| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-AOC | ₹7.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.9 LRejected-AOC | ₹7.9 L | L2 | Rejected-AOC L2 |
| 3 | L3₹8.0 LRejected-AOC NO 612 C T H ROAD THIRUNINRAVUR CHENNAI TIRUVALLUR TAMIL NADU 602024 | THIRUVALLUR | TAMIL NADU | 602024 | ₹8.0 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | SMV POWER SOLUTION L1 | General Engineering Works L2 | EMR TAP CHANGERS PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00Servicing & overhauling of single pole, triple pole diverter switch of OLTC of 132/33 KV , 220/132 KV & 400/132kV Power Transformer/ ICTs. Detailed scope of work is given bellow- 1. Perform the Pre Overhauling Test: Continuity test and Ratio Test. 2. Check OLTC manual operation, raise and Lower side 3. Drain the oil of OLTC diverter chamber and OLTC conservator tank in clean and moisture free empty barrel. 4. Open the top Cover of OLTC after then, remove the diverter switch assembly from diverter chamber. 5. Check and clean the carbon deposition in the OLTC Diverter switch chamber with the help of pressurised power transformer oil by oil filtration machine. 6. Cleaning of moving & fixed contacts of diverters switch and diverter chamber with the help of hot transformer oil. 7. Check and correct the diverter operation without selected load (disconnecting selected load). 8. Check the value of transition (shunt) resistance in the resistance basket assembly. 9. Check and correct the looseness and tightness of the resistance basket assembly connections. 10. Replace the Required Material like Contacts, Top Oil seal or O ring including other consumable items & after that fill the OLTC with oil through filter machine after checking BDV of oil. (BDV should be minimum 60 KV). 11. Re-assembly of diverter switch after cleaning of diverter chamber & then check the Oil level in Conservator tank. 12. Release the air from the OLTC chamber by changing the taps of the OLTC manually, 13. Check the looseness and tightness of the drive mechanism of OLTC, 14. Check and correct, all the gear box and shaft alignment (Greasing of gear box). 15. Check and test all the Electrical Contactors and relays in Drive mechanism (MCB's, Motor Operation and Raise/Lower Operation) 16. Check and correct all the electrical connections of the diverter mechanism bas and correct electrical Operation through Local control & Remote control. 17. Check the connections & Signals of RTCC panels related to OLTC (TPI, raise, lower & Hooters) & replace the same if required. 18. Perform Post Overhauling Test: Continuity test, Ratio Test. | ||||||
| 1.01 | As per the above detailed scope of work, following single pole diverter switch of OLTC of power transformer is to be carried out at-
1. 220KV S/S REWA ROAD-
(i) 40MVA T/F-II (Accurate make,mfg year-2010)
(ii) 40MVA T/F-III (Atlanta make,mfg year-2018)
2 .220KV S/S CANTT-
(i) 40MVA T/F-I(Atlanta make,mfg year-2020)
3. 132KV S/S MINTO PARK-
(i) 63MVAT/F-I (T&R make,mfg year-2018)
4. 132KV S/S TELIYARGANJ
(i) 63MVAT/F-I (T&R make,mfg year-2018)
(i) 63MVAT/F-II (IMP make,mfg year-2012)
5. 132KV S/S TELIYARGANJ
(i) 63MVAT/F-I (CGL make,mfg year-2015)
(i) 63MVAT/F-II (CGL make,mfg year-2015) | 8 | Nos. | 41,900 ₹3.4 L | 44,100 ₹3.5 L | 44,500 ₹3.6 L |
| 1.02 | As per the above detailed scope of work, following three pole diverter switch of OLTC of 220/132 KV ICTs is to be carried out at-
1.400KV S/S MASAULI-
(i)200MVA T/F-I (CGL make,mfg year-2019)
(ii)200MVA T/F-II (CGL make,mfg year-2019)
(iii)200MVA T/F-III (CGL make,mfg year-2019)
1.220KV S/S REWA ROAD-
(i)200MVA T/F-I (BHEL make,mfg year-2018)
(ii)200MVA T/F-II (BHEL make,mfg year-2020)
(iii) 160 MVA T/F-III (Bharat Bijli make, mfg year-2012)
2.220KV S/S CANTT
(i)200MVA T/F-I (BHEL make,mfg year-2019)
(ii)200MVA T/F-II (BHEL make,mfg year-2019) | 8 | Nos. | 54,900 ₹4.4 L | 55,100 ₹4.4 L | 55,100 ₹4.4 L |
Tender Value
₹8 L
EMD Value
₹9,500
Closing Date
11 Oct 2025, 5:00 pmClosed
Superintending Engineer
Electricity Transmission Circle-II, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj.
Servicing and overhauling of single pole, triple pole diverter switch of OLTC of 132/33 KV and 220/132 KV Power Transformer/ ICT at various substations, under Electy. Trans. Division-II, Prayagraj
2025_UPTCL_1079997_1
37/ETC-II(P)/2025-2026
Open Tender
Electrical Works
60 days
ETD-II PRAYAGRAJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineer Electy. Trans. Div. Naini Alld.
₹9,500
5 Jan 2026
6 Oct 2025
13 Oct 2025
6 Oct 2025
11 Oct 2025
6 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid