Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance | -19.99% | ₹2.4 L | L1 | Admitted-Finance |
| 2 | L2₹2.4 LAdmitted-Finance | -18.00% | ₹2.4 L | L2 | Admitted-Finance |
| 3 | L3₹2.4 LAdmitted-Finance | -17.54% | ₹2.4 L | L3 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,880
Closing Date
25 May 2026, 6:00 pmClosed
XEN OFFICE REW JAMMU
XEN OFFICE REW JAMMU
Construction of culvert at Kaku de Kothey panchayat Allah block Arnia AC Bishnah under CDF for the year 2026-27 2nd Call Block Level
2026_RDPR_310131_5
e-NIT No. 35 REWJ of 2026-27 dated 16-05-2026
Open Tender
Civil Works
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹5,880
2 Jun 2026
16 May 2026
26 May 2026
16 May 2026
25 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by MECHANICAL means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 56.5 | cum | 256.85 | ₹14,512.03 |
| 2 | Providing and laying in position 1:5:10 | 3.19 | cum | 4,826.5 | ₹15,396.54 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 16.53 | cum | 5,733.5 | ₹94,774.76 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 6.65 | cum | 7,788.4 | ₹51,792.86 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 492 | kg | 123.2 | ₹60,614.4 |
| 6 | Foundations, footings, bases of columns etc. for mass concrete | 73.97 | sqm | 286.35 | ₹21,181.31 |
| 7 | suspended floors | 16.73 | sqm | 718.2 | ₹12,015.49 |
| 8 | carriage of sand by 35 kms av. | 12.39 | cum | 575.54 | ₹7,130.94 |
| 9 | carriage of agg by 35 kms av. | 23.47 | cum | 575.54 | ₹13,507.92 |
| 10 | Add cost of Sigh Board and painting | 1 | each | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_1003622.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid