Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹3.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.5 L+₹15,876.51 (4.75%)Admitted-Fee/PreQual/Technical/Finance | ₹3.5 L+₹15,876.51 (4.75%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.5 L+₹16,101.07 (4.81%)Admitted-Fee/PreQual/Technical/Finance | ₹3.5 L+₹16,101.07 (4.81%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.5 L+₹17,323.05 (5.18%)Admitted-Fee/PreQual/Technical/Finance PALLA STREET VENGANTHUR VILUPPURAM | ₹3.5 L+₹17,323.05 (5.18%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹3.5 L+₹17,378.87 (5.20%)Admitted-Fee/PreQual/Technical/Finance | ₹3.5 L+₹17,378.87 (5.20%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | M THIRUNAVUKKARASU L3 | MAHA BUILDERS L6 | BSA ASSOCIATES L7 | SRI THANGAMMAN CONSTRUCTIONS L5 | JAI CONSTRUCTIONS L1 | siva kumar L2 | NAVEEN CONSTRUCTIONS L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Hire charges for JCB including all cost of materials, labour charges , etc completed as per the direction of the departmental officer in charges. | 8 | hrs | 824.13 ₹6,593.04 | 973 ₹7,784 | 973 ₹7,784 | 833 ₹6,664 | 10 ₹80 Lowest | 803 ₹6,424 | 900 ₹7,200 |
| 2.00 | Earth work Excavation in all soils with initial lead and lift etc., complete (CBE 25-26 P.no. 3) | 1 | m3 | 186.34 ₹186.34 | 220 ₹220 | 10 ₹10 Lowest | 187 ₹187 | 10 ₹10 Lowest | 179.5 ₹179.5 | 200 ₹200 |
| 3.00 | Cement Concrete Broken Stone in Cement mortar 1:4:8 mix using 40mm metal granite stone completed complying with standard specification and as directed. (CBE 25-26 P.no. 4) | 1 | m3 | 5,050.17 ₹5,050.17 | 5,962.42 ₹5,962.42 | 100 ₹100 | 3,500 ₹3,500 | 10 ₹10 Lowest | 5,000 ₹5,000 | 5,000 ₹5,000 |
| 4.00 | Supply and erecting shuttering including necessary supports for plane surfaces such as RCC footing, plinth beam, stair case etc., in all floors using mild steel sheets of 90cm X 60cm and 10 gauge stiffened with welded mild steel angle for boarding supported by casurina props at suitable intervals etc., completed complying with standard specification and as directed. (CBE 25-26 P.no. 5) | 5 | m2 | 1,200.37 ₹6,001.85 | 1,417.2 ₹7,086 | 100 ₹500 | 1,000 ₹5,000 | 10 ₹50 Lowest | 1,200 ₹6,000 | 1,100 ₹5,500 |
| 5.00 | Providing Pile foundation of size 300 mm dia using augur including labour charges and all other tools and plants charges etc. , as per direction of dept officers (Local Rate) (CBE 25-26 P.no. 20) | 30 | M | 260.88 ₹7,826.4 | 208 ₹6,240 | 100 ₹3,000 | 280 ₹8,400 | 10 ₹300 Lowest | 261.5 ₹7,845 | 300 ₹9,000 |
| 6.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (MSand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification (CBE 25-26 P.no. 5) | 3 | M | 6,155.01 ₹18,465.03 | 6,933 ₹20,799 | 1,500 ₹4,500 Lowest | 6,000 ₹18,000 | 6,378.28 ₹19,134.84 | 6,176 ₹18,528 | 6,250 ₹18,750 |
| 7.00 | Supplying and fabricating of reinforcement steel of all diameters for reinforced cement concrete works at all heights and depths including straightening, cleaning,cutting,ending, placing in position and binding, hoisting and welding if any including cost of power, electrodes etc, cost of annealed binding wire (18 gauge), providing overlaps, tying in position and providing necessary cover blocks for all works as per detailed drawings supplied (including chairs, cranks, lap rods, spacer bars, fan hooks etc.,) with the relevant standard specifications, complete for all leads & lifts. (CBE 25-26 P.no. 8) | 2 | Qtl | 8,082.2 ₹16,164.4 | 9,042 ₹18,084 | 1,000 ₹2,000 Lowest | 7,500 ₹15,000 | 8,375.37 ₹16,750.74 | 8,110 ₹16,220 | 8,500 ₹17,000 |
| 8.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M Sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. (CBE 25-26 P.no. 6) | 2 | m3 | 8,253.63 ₹16,507.26 | 9,244 ₹18,488 | 9,500 ₹19,000 | 7,000 ₹14,000 Lowest | 8,553.01 ₹17,106.02 | 8,282 ₹16,564 | 8,500 ₹17,000 |
| 9.00 | Supply MS L Angle, Steel channel and MS wire of various size of rod including all cost of materials, One coat of primer, labour charges ,transportation etc completed as per the direction of the departmental officer in charges. (CBE 25-26 P.no. 11) | 765.16 | Kg | 95.89 ₹73,371.19 | 100 ₹76,516 | 130 ₹99,470.8 | 104.5 ₹79,959.22 | 99.37 ₹76,033.95 | 96 ₹73,455.36 | 90 ₹68,864.4 Lowest |
| 10.00 | Painting with best synthetic enamel paint of approved Colour and high quality two coats to new iron works complete complying with standard specifications and as directed by the dept officers (CBE 25-26 P.no. 13) | 20 | m2 | 139.08 ₹2,781.6 | 164.2 ₹3,284 | 175 ₹3,500 | 134 ₹2,680 | 10 ₹200 Lowest | 97 ₹1,940 | 156.3 ₹3,126 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
12 Aug 2026, 3:00 pmClosed
The Assistant Commissioner,
North Zone, Coimbatore Corporation, Balasundaram Road,Oppsite Womens Polytechnic
Providing Fencing at KK Nagar Toilet in Ward No 13, North Zone
2026_MAWS_690592_12
E2/NorthZone/2026-27
Open Tender
Civil Works
Works
90 days
North Zone, Coimbatore Corporation
As per the tender condition attached
5 documents required · 5 mandatory
₹0
₹5,000
14 Aug 2026
4 Aug 2026
13 Aug 2026
4 Aug 2026
12 Aug 2026
4 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hire charges for JCB including all cost of materials, labour charges , etc completed as per the direction of the departmental officer in charges. | 8 | hrs | - | - |
| 2 | Earth work Excavation in all soils with initial lead and lift etc., complete (CBE 25-26 P.no. 3) | 1 | m3 | - | - |
| 3 | Cement Concrete Broken Stone in Cement mortar 1:4:8 mix using 40mm metal granite stone completed complying with standard specification and as directed. (CBE 25-26 P.no. 4) | 1 | m3 | - | - |
| 4 | Supply and erecting shuttering including necessary supports for plane surfaces such as RCC footing, plinth beam, stair case etc., in all floors using mild steel sheets of 90cm X 60cm and 10 gauge stiffened with welded mild steel angle for boarding supported by casurina props at suitable intervals etc., completed complying with standard specification and as directed. (CBE 25-26 P.no. 5) | 5 | m2 | - | - |
| 5 | Providing Pile foundation of size 300 mm dia using augur including labour charges and all other tools and plants charges etc. , as per direction of dept officers (Local Rate) (CBE 25-26 P.no. 20) | 30 | M | - | - |
| 6 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (MSand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification (CBE 25-26 P.no. 5) | 3 | M | - | - |
| 7 | Supplying and fabricating of reinforcement steel of all diameters for reinforced cement concrete works at all heights and depths including straightening, cleaning,cutting,ending, placing in position and binding, hoisting and welding if any including cost of power, electrodes etc, cost of annealed binding wire (18 gauge), providing overlaps, tying in position and providing necessary cover blocks for all works as per detailed drawings supplied (including chairs, cranks, lap rods, spacer bars, fan hooks etc.,) with the relevant standard specifications, complete for all leads & lifts. (CBE 25-26 P.no. 8) | 2 | Qtl | - | - |
| 8 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M Sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. (CBE 25-26 P.no. 6) | 2 | m3 | - | - |
| 9 | Supply MS L Angle, Steel channel and MS wire of various size of rod including all cost of materials, One coat of primer, labour charges ,transportation etc completed as per the direction of the departmental officer in charges. (CBE 25-26 P.no. 11) | 765.16 | Kg | - | - |
| 10 | Painting with best synthetic enamel paint of approved Colour and high quality two coats to new iron works complete complying with standard specifications and as directed by the dept officers (CBE 25-26 P.no. 13) | 20 | m2 | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
NITE2-Buildings.pdf
Tender Documents • 0.38 MB
BOQ_830393.xls
BOQ • 0.28 MB
ITBE2.pdf
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .