Loading
Loading…
Loading…
Tender Value
Refer Docs
Closing Date
18 Feb 2022, 3:00 pmClosed
PR & CC
VAPOUR RECOVERY SYSTEM AT SANGRUR AND GUWAHATI IRD
21000917-HD-10157
21000917-HD-10157
Open Tender
Sangrur, Punjab
₹0
Exempted
18 Feb 2022
28 Jan 2022
18 Feb 2022
18 Feb 2022
28 Jan 2022 - 11 Feb 2022
4 Feb 2022
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | VRU DESIGN, ENGG & | VRU DESIGN, ENGG & — ECS/VRS : DESIGN, ENGINEERING, APPROVALS OF DOCUMENTS AND DRAWINGS FROM PURCHASER OF THE SKID MOUNTED VAPOR RECOVERY SYSTEM (WITH OR WITHOUT MEMBRANE) FOR PRODUCT, MOTOR SPIRIT (MS), VAPOR GENERATED FROM TANK TRUCK , TANK WAGON LOADING GANTRY, MEETING STIPULATED EMISSION LEVEL OF HYDROCARBON VAPOR AS PER STIPULATED CONDITIONS SPECIFIED IN THE MINISTRY OF ENVIRONMENT AND FORESTS GUIDELINES. SKID INCLUDES PRIMARY SEPARATING SYSTEM CONSISTING OF ACTIVATED CARBON ABSORBER (ACAD) WITH SUCTION BLOWER (IF REQUIRED), ACAD REGENERATION SYSTEM ABSORPTION COLUMN (PACKED COLUMN AND WITH DEMISTER PAD) FOR ABSORPTION OF HYDROCARBON VAPOR FROM SATURATED ACAD, DRY VACUUM PUMP OF SUITABLE CAPACITY WITH SUITABLE HEAD FOR REMOVAL OF HC VAPOR FROM ACAD, CENTRIFUGAL PUMP SET OF SUITABLE CAPACITY WITH SUITABLE HEAD. FOR CIRCULATION OF MS-III/ MS-IV LIQUID IN ABSORPTION COLUMN AND ALSO TO TRANSFER OF ABSORBED LIQUID TO STORAGE TANK THROUGH PIPELINE. BIDDER SHALL SUBMIT THE DESIGN CALCULATION REPORTS,ALL DRAWING & DOCUMENTS DULY VETTED BY HPCL APPROVED THIRD PARTY INSPECTION AGENCY(TPA)AS APPLICABLE AS PER TENDER TERMS & CONDITIONS. | - | Lump Sum |
| 2 | VRU SUPPLY | VRU SUPPLY — ECS/VRS SKID COMPLETE: MANUFACTURING, ASSEMBLY, TESTING, INSPECTION AND SUPPLY OF VRU AT SITE AS PER APPROVED DESIGN AND DRAWINGS INCLUDING PACKING, LOADING, FORWARDING, TRANSPORTATION, UNLOADING, ERECTION, PERFORMANCE TESTING & COMMISSIONING OF THE SKID MOUNTED VAPOR RECOVERY SYSTEM (WITH OR WITHOUT MEMBRANE) FOR PRODUCT, MOTOR SPIRIT (MS), VAPOR GENERATED FROM TRUCK LOADING GANTRY, MEETING STIPULATED EMISSION LEVEL OF HYDROCARBON VAPOR AS PER STIPULATED CONDITIONS SPECIFIED IN THE MINISTRY OF ENVIRONMENT AND FORESTS GUIDELINES. SKID INCLUDES PRIMARY SEPARATING SYSTEM CONSISTING OF ACTIVATED CARBON ABSORBER (ACAD) WITH SUCTION BLOWER (IF REQUIRED), ACAD REGENERATION SYSTEM ABSORPTION COLUMN (PACKED COLUMN AND WITH DEMISTER PAD) FOR ABSORPTION OF HYDROCARBON VAPOR FROM SATURATED ACAD, DRY VACUUM PUMP OF SUITABLE CAPACITY WITH SUITABLE HEAD FOR REMOVAL OF HC VAPOR FROM ACAD, CENTRIFUGAL PUMP SET OF SUITABLE CAPACITY WITH SUITABLE HEAD. FOR CIRCULATION OF MS-III/ MS-IV LIQUID IN ABSORPTION COLUMN AND ALSO TO TRANSFER OF ABSORBED LIQUID TO STORAGE TANK THROUGH PIPELINE. SUPPLY OF CENTRIFUGAL VERTICAL SUBMERGED PUMPS AS APPLICABLE AS PER DESIGN REQUIREMENT, ALONG WITH ALL PIPING AND ACCESSORIES TO BE INSTALLED IN UNDERGROUND TANKS SUITABLE FOR PUMPING MS TO ABSORPTION COLUMN, PIPING JOBS, INSTRUMENTATION JOBS, ELECTRICAL JOBS, ETC DETAILED SCOPE OF JOBS AS PER TENDER SPECIFICATIONS AND TERMS & CONDITIONS. | - | Lump Sum |
| 3 | INSTALLATION OF VRU | INSTALLATION OF VRU — UNLOADING, STORAGE AT SITE, SITE SECURITY OF MATERIALS, SITE HANDLING, INSTALLATION/ERECTION, TESTING, PAINTING,OF MECHANICAL, ELECTRICAL AND INSTRUMENTATION EQUIPMENT OF VAPOR RECOVERY SYSTEM. CIVIL WORK IS EXCLUDED FROM THE SUPPLIER SCOPE. HOWEVER, DESIGN, PREPARATION OF CIVIL DRAWINGS AND STAGE VERIFICATION OF DIMENSIONS OF CIVIL STRUCTURES ARE INCLUDED IN THE BIDDER SCOPE. SUPPLY OF 415 VOLT ELECTRICAL POWER, INSTRUMENT AIR OF 5-6 KG/CM2G PRESSURE, HEADER PIPE FROM TLF GANTRY ARE NOT INCLUDED IN THE BIDDER SCOPE. | - | Lump Sum |
| 4 | COMMISIOINING & SAT OF | COMMISIOINING & SAT OF — PRE-COMMISSIONING, SUCCESSFUL COMMISSIONING OF VAPOR RECOVERY SYSTEM AT SITE AND SUCCESSFUL COMPLETION OF THE SITE ACCEPTANCE TEST (SAT).SUCESSFUL COMISSIOINING OR SAT IS DEFINNED AS COMPLIANCE OF ALL PUNCH POINTS BY THE VENDOR AND ACCEPTED BY HPCL EIC | - | Lump Sum |
| 5 | AMC OF VAPOR RECOVERY | AMC OF VAPOR RECOVERY — AMC 1ST YEAR VAPOR RECOVERY UNIT: (INCLUSIVE OF ALL SPARES, ETC. AS REQUIRED), QUARTERLY VISIT AND ALL BREAKDOWN VISIT RATE QUOTED SHALL BE FOR ONE YEAR. | - | Each |
| 6 | AMC 2ND YEAR VAPOR | AMC 2ND YEAR VAPOR — AMC 2ND YEAR VAPOR RECOVERY UNIT: (INCLUSIVE OF ALL SPARES, ETC. AS REQUIRED), QUARTERLY VISIT AND ALL BREAKDOWN VISIT RATE QUOTED SHALL BE FOR ONE YEAR. | - | Each |
| 7 | AMC 3RD YEAR VAPOR | AMC 3RD YEAR VAPOR — AMC 3RD YEAR VAPOR RECOVERY UNIT: (INCLUSIVE OF ALL SPARES, ETC. AS REQUIRED), QUARTERLY VISIT AND ALL BREAKDOWN VISIT RATE QUOTED SHALL BE FOR ONE YEAR. | - | Each |
| 8 | AMC 4TH YEAR VAPOR | AMC 4TH YEAR VAPOR — AMC 4TH YEAR VAPOR RECOVERY UNIT: (INCLUSIVE OF ALL SPARES, ETC. AS REQUIRED), QUARTERLY VISIT AND ALL BREAKDOWN VISIT RATE QUOTED SHALL BE FOR ONE YEAR. | - | Each |
| 9 | AMC 5TH YEAR VAPOR | AMC 5TH YEAR VAPOR — AMC 5TH YEAR VAPOR RECOVERY UNIT: (INCLUSIVE OF ALL SPARES, ETC. AS REQUIRED), QUARTERLY VISIT AND ALL BREAKDOWN VISIT RATE QUOTED SHALL BE FOR ONE YEAR. SCHEDULE 2 GUWAHATI IRD Manadatory: No | - | Each |
| 1 | VRU DESIGN, ENGG & | VRU DESIGN, ENGG & — ECS/VRS : DESIGN, ENGINEERING, APPROVALS OF DOCUMENTS AND DRAWINGS FROM PURCHASER OF THE SKID MOUNTED VAPOR RECOVERY SYSTEM (WITH OR WITHOUT MEMBRANE) FOR PRODUCT, MOTOR SPIRIT (MS), VAPOR GENERATED FROM TANK TRUCK , TANK WAGON LOADING GANTRY, MEETING STIPULATED EMISSION LEVEL OF HYDROCARBON VAPOR AS PER STIPULATED CONDITIONS SPECIFIED IN THE MINISTRY OF ENVIRONMENT AND FORESTS GUIDELINES. SKID INCLUDES PRIMARY SEPARATING SYSTEM CONSISTING OF ACTIVATED CARBON ABSORBER (ACAD) WITH SUCTION BLOWER (IF REQUIRED), ACAD REGENERATION SYSTEM ABSORPTION COLUMN (PACKED COLUMN AND WITH DEMISTER PAD) FOR ABSORPTION OF HYDROCARBON VAPOR FROM SATURATED ACAD, DRY VACUUM PUMP OF SUITABLE CAPACITY WITH SUITABLE HEAD FOR REMOVAL OF HC VAPOR FROM ACAD, CENTRIFUGAL PUMP SET OF SUITABLE CAPACITY WITH SUITABLE HEAD. FOR CIRCULATION OF MS-III/ MS-IV LIQUID IN ABSORPTION COLUMN AND ALSO TO TRANSFER OF ABSORBED LIQUID TO STORAGE TANK THROUGH PIPELINE. BIDDER SHALL SUBMIT THE DESIGN CALCULATION REPORTS,ALL DRAWING & DOCUMENTS DULY VETTED BY HPCL APPROVED THIRD PARTY INSPECTION AGENCY(TPA)AS APPLICABLE AS PER TENDER TERMS & CONDITIONS. | - | Lump Sum |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
21000917-HD-10157.pdf
TENDER_DOCUMENT • 31.84 MB
Download all tender documents and submit your bid