm dia Fastner Bolt 75mm long and as directed by TWAD Bd officers
Providing Hand rails over the Standing Platform by using 32 mm GI Pipe with 40mm x 6mm MS Flat and fixied with 12mm dia Fastner Bolt 75mm long and as directed by TWAD Bd officers
Earth work Excavation in all Types of soil for pipe laying works including Refilling works as per SS20B All soil.
Cost and supply of 90 mm OD PVC Pipe
Labour Charges for Laying and Jointing of 90 mm OD PVC Pipe
Earth work Excavation in all Types of soil for pipe laying works including Refilling works as per SS20B All soil.
Cost and supply of 63 mm OD PVC Pipe
Labour Charges for Laying and Jointing of 63 mm OD PVC Pipe
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
V.YOGANATHAN (BID ID -1097428)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_554599.xls
BOQ • 0.26 MB
Schedule.pdf
Tender Documents • 0.38 MB
Download all tender documents and submit your bid