Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹59.5 L Construction of EDP Hostel Building, Academic Building and cafeteria at NIBM, Pune. SH 1A : Providing and Fixing uPVC DGU Windows along with MS grill at EDP Building. | Construction of EDP Hostel Building, Academic Building and cafeteria at NIBM, Pune. SH 1A : Providing and Fixing uPVC DGU Windows along with MS grill at EDP Building. | ₹59.5 L | L1 |
| 2 | L2₹63.7 L+₹4.2 L (7.04%) Construction of EDP Hostel Building, Academic Building and cafeteria at NIBM, Pune. SH 1A : Providing and Fixing uPVC DGU Windows along with MS grill at EDP Building. | Construction of EDP Hostel Building, Academic Building and cafeteria at NIBM, Pune. SH 1A : Providing and Fixing uPVC DGU Windows along with MS grill at EDP Building. | ₹63.7 L+₹4.2 L (7.04%) | L2 |
| 3 | L3₹67.5 L+₹8.0 L (13.4%) Construction of EDP Hostel Building, Academic Building and cafeteria at NIBM, Pune. SH 1A : Providing and Fixing uPVC DGU Windows along with MS grill at EDP Building. | Construction of EDP Hostel Building, Academic Building and cafeteria at NIBM, Pune. SH 1A : Providing and Fixing uPVC DGU Windows along with MS grill at EDP Building. | ₹67.5 L+₹8.0 L (13.4%) | L3 |
| 4 | L4₹74.1 L+₹14.5 L (24.4%) Construction of EDP Hostel Building, Academic Building and cafeteria at NIBM, Pune. SH 1A : Providing and Fixing uPVC DGU Windows along with MS grill at EDP Building. | Construction of EDP Hostel Building, Academic Building and cafeteria at NIBM, Pune. SH 1A : Providing and Fixing uPVC DGU Windows along with MS grill at EDP Building. | ₹74.1 L+₹14.5 L (24.4%) | L4 |
| 5 | L5₹84.7 L+₹25.2 L (42.3%) Construction of EDP Hostel Building, Academic Building and cafeteria at NIBM, Pune. SH 1A : Providing and Fixing uPVC DGU Windows along with MS grill at EDP Building. | Construction of EDP Hostel Building, Academic Building and cafeteria at NIBM, Pune. SH 1A : Providing and Fixing uPVC DGU Windows along with MS grill at EDP Building. | ₹84.7 L+₹25.2 L (42.3%) | L5 |
| Sl No | Description | Qty | Unit | Ganpati Construction L4 | NEHA NAGNATH NILAMWAR L3 | M/S R.R. VARMA L5 | HP Mishra Enterprises L10 | RUSHIKESH RAJENDRA SADGIR L8 | Pratik Praveen Agarwal L6 | KARD ENTERPRISES L9 | AVINASH ANKUSH MANE L7 | RAJU KHANDU LOKHANDE L1 | ALI CONSTRUCTION CO L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Civil Work | - | - | 4.47 ₹74,05,811.44 | -4.79 ₹67,49,446.85 | 19.49 ₹84,70,569.63 | 45.1 ₹1,02,86,046.14 | 40.49 ₹99,59,246.19 | 28.23 ₹90,90,142.63 | 42.01 ₹1,00,66,998.01 | 28.99 ₹91,44,018.55 | -16.02 ₹59,53,288.45 Lowest | -10.11 ₹63,72,244.57 |
Tender Value
₹70.9 L
EMD Value
₹1.4 L
Closing Date
27 Jul 2026, 3:00 pmClosed
EE-Pune-II
O/o. EE, RBIPD, A2 wing, 7th floor
Construction of EDP Hostel Building, Academic Building and cafeteria at NIBM, Pune. SH 1A : Providing and Fixing uPVC DGU Windows along with MS grill at EDP Building.
161975
22/NIT/EE/Pune-II/2026-27
OPEN
Civil Works - Buildings
NCB
3 months
Pune, Maharashtra
10 documents required · 10 mandatory
₹1.4 L
Not Applicable
27 Jul 2026
18 Jul 2026
27 Jul 2026
27 Jul 2026
25 Jul 2026
stage.html
html • 0.07 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT+NO+22+NIBM.pdf
document • 0.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .