| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹37.9 L+₹90,057.08 (2.44%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | TDR and Co L2 | M/S ARJUNAN CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.01Renewal BT Road Vairampettai-Kiledyalam road km 0/0 - 2/350 | |||||
| 1.02 | Clearing the scrub jungles including all labour charges for all labour charges etc complete. | 2,820 | Sqm | 10 ₹28,200 | 6 ₹16,920 Lowest |
| 1.03 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br | 1,058 | Cum | 200 ₹2,11,600 | 140.35 ₹1,48,490.3 Lowest |
| 1.04Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal | |||||
| 1.05 | KM0/0-1/0 | 30.74 | Cum | 4,000 ₹1,22,960 | 3,937.22 ₹1,21,030.14 Lowest |
| 1.06 | KM1/0-2/0 | 13.64 | Cum | 3,947.3 ₹53,841.17 Lowest | 3,947.3 ₹53,841.17 Lowest |
| 1.07 | KM 2/0-2/350 | 7.69 | Cum | 3,957.38 ₹30,432.25 Lowest | 3,957.38 ₹30,432.25 Lowest |
| 1.08 | Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | 8,812.5 | Sqm | 33.34 ₹2,93,808.75 Lowest | 33.34 ₹2,93,808.75 Lowest |
| 1.09 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5 | 220.31 | Cum | 11,105.3 ₹24,46,608.64 Lowest | 11,105.3 ₹24,46,608.64 Lowest |
| 1.10 | Provision of 5 nos. Rumble strips covered with premix bituminous carpet, 15-20 mm high at centre,250mm wide placed at 1m c/c at approval locations to control speed, marked with white strips of road marking paint. | 11.25 | Cum | 377.67 ₹4,248.79 Lowest | 377.67 ₹4,248.79 Lowest |
Tender Value
₹37.3 L
EMD Value
₹37,300
Closing Date
27 Nov 2025, 3:00 pmClosed
BDO BP
Merkanam
Renewal BT Road From Vairampettai-Kiledaiyalam road km 0/0 - 2/350 Under SFC -25-26
2025_RDTN_625258_1
SFC-ROAD WORK -25-26
Open Tender
Civil Works
Works
180 days
Merkanam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹37,300
Yes
29 Dec 2025
21 Nov 2025
27 Nov 2025
21 Nov 2025
27 Nov 2025
21 Nov 2025
Amount
Renewal BT Road Vairampettai-Kiledyalam road km 0/0 - 2/350
Clearing the scrub jungles including all labour charges for all labour charges etc complete.
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision of 5 nos. Rumble strips covered with premix bituminous carpet, 15-20 mm high at centre,250mm wide placed at 1m c/c at approval locations to control speed, marked with white strips of road marking paint.
KM stone
HM stone
Provision for Name Board Charges
Provision for Photograpic Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
TDR and Co (BID ID -1519886)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
Sfcnew.pdf
Tender Documents • 0.89 MB
BOQ_747670.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .