| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC 140 SECTOR 7 IMT MANESAR MANESAR GURGAON GURGAON HARYANA 122051 | GURUGRAM | HARYANA | 122051 | ₹9.8 L | L1 | Accepted-AOC LOWEST QUOTED BIDDER |
| 2 | L2₹12.0 L+₹2.1 L (21.7%)Rejected-Finance NO 1073 K R SQUARE 15TH CROSS 30TH MAIN BANASHANKARI 2ND STAGE BANGALORE KARNATAKA 560070 | BENGALURU URBAN | KARNATAKA | 560070 | ₹12.0 L+₹2.1 L (21.7%) | L2 | Rejected-Finance NOT THE LOWEST QUOTED BIDDER |
| 3 | L3₹12.8 L+₹3.0 L (30.3%)Rejected-Finance A 41B CAPE ELECTRIC PRIVATE LIMITED SIPCOT INDUSTRIAL GROWTH CEN ORAGADAM SRIPERUMBUDUR KANCHEEPURAM TAMIL NADU 602105 | KANCHIPURAM | TAMIL NADU | 602105 | ₹12.8 L+₹3.0 L (30.3%) | L3 | Rejected-Finance NOT THE LOWEST QUOTED BIDDER |
Tender Value
₹14.5 L
EMD Value
₹29,000
Closing Date
9 Sept 2021, 6:00 pmClosed
CWE AF SECUNDERABAD
CWE AF SECUNDERABAD Bowenpally Post Secunderabad 500011
CONSULTANCY SERVICES FOR COMPREHENSIVE AUDIT AND STUDY OF DESIGN OF EARTHING AT AFS HAKIMPET AND CONSULTANCY SERVICES FOR EARTHING SYSTEM AND LIGHTENING PROTECTION SYSTEM AT AFS BEGUMPET UNDER GE AF HAKIMPET
2021_MES_465956_1
84665/03/E8
Open Tender
Civil Works
Item Rate
120 days
GE AF HAKIMPET
ASPER NIT
9 documents required · 9 mandatory
₹500
GE AF HAKIMPET
₹29,000
Yes
14 Sept 2021
6 Aug 2021
11 Sept 2021
6 Aug 2021
9 Sept 2021
26 Aug 2021
6 Aug 2021 - 23 Aug 2021
Amount
Carrying out Soil Resistivity Test at various locations complete as per the following :-
(a) Methodology
Wenner Four Point method or as per latest IS as directed by Engineer- in -Charge
(b) Meter to be used
Variable Voltage and Variable Frequency Meter as required and directed (Make: Megger / Fluke)
(c) Audit Report to be submitted consisting of
(i) Soil resistivity table
(ii) Trend graph of average soil resistivity versus probe spacing
(iii) Inference on nature and type of soil
(iv) Executive Summary
Carrying out Earth electrode resistance Test at various locations complete all as per the following :-
(a) Methodology
Fall of potential method/Stakeless method as per site condition and as directed
(b) Meter to be used
Variable Voltage and Variable Frequency Meter as required and directed (Make: Megger/Fluke)
(c) Audit Report to be submitted consisting of
(i) Earth electrode resistance table
(ii) Comparison of measured resistance with calculated resistance
(iii) Earth grid resistance
(iv) Obervations on health and condition of earth electrode
(v) Recommendation
(vi) Executive summary
Carrying out continuity test between two Electrodes complete all as per the following :-
(a) Methodology
Impedence measurement
(b) Meter to be used
Impedence measurement kit / Digital Low Resistance Ohmmeter
(c) Audit Report to be submitted consisting of
(i) Table of measured impedence between two electrodes and calculated impedence
(ii) Pin point discontinuity between two earth electrodes
(iii) Obervations on health and condition of earth conductor
(iv) Recommendation
(v) Executive summary
Carrying out continuity test between Electrode / Earth Grid and connected equipment complete all as per the following :-
(a) Methodology
Impedence measurement
(b) Meter to be used
Impedence measurement kit / Digital Low Resistance Ohmmeter
(c) Audit Report to be submitted consisting of
(i) Table of measured impedence between earth electrode and equipment and calculated impedence
(ii) Pin point discontinuity between earth electrode and equipment
(iii) Obervations on health and condition of earth conductor
(iv) Recommendation
(v) Executive summary
Checking the health of existing Lightning Protection System (LPS) and designing internal LPS and external LPS in compliance of IS/IEC 62305 for 06 buildings at AFS Hakimpet and AFS Begumpet all as under:-
(a) Methodology
(i) Data collection for all structures.
(ii) Physical observation and tests on existing LPS system.
(iii) Type of and number of air terminals.
(iv) Down conductor condition.
(v) Down conductor continuity test on sample basis.
(vi) Soil resistivity test on sample basis.
(vii) LPS earth electrode resistance test on sample basis.
(viii) Risk assessment.
(ix) Design Of LPS system.
(x) Elevation drawings Of structures with proposed LPS.
(xi) Detailed bill Of materials for LPS and SPD.
(b) Design Report to be submitted consisting of
(i) Observation & test results Of existing lightning protection system
(ii) Screen Risk assessment
(iii) Details Of structures requiring external And internal protection
(iii) Structure elevation drawings showing details of proposed LPS
(iv) Detailed bill of materials for LPS and SPD
(v) Recommendation
(vi) Executive Summary
Hard copy of Audit / Design Report complete all above including design Folder (03 Copies) and Estimation shall be submitted as per Time Schedule.
NOTES :- (a) The bidder shall ensure that the design of earthing shall be in such way that to achieve the earth resistance value will be less than one ohm on all climatic conditions continuously at least for Ten years in all locations mentioned in the schedule.
(b) The bidder has to clearly mention three to four makes of the different components of the system conventional,chemical or any new version of the earthing system. In case the recommendation is only for a particular brand(proprietary item) a certificate of undertaking duly authenticated from the firm should also submitted along with the recommendation and test results
(c) Carrying out soil investigation to assess the various parameters of the strata/various type of equipment and installed machineries to finalise the type, system, composition and quantity of materials and chemicals required to achieve the earth resistance value less than one Ohm in all climate continuously at least for 10 years in the locations. The details of soil examinations the results, protocol, and the obtained values in tabulated form along with the clear technical specification of each type of earthing suits to different location mention here before to achieve and maintain the desired results continuously for a period of not less than 10 Years. The bidder has to clearly to mention three to four makes of the different components of the system conventional, chemical or any new version of the earthing system.
(d) Any clarification raised by User/Engineer in Charge on final report shall be promptly addressed by the bidder
(e) The rate quoted for the above shall include required number of site visits of the Engineers/technical expert of the firm during the investigation and at the time of execution by the same firm or by any other agency to ensure the quality of workmanship so as not to leave any chance of dispute over the chemical materials or workmanship.
(f) The report submitted shall not share published to any other agency and all the details must be treated as confidential.
(g) The rate quoted shall include to provide the required instruments,tools,equipments and manpower for excavation/digging and making good the area after conducting the investigation by the firm
(h)The required number of earth pits and confirguration of the pits within the space available/allotted for earthing along with coloured drawing shall also submit with the report.
JEF Techno Solutions Private Limited
CAPE electric pvt ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .