Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 CrAccepted-AOC | ₹5.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.3 Cr+₹26.3 L (5.20%)Rejected-Finance | ₹5.3 Cr+₹26.3 L (5.20%) | L2 | Rejected-Finance L2 |
| 3 | L3₹5.4 Cr+₹39.3 L (7.79%)Rejected-Finance 13B ELLORA ENCLAVE DAYAL BAGH AGRA U P | AGRA | AGRA | UTTAR PRADESH | ₹5.4 Cr+₹39.3 L (7.79%) | L3 | Rejected-Finance L3 |
Tender Value
₹5.6 Cr
EMD Value
₹11.2 L
Closing Date
23 Dec 2024, 11:00 amClosed
SE
IRRIGATION WORK CIRCLE, 9 SAPRU ROAD, CIVIL LINE, PRAYAGRAJ
Restoration works of Naini Dy and Demarcation of Canal land from km 0.000 to km 19.910
2024_UPIDC_974372_3
08/SE/2024-25
Open Tender
Civil Works
Item Wise
540 days
NAINI SIDE
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹11.2 L
15 Mar 2025
17 Dec 2024
23 Dec 2024
17 Dec 2024
23 Dec 2024
17 Dec 2024
Amount
Dismantling brick work cement mortar including stacking of materials as directed by engineer in-charge within a distance of 60 m per direction of Engineer-in-Charge.
Earth work in Excavation of foundation in ordinary soil/sandy loam, clay or sand including lift up to 1.5 meter and lead up to 30 meter including filling, watering, ramming, of excavated earth into the trenches or up to the space and sides of the foundation trenches or into charge up to a distance of 30 meter from the foundation trenches per direction of Engineer-in-Charge.
Laying C.C. M-10 (1:3:6) one part of cement, three part of coarse sand F.M.>2.00 & six part of stone ballast (size 20 mm to 40 mm) including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
1st Class Brick masonry in 1:3 CM (one part of cement and three Part of coarse sand F.M. >2.00)including cost of material, labour T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Supplying & fixing 20mm thick joint filler board including cost of material, labour T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
S/L 3mm thick multi-plast poly Plus Tar paper including cost of material, labour T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Laying R.C.C. Slab M-20 (1:1.5:3) A-20, M-20 With cement, crushed grit size 4.75 mm to 20mm well graded including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Laying C.C. copping M-20 (1:1.5:3) A-20, M-20 With cement, crushed grit size 4.75 mm to 20mm well graded including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Cement pointing 1:2 C.M.on Brick Masonary including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
E/W in filling in inner section of both banks, Daula, Service road and Aproaches of Naini Dy including proper compaction in layers and dressing with all lead, lift, T&P in all type of soil as per directed by site-in-charge.
Earth work in Correcting internal section of Naini Dy. including proper compaction in layers and dressing with all lead, lift, T&P in all type of soil as per directed by Engineer-in-Charge.
Correcting internal section of Naini Dy. with earth filled new EC bags including stitching with cost of sutli, bags and filling materials with placing in position at site as per directed by Engineer-in-Charge.
E/W in cutting in inner section of tail gul of Naini Dy. including proper dressing with all lead, lift, T&P in all type of soil as per directed by Engineer-in-Charge.
E/W Dismentaling of diversion including all lead & lift, cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Colour washing of two coat of parapet including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Fixing wheel guard stone including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge..
Providing and Laying LDPE Film on footing box, including cost of all material, labour, T&P etc. required for proper completion of work as direction of Engineer-in-charge .
Shuttering For Boundray Pillar work., including cost of all material, labour, T&P etc. required for proper completion of work as direction of Engineer-in-charge .
M-15 (1:2:4) PCC Foundation Concrete For Boundray Pillar work., including cost of all material, labour, T&P etc. required for proper completion of work as direction of Engineer-in-charge .
Fixing of RCC Precast Boundray Pillar work., including cost of all material, labour, T&P etc. required for proper completion of work as direction of Engineer-in-charge .
Painting of RCC Precast Boundray Pillar including cost of all material , labour , T&P etc. required for proper completion of work as direction of Engineer-in-charge
Writing letter on RCC Precast Boundray Pillar above 50mm but below 80mmincluding cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Dry brick on edge soling , including all cost of material, labour and T&P etc. required for proper completion of the work as direction of Engineer-in-charge.
Providing and fixing of 150 mm dia HDPE rigid pressure pipe 6 kg/m2 including cost of all material and labour T&P etc per direction of Engineer-in-Charge.
Preparation of Sub-grade for Lining excluding cost of earth work.
Supply and laying 100 mm thick local sand below in foundation C.C. including cost of all materials labour T&P etc per direction of Engineer-in-Charge.
Cut stone Masonary with 1:3 C.M. including cost of material labour T&P etc per direction of Engineer-in-Charge per direction of Engineer-in-Charge.
20 mm deep struck cement pointing on stone masonary with 1:2 C. M including cost of all materials, labours T&P etc per direction of Engineer-in-Charge.
RAJ BAHADUR SINGH (BID ID -4806535)
NIKHIL CONSTRUCTION (BID ID -4806673)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .