Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC BARHAIT SAHIBGANJ GODDA JHARKHAND 816102 | SAHEBGANJ | JHARKHAND | 816102 | ₹2.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.6 Cr+₹23.7 L (9.94%)Rejected-AOC | ₹2.6 Cr+₹23.7 L (9.94%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | RABBANI CONSTURCTION PRIVATE LIMITED L1 | M/S ASHOK MANDAL L2 |
|---|---|---|---|---|---|
| 1.00(1) Construction of Phy, Chem, Bio lab at GOVT HS PAHARPUR DIGHI, DIST: GODDA, BLOCK: THAKURGANGTI (20080800802) (2) Construction of Phy, Chem, Bio lab at UPG GOVT PLUS 2 HS MORDIHA, DIST: GODDA, BLOCK:THAKURGANGTI (20080801101) (3) Construction of Phy, Chem, Bio lab at UPG GOVT+2 HS KHARKHODIYA, DIST: GODDA, BLOCK:THAKURGANGTI (20080801902) (4) Construction of Phy, Chem, Bio lab at GOVT HS MAL MANDRO, DIST: GODDA, BLOCK: THAKURGANGTI (20080806402) (5) Construction of Phy, Chem, Bio lab at GOVT HS CHANDA, DIST: GODDA, BLOCK: THAKURGANGTI (20080808002) (6) Construction of Phy, Chem, Bio lab at UPG GOVT PLUS 2 HS BISWASH KHANI, DIST: GODDA, BLOCK: MAHAGAMA (20080110401) (7) Construction of Phy, Chem, Bio lab at GOVT HS RAMLA, DIST: GODDA, BLOCK: GODDA (20081009702 | |||||
| 2.00 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and
direction of E/I. | 920.43 | CUM | 135.18 ₹1,24,423.73 Lowest | 151 ₹1,38,984.93 |
| 3.00 | Extra for earth work in hard soil as per specification and direction of E/I. (vide
classfication of soil item - B) 50% of excavated earth | 460.22 | CUM | 13.81 ₹6,355.64 Lowest | 15 ₹6,903.3 |
| 4.00 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted
volume). | 1,188.43 | CUM | 49.22 ₹58,494.52 Lowest | 55 ₹65,363.65 |
| 5.00 | Providing coarse clean sand in filling in foundation trenches or plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts includng cost of all materials, Labour, rotalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted
volume). | 136.82 | CUM | 524.9 ₹71,816.82 Lowest | 589 ₹80,586.98 |
| 6.00 | Providing designation 75B brick work in
C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of
F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening maerials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per
building specification and direction of E/I. | 75.47 | CUM | 4,550.75 ₹3,43,445.1 Lowest | 5,110 ₹3,85,651.7 |
| 7.00 | Providing designation 75 B brick work in
C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building
specification and direction of E/I. | 556.09 | CUM | 4,832.27 ₹26,87,177.02 Lowest | 5,427 ₹30,17,900.43 |
| 8.00 | Providing designation 125 mm thick reinforced designation 75A brick work in CM (1:4) in superstructure with approved quality of clean coarse sand of F.M. 2 to 25 including the cost of screening, carriage of materials, scaffolding , raking out joints to 15mm depth, curing, taxes and royalty (but excluding the cost of reinforcement) all complete as per building specification and direction of E/I. | 158.76 | SQM | 635.29 ₹1,00,858.64 Lowest | 713 ₹1,13,195.88 |
| 9.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) | 103.46 | CUM | 3,673.27 ₹3,80,036.51 Lowest | 4,125 ₹4,26,772.5 |
| 10.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone- III): 6 graded stone aggregate 40 mm
nominal size) | 49.83 | CUM | 3,673.27 ₹1,83,039.04 Lowest | 4,125 ₹2,05,548.75 |
Tender Value
₹2.7 Cr
EMD Value
₹2.7 L
Closing Date
9 Feb 2026, 2:00 pmClosed
State Project Director
Office of State Project Director JEPC
Construction of Phy, Chem, Bio lab in different govt. school at GODDA District in SANTHAL PARGANA Division of jharkhand.
2026_HRD_109816_25
JEPC/CIV/03/2015/2026/273
Open Tender
Civil Works
Item Rate
270 days
GODDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹2.7 L
10 Jul 2026
28 Jan 2026
10 Feb 2026
28 Jan 2026
9 Feb 2026
28 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (1) Construction of Phy, Chem, Bio lab at GOVT HS PAHARPUR DIGHI, DIST: GODDA, BLOCK: THAKURGANGTI (20080800802)
(2) Construction of Phy, Chem, Bio lab at UPG GOVT PLUS 2 HS MORDIHA, DIST: GODDA, BLOCK:THAKURGANGTI (20080801101)
(3) Construction of Phy, Chem, Bio lab at UPG GOVT+2 HS KHARKHODIYA, DIST: GODDA, BLOCK:THAKURGANGTI (20080801902)
(4) Construction of Phy, Chem, Bio lab at GOVT HS MAL MANDRO, DIST: GODDA, BLOCK: THAKURGANGTI (20080806402)
(5) Construction of Phy, Chem, Bio lab at GOVT HS CHANDA, DIST: GODDA, BLOCK: THAKURGANGTI (20080808002)
(6) Construction of Phy, Chem, Bio lab at UPG GOVT PLUS 2 HS BISWASH KHANI, DIST: GODDA, BLOCK: MAHAGAMA (20080110401)
(7) Construction of Phy, Chem, Bio lab at GOVT HS RAMLA, DIST: GODDA, BLOCK: GODDA (20081009702 | - | - | - | - |
| 2 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and
direction of E/I. | 920.43 | CUM | - | - |
| 3 | Extra for earth work in hard soil as per specification and direction of E/I. (vide
classfication of soil item - B) 50% of excavated earth | 460.22 | CUM | - | - |
| 4 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted
volume). | 1,188.43 | CUM | - | - |
| 5 | Providing coarse clean sand in filling in foundation trenches or plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts includng cost of all materials, Labour, rotalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted
volume). | 136.82 | CUM | - | - |
| 6 | Providing designation 75B brick work in
C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of
F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening maerials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per
building specification and direction of E/I. | 75.47 | CUM | - | - |
| 7 | Providing designation 75 B brick work in
C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building
specification and direction of E/I. | 556.09 | CUM | - | - |
| 8 | Providing designation 125 mm thick reinforced designation 75A brick work in CM (1:4) in superstructure with approved quality of clean coarse sand of F.M. 2 to 25 including the cost of screening, carriage of materials, scaffolding , raking out joints to 15mm depth, curing, taxes and royalty (but excluding the cost of reinforcement) all complete as per building specification and direction of E/I. | 158.76 | SQM | - | - |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) | 103.46 | CUM | - | - |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone- III): 6 graded stone aggregate 40 mm
nominal size) | 49.83 | CUM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
25.pdf
Tender Documents • 1.39 MB
BOQ_148481.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .