Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | ok₹1.8 LAccepted-AOC | ₹1.8 L | ok | Accepted-AOC ok |
| 2 | Rejected-Technical | - | - | Rejected-Technical high |
| Sl No | Description | Qty | Unit | Tamilnadu Traders L2 | Elite Enterprises L1 |
|---|---|---|---|---|---|
| 1.00 | 1” dia PVC 10Kg/CM2 Pipe | 1 | mtr | 95 ₹95 | 90 ₹90 |
| 2.00 | ¾ PVC pipe 15 KCS | 1 | mtr | 90 ₹90 | 84 ₹84 |
| 3.00 | 2 “dia PVC 6 Kg/CM2 pipe | 1 | mtr | 350 ₹350 | 340 ₹340 |
| 4.00 | 11/4” PVC pipe 4 Kg & 6 Kg | 1 | mtr | 100 ₹100 | 98 ₹98 |
| 5.00 | 3”dia PVC 6 Kg / CM2 Pipe | 1 | mtr | 420 ₹420 | 400 ₹400 |
| 6.00 | 11/2” PVC Pipe 4 Kg & 6 Kg | 1 | mtr | 130 ₹130 | 125 ₹125 |
| 7.00 | 4 dia PVC 6 Kg / CM2 Pipe | 1 | mtr | 650 ₹650 | 600 ₹600 |
| 8.00 | 5 dia PVC 6 Kg / CM2 Pipe | 1 | mtr | 650 ₹650 | 630 ₹630 |
| 9.00 | 6 dia PVC 6 Kg / CM2 Pipe | 1 | mtr | 780 ₹780 | 760 ₹760 |
| 10.00 | 2 dia PVC 4 Kg / CM2 Pipe | 1 | mtr | 140 ₹140 | 135 ₹135 |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
11 Feb 2026, 3:00 pmClosed
EXECUTIVE OFFICER
PODHATURPET TOWN PANCHAYAT
Supply and delivery of following water supply maintenance materials including cost and conveyance of materials.
2026_DTP_653238_1
ANNUAL TENDER WS
Open Tender
Maintenance Goods
PODHATURPET TOWN PANCHAYAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,000
6 Mar 2026
9 Feb 2026
11 Feb 2026
9 Feb 2026
11 Feb 2026
9 Feb 2026
1” dia PVC 10Kg/CM2 Pipe
¾ PVC pipe 15 KCS
2 “dia PVC 6 Kg/CM2 pipe
11/4” PVC pipe 4 Kg & 6 Kg
3”dia PVC 6 Kg / CM2 Pipe
11/2” PVC Pipe 4 Kg & 6 Kg
4 dia PVC 6 Kg / CM2 Pipe
5 dia PVC 6 Kg / CM2 Pipe
6 dia PVC 6 Kg / CM2 Pipe
2 dia PVC 4 Kg / CM2 Pipe
3 dia PVC 4 Kg / CM2 Pipe
4 dia PVC 4 Kg / CM2 Pipe
5 dia PVC 6 Kg / CM2 Pipe
6” PVC Pipe 6 Kg
1” dia PVC Bend
3/4” dia PVC Bend
1” dia PVC Tee
3/4” dia PVC Tee
¾ PVC End cap
1 “ dia PVC Elbow
¾ “ PVC Elbow
1” dia PVC coupling
¾” PVC coupling
2”dia PVC Bend
1 ½” PVC Bend
1 1/4” PVC Bend
2” dia PVC Tee
2 ½ ” dia PVC Tee
2” dia PVC end cap
2 ½ ” PVC end cap
2” dia PVC Elbow
2 ½ ” dia PVC elbow
2” dia PVC coupling
2 ½ ” PVC coupling
3”dia PVC Bend
2 ½ ” PVC Bend
3 dia PVC tee
3 dia PVC end cap
3 dia PVC Elbow
3 dia PVC coupling
1 1/2” dia PVC coupling
4 “dia PVC Bend
4 “dia PVC Tee
4 “dia PVC end cap
4 “dia PVC elbow
4 “dia PVC coupling
5“dia PVC Bend
6“dia PVC Bend
5“dia PVC Tee
6“dia PVC Tee
5“dia PVC end cap
6“ PVC end cap
5“dia PVC elbow
5“dia PVC coupling
6 “ PVC coupling
¾” C.I.Tap
1” C.I.Tap
¾” PVC Tap
1” PVC Tap
2”x3” PVC Reducer
2”x2 1/2 ”PVC Reducer
2”x4” PVC Reducer
3”x 2” PVC Reducer
2”x 6” PVC Reducer
3”x4” PVC Reducer
3”x4” PVC Reducer
3”x3” PVC Reducer
3”x6” PVC Reducer
4”x6” PVC Reducer
5”x6” PVC Reducer
Solvent Cement Solution
½” dia G.I.B Class Pipe
3/4” dia G.I.B Class Pipe
1 1/4” dia G.I.B Class Pipe
1” dia G.I.B Class Pipe
2” dia G.I.B Class Pipe
2 1/2” dia G.I.B Class Pipe
3” dia G.I.B Class Pipe
4” dia G.I.B Class Pipe
6” dia G.I.B Class Pipe
½” dia G.I.Bend
½” dia G.I.Elbow
½” dia G.I.coupling
½” dia G.I.Tee
¾” G.I.Bend
¾” G.I.Elbow
¾” G.I.coupling
¾” G.I.Tee
1” G.I.Bend
1” G.I.Elbow
1” G.I.coupling
1” dia G.I.Tee
11/4” dia G.I.B Coupling
2” G.I.Bend
2 ½ ” G.I. Bend
2 ” PVC G.I.Elbow
2 ½ ” G.I.Elbow
2” G.I.coupling
2 ½ ” G.I.coupling
2” dia G.I.Tee
2 ½ ” G.I. Tee
3”dia G.I.Bend
3”dia G.I.Elbow
3”dia G.I.coupling
3 ” dia G.I. Tee
4 ” dia G.I. Bend
4 ” dia G.I. Elbow
4 ” dia G.I. coupling
4”dia G.I. Tee
6 ” dia G.I. Bend
6 ” dia G.I. Elbow
6 ” dia G.I. coupling
6 ” dia G.I. Tee
2” x ½” saddle piece
2” x ¾ ” saddle piece
3” x ½” saddle piece
3” x ¾ ” saddle piece
5” x ¾” saddle piece
4” x ¾ Saddle piece
2” dia G.M.Gate valve
2 1/2” dia G.M.Gate valve
2 1/2” dia G.M. valve
3” dia G.M. valve
4” dia G.M. valve
5” dia G.M. valve
2” dia Sluice Valve
3” dia Sluice Valve
4” dia Sluice Valve
5” dia Sluice Valve
6” dia Sluice Valve
¾” dia PVC MTA & FTA
1” dia PVC MTA & FTA
2” dia PVC MTA & FTA
2 ½” dia PVC MTA & FTA
3” dia PVC MTA & FTA
4” dia PVC MTA & FTA
6” dia PVC MTA & FTA
2” dia flange set
2 1/2” dia flange set
3” dia flange set
4” dia flange set
5” dia flange set
6” dia flange set
2.5 Sq.mm submersible cable
4 Sq.mm submersible cable
6 Sq.mm submersible cable
¾ “ x 6” Pipe Nipple
¾ “ x 9” Pipe Nipple
¾ “ x 12 ” Pipe Nipple
2 x 6” Piped Nipple
2 x 12 ” Pipe Nipple
21/2” x 6” Pipe Nipple
3 x 6” Pipe Nipple
3 x 12” Piped Nipple
2” M.S.Clampset
2 ½” M.S.Clampset
3” M.S.Clampset
Nylon Rope 20mm
5/8 x 2 ½ ” Bold and Nuts
½ x 2 ½ ” Bold and Nuts
R.I.Sheet Leather
India Mark-II Hand Pump
Cylinder Assembly
Pump Body
Handle Assembly
Head Assembly
½” Connecting Rod
1 1/4” G.I.Pipe 3 Mt.length
3 /4 ” Rubber Hose
1” Rubber hose
3” Fire hose
4” Fire hose
5” Fire hose
Endra Flug cement
150mm A.C.Pipe
180mm A.C.Pipe
200mm A.C.Pipe
250mm A.C.Pipe
300mm A.C.Pipe
Yarn Spanyan (Rope)
2” Non Return valve
3” Non Return valve
4” Non Return valve
5” Non Return valve
6” Non Return valve
2” Air valve
3” Air valve
4” Air valve
5” Air valve
6” Air valve
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_783306.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_783306.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid