Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.7 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹5.8 L+₹12,360.90 (2.18%)Rejected-Finance 0 JANKI NAGAR NEAR SURAJ HOTEL GONDA UTTAR PRADESH 271001 | GONDA | UTTAR PRADESH | 271001 | 2 | Rejected-Finance L2 | |
| 3 | 3₹5.9 L+₹19,129 (3.37%)Rejected-Finance | 3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical REJECT | |
| 5 | Rejected-Technical 102 SAI APPARTMENT SIMROL ROAD DREAMLAND MHOW INDORE MADHYA PRADESH 453441 INDIA | INDORE | MADHYA PRADESH | 453441 | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | M/S ARVIND KUMAR DUBEY L3 | M/s PARI ENTERPRISES L2 | M/s Shree Dauji Enterprises L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in silt clearance with slush including lead upto 1.5 m and lead upto 30m by manual labour or machine.The earth from clearance to be used in side embankment or to be disposed off on spoil banks or as per directed by engineer in-charge. | 749 | Cum | 78 ₹58,422 | 78.1 ₹58,496.9 | 77 ₹57,673 Lowest |
| 2.00 | Earthwork in silt clearance including lead upto 1.5 m and lead upto 30m by manual labour or machine. The earth from clearance to be used in side embankment or to be disposed off on spoil banks or as per directed by engineer in-charge. | 8,370 | Cum | 55.5 ₹4,64,535 | 55.1 ₹4,61,187 | 54 ₹4,51,980 Lowest |
| 3.00 | Scraping internal section of existing channel i.e. Bed & slope with silt up to 5cm | 11,650 | Sqm. | 5.5 ₹64,075 | 5.2 ₹60,580 | 5 ₹58,250 Lowest |
Tender Value
Refer Docs
EMD Value
₹59,000
Closing Date
29 Apr 2026, 2:00 pmClosed
Executive Engineer
Irrigation Division, Firozabad
Silt clearance work on the Harnad Drain from Km 58.000 to Km 65.000.
2026_UPIDC_1141213_6
01/EE/2026-27
Open Tender
Civil Works
Item Wise
15 days
Silt clearance work on the Harnad Drain from Km 58
Please refer Tender documents.
2 documents required · 2 mandatory
₹856
₹59,000
8 Jun 2026
24 Apr 2026
29 Apr 2026
24 Apr 2026
29 Apr 2026
24 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in silt clearance with slush including lead upto 1.5 m and lead upto 30m by manual labour or machine.The earth from clearance to be used in side embankment or to be disposed off on spoil banks or as per directed by engineer in-charge. | - | Cum | - | - |
| 2 | Earthwork in silt clearance including lead upto 1.5 m and lead upto 30m by manual labour or machine. The earth from clearance to be used in side embankment or to be disposed off on spoil banks or as per directed by engineer in-charge. | - | Cum | - | - |
| 3 | Scraping internal section of existing channel i.e. Bed & slope with silt up to 5cm | - | Sqm. | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 19.92 MB
documents.pdf
Tender Documents • 28.07 MB
BOQ_2131129.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .