Loading…
Loading…
Tender Value
₹4.0 L
EMD Value
₹7,988
Closing Date
26 Aug 2026, 3:00 pm3d left
Director TMC
Engineering services, Ground Floor, Pushp Building (Old St. Jude Building), ACTREC
HVAC work for Server Room for Halcyon 1 and 2 and True Beam at RT Block ACTREC
2026_TMC_920888_1
HT/LT-36/HVAC work for Halcyon/2026
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
60 days
ACTREC, Kharghar
As Per Tender Terms and conditions
2 documents required · 2 mandatory
₹0
₹7,988
ACTREC, Kharghar
26 Aug 2026
6 Aug 2026
27 Aug 2026
6 Aug 2026
26 Aug 2026
6 Aug 2026
6 Aug 2026 - 9 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HVAC BOQ | - | - | - | - |
| 2 | Split AC | - | - | - | - |
| 3 | Supply, Installation, Testing & Commissioning (SITC) of 3.0 TR High Wall Split Type Air Conditioner complete with Indoor Unit (IDU), Outdoor Unit (ODU), inverter rotary/scroll compressor, R-32 or any eco-friendly refrigerant, wireless remote controller,wall mounting accessories, vibration isolators, refrigerant charging, testing and commissioning complete.
The unit shall be suitable for operation on 415V ±10%, 50 Hz, 3 Phase AC power supply and capable of cooling, dehumidification and air circulation. The AC shall deliver rated cooling capacity up to 42°C ambient temperature and operate safely up to 50°C outdoor ambient temperature. The equipment shall comply with IS 1391 (Part-II): 2023 and relevant BIS standards. Minimum 5 years OEM warranty on compressor and PCB. Complete as required and as per site conditions. Note:- Outdoor unit stand fabicated or L-type shall be consider in this price. | - | - | - | - |
| 4 | 3 TR (1200CFM) Split Ac | 2 | Nos | - | - |
| 5 | Supply, laying, testing and commissioning of refrigerant grade seamless copper piping comprising 3/8" (9.52 mm OD) liquid line and 5/8" (15.88 mm OD) gas line suitable or equivalant to 3.0 TR Split Air Conditioner, complete with 19 mm thick closed cell elastomeric nitrile rubber insulation with GC cloth , fittings, bends, supports, brazing, nitrogen pressure testing, vacuumization and commissioning complete as required. individual piping cannot be consider. Note- all the piping should be laid on cable tray. normal Drill should be part of the piping installation. | 30 | RMT | - | - |
| 6 | Supply, laying, testing and commissioning of 4 Core x 2.5 Sq.mm FRLS copper power cable or as require for 3.0 T split AC from electrical panel to Outdoor Unit (ODU) of 3.0 TR Split Air Conditioner, complete with glands, lugs, termination and testing as required. | 30 | RMT | - | - |
| 7 | Supply, laying, testing and commissioning of 4 Core x 1.5 Sq.mm FRLS copper interconnecting power/control cable or as require for 3.0T Split AC between Outdoor Unit (ODU) and Indoor Unit (IDU) of 3.0 TR Split Air Conditioner, complete with terminations and connections as per OEM recommendations. | 30 | RMT | - | - |
| 8 | Supply and fixing of 100 mm × 75 mm heavy-duty PVC C-Casing/Trunking with cover, bends, tees, reducers, end caps and accessories for routing insulated copper refrigerant piping, drain pipe and interconnecting cable of 3.0 TR Split Air Conditioner, complete as required. | 30 | RMT | - | - |
| 9 | SITC PVC drain pipe having pressure holding of 6kg/cm2. Drain piping complete with all accessories with 12mm Nitrile Rubber Insulation. normal Drill should be part of the piping installation. | - | - | - | - |
| 10 | 25 mm Dia. | 20 | RMT | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
TD.pdf
Tender Documents • 1.19 MB
AnnexureForm.xls
Additional Documents • 0.12 MB
BOQ_967744.xls
BOQ • 0.30 MB
Corrigendum.pdf
PDF • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].