Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.9 L+₹10,327.43 (3.66%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.9 L+₹11,798.57 (4.18%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹5,880
Closing Date
7 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW BANDIPORA
EXECUTIVE ENGINEER REW BANDIPORA
CONST. OF DEVRI STONE GATE AT EIDGAH WARD 05 AT BAHAR ABAD B
2026_RDPR_317679_34
NIT29
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW BANDIPORA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹5,880
16 Aug 2026
24 Jul 2026
8 Aug 2026
24 Jul 2026
7 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in trenches for foundations, drains, pipes, cables etc. (≤1.5m width, ≤10 sqm plan), dressing sides, ramming bottoms, lift up to 1.5m, disposal of surplus earth, all kinds of soil. | 7.88 | cum | 479.3 | ₹3,776.88 |
| - | Dry stone soling, hand packed, including all carriages complete. | 0.38 | cum | 1,200 | ₹456 |
| - | Cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate, 40mm size), curing, excluding centering/shuttering, including carriage. | 0.34 | cum | 5,202.9 | ₹1,768.99 |
| - | RCC 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate, 20mm size), curing, excluding centering/shuttering/finishing/reinforcement, including carriage, for underground pillars & tie beam. | 3.31 | cum | 7,788.4 | ₹25,779.6 |
| - | RCC 1:1.5:3 (same as above), curing, excluding centering/shuttering/finishing/reinforcement, including carriage, for above-ground pillars & arch beam. | 2.75 | cum | 9,395.7 | ₹25,838.18 |
| - | Centering & shuttering including strutting, propping & removal for arch beams. | 9.45 | sqm | 2,281.2 | ₹21,557.34 |
| - | Centering & shuttering including strutting, propping & removal for foundations, footings, | 13.12 | sqm | 286.35 | ₹3,755.48 |
| - | Centering & shuttering including strutting, propping & removal for columns | 11.88 | sqm | 742.55 | ₹8,821.49 |
| - | Carriage ofSAND (lead 3 km). | 2.73 | cum | 165.84 | ₹452.74 |
| - | Carriage ofAGGREGATES (lead 20 km). | 5.46 | cum | 409.94 | ₹2,238.27 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_1042630.xls
BOQ • 0.25 MB
corrigendum.pdf
PDF • 0.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .