| Sl No | Description | Qty | Unit | APOLLO TRANSFORMERS AND FILTERS L1 | R K ELECTRICALS L2 |
|---|---|---|---|---|---|
| 1.00 | Disconnection of HV Power cable & its terminal box and earth flats. | 1 | No | 1,820 ₹2,147.6 Lowest | 1,890 ₹2,230.2 |
| 2.00 | Disconnection of LV Power cable & terminal box / LV bus duct terminal connection &Terminal Box. | 1 | No | 3,950 ₹4,661 Lowest | 4,000 ₹4,720 |
| 3.00 | Releasing the old transformer oil from tank and Releasing the radiator cooling fins, valves and cleaning by using forced oil method. | 1 | No | 8,200 ₹9,676 Lowest | 8,250 ₹9,735 |
| 4.00 | Releasing the Buchholz relay, conservator tank, vent, pipe, oil & winding temperature gauges, Disconnection of winding CT terminals. | 1 | No | 7,150 ₹8,437 Lowest | 7,200 ₹8,496 |
| 5.00 | Charges for leading and shifting of power transformer without oil from AHP-II service Transformer location to Unit-V repair bay.(5 Ton X 350Mtr=1750 Ton/Mtr) | 1,750 | Ton/Mtr | 35,875 ₹42,332.5 Lowest | 38,500 ₹45,430 |
| 6.00 | Removing the top cover of the transformer and Disconnecting the HV/LV leads from Bushings and lifting the core and winding. | 1 | No | 5,480 ₹6,466.4 Lowest | 5,500 ₹6,490 |
| 7.00 | Complete cleaning of the Tap switch and attending defects if any during testing. | 1 | No | 4,720 ₹5,569.6 Lowest | 4,800 ₹5,664 |
| 8.00 | Cleaning servicing and gasket replacement to Buchholz relay, MOG, oil level gauge glass, explosion vent pip, conservator tank, silicage & replacement of diaphram | 1 | No | 7,990 ₹9,428.2 Lowest | 8,100 ₹9,558 |
| 9.00 | Dismantling of HV & LV Bushings, cleaning, checking the bushing rods, replacing the deteriorated O rings & gaskets by new, assembling and fixing in the transformer tank. | 1 | No | 9,990 ₹11,788.2 Lowest | 10,100 ₹11,918 |
| 10.00 | Repositioning of the core & winding assembly in Transformer tank and reconnecting the HV / LV leads. | 1 | No | 3,580 ₹4,224.4 Lowest | 3,650 ₹4,307 |
Tender Value
Refer Docs
EMD Value
₹2,200
Closing Date
1 Nov 2025, 2:00 pmClosed
CE/TTPS
Chief Engineer Tuticorin Thermal Power Station-Tuticorin
TTPS ES Circle EM III Charges for arresting oil leak in the LV bushing and improve the BDV of transformer oil in 1 6MVA AHP II during the AOH Period of both Unit IV V service transformer B of Unit IV V
2025_EB_615465_1
CE/SE/ES/TTPS/No.171/2025-26
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
TTPS
As per BQR conditions in NIT
6 documents required · 6 mandatory
₹0
₹2,200
Yes
18 Nov 2025
17 Oct 2025
3 Nov 2025
17 Oct 2025
1 Nov 2025
17 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_735362.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .