Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹78,958.26Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹84,855.14+₹5,896.88 (7.47%)Admitted-Fee/PreQual/Technical/Finance B 111 101 1ST FLOOR A A VENTURES GALI NO 3 DAYALPUR EAST DELHI DELHI 110094 UDYAM DL 01 0034036 | NORTH EAST DELHI | DELHI | 110094 | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹84,955.09+₹5,996.83 (7.59%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹88,053.45+₹9,095.19 (11.5%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
18 Aug 2026, 6:55 pmClosed
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
RDDDC2627109813-(CO FLOOD PROTECTION BUND ON LAKUT KULL NEAR HO ABDUL HAMID RATHER NEAR HO MUDASIR AHMAD RATHER AND OTHERS AT RATNIPORA B BLOCK KAKAPORA)
2026_RDPR_318138_48
e- NIT No. 70/2026-27 Dated 27-07-2026
Open Tender
Civil Works
Percentage
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Pulwama
₹2,000
19 Aug 2026
27 Jul 2026
19 Aug 2026
27 Jul 2026
18 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soi | 7.82 | cum | 479.3 | ₹3,748.13 |
| 2 | Providing and laying of stone soling hand packed inc carriage all complete job | 4.63 | cum | 1,100 | ₹5,093 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm N. size | 12.51 | cum | 5,733.6 | ₹71,727.34 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for:Retaining walls ,walls (any thickness including attached pilasters,
buttresses, plinth and string course fillets, kerbs andsteps etc. | 34.2 | sqm | 286.35 | ₹9,793.17 |
| 6 | Carriage of sand bajri lead 15km by MT | 16.88 | cum | 279 | ₹4,709.52 |
| 7 | Carriage of sand lead by head load | - | cum | 200 | - |
| 8 | Add cost of sign board,photograps & other unforeseen items | 1 | LS | 1,500 | ₹1,500 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.85 MB
BOQ_1046489.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .